模板拆裝工作 的英文怎麼說
中文拼音 [móbǎnchàizhuānggōngzuò]
模板拆裝工作
英文
form handling- 模 : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
- 板 : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
- 拆 : 拆動詞[方言] (排泄大小便) excrete
- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
- 拆裝 : dismounting拆裝架 assembling and disassembling stand
-
They include the framework of product long - distance maintenance guiding system, fault diagnose, automatically making of maintenance technics, the query of information and the visual leading. according to b / s model, the author puts forward system structure of product maintenance guiding system based on network. the dissertation introduces the main technologies for the realization of maintenance guiding system, the data structure of product fault and order of disassembly and assembly, and the way to get the preliminary data
本論文對產品維修向導系統的幾個部分:包括產品維修向導系統的體系結構、故障診斷、維修工藝的自動生成、資源信息查詢和可視化引導的有關技術進行研究;根據web技術b / s模式結構和產品維修過程提出基於網路的產品維修向導系統的體系結構;介紹了維修向導系統的具體實現中的一些主要技術和產品故障數據結構、拆裝順序數據結構的設計以及這些數據表的原始數據獲得方法;對產品故障診斷採用的決策樹方法作了介紹;重點對產品故障診斷和產品各零部件的拆裝順序關系以及資源信息的查詢進行了實現;針對轎車卡板式門鎖,開發了產品維修向導系統的實例。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables
本論文採用自編平面桿系施工裝配計算程序和大型結構分析程序- ansys ,通過分別建立該橋的平面和空間模型(含模板的作用模擬) ,由平面桿系程序倒拆出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的施工過程模擬計算之後得出達到目標索力的合理的施工步驟。
分享友人