模板間隙 的英文怎麼說

中文拼音 [bǎnjiān]
模板間隙 英文
die clearance
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  • 間隙 : (空隙) interval; gap; freedom; space; [機械工程] clearance; separation; stricture; clear; inter...
  1. The springback angle increases with the increase of the punch round radius and clearances between the punch and the die while decreases with increase of the blank holder force, sheet thickness, friction coefficient and material hardening exponent

    回彈角隨凸圓角半徑和凸凹的增大而增大,隨壓邊力、料厚度、摩擦系數和材料硬化指數的增大而減小。
  2. The flow between two gaps in the new type of axial trust balancing device was assumed as laminar move, and the flowing physical model in these two gaps was simplified into laminar move in the gaps between two parallel plates

    摘要將新型軸向力平衡裝置兩個中的流動假設為層流,並將兩個流動的物理型簡化為平行的層流運動,推導出了徑向與?漏量關系式和考慮離心力效應時軸向與?漏量的關系式。
  3. The author advances that the shear connector is simulated by two spring elements, which are vertical to each other and parallel to the interface between steel and concrete, and one multipoint constraint element, mpc element, which is vertical to the interface. the author also puts forward that the crack of the deck is simulated by the gap element which ca n ' t support longitudinal tensile force but can support longitudinal compressive force

    提出了以正交的兩個平行於鋼和混凝土界面的彈簧單元及一個垂直於界面的多點約束( mpc )單元來擬剪力鍵,以小接觸( gap )單元來擬混凝土橋面的開裂,型中忽略了混凝土與鋼梁接觸面由摩阻而產生的粘著力。
  4. The relation between rheological breaking ratio and plastic work is set up according to the equation relation between outer plastic work and energy of plastic deformation. it is helpful to the understanding of elasto - plastic constitutive relationship of rockfill and braking of particles. based on analysis of test result, in - site observation data, this paper put forward a quantitative relation between rheology and valley shape, rockfill mechanical parameters, such as dry density, compressive modulus, softening factor, pore ratio, etc. the main factors influencing the rheological behavior of rockfill can be classified into inner factors and outer factors

    堆石作為面壩的主體,影響其流變的因素頗多且十分復雜,既有內因也有外因,根據試驗、原型觀測資料對內外因素所做的分析,本文提出了流變與河谷形狀等外因、流變與壩體常規物理力學指標等內因的定量關系和影響堆石流變的多因素綜合表達式,由此建立了堆石流變與堆石常規物理力學指標(如干密度、壓縮量、軟化系數、孔比等等)之的聯系。
  5. By employing one - dimension planar gap model, the physical mechanism of rtto is studied by single electron theory approximately

    採用一維平型,運用單電子理論分析了rtto的工作機制。
  6. Using maxwell electromagnetic equations, by solving the boundary - value problem of magnetic vector potential, analytical expression to impedance increment of the solenoid coil in eddy current testing of the medium in half space was given. theoretical result was modeled in computer. results showed the validity and feasibility of the model

    利用maxwell電磁方程組,通過求解矢量磁位的邊值問題得到了矢量磁位的解析解,進而導出了媒質上方放置式空心線圈的阻抗增量解析式,並對阻抗變化表達式進行單層厚度和三層的檢測型進行了擬。
  7. This paper designs the icicle - iced plate model based on the ice - covered insulators and makes an investigation in artificial climate chamber by using corocam iv + and data acquisition card and so on

    本文根據絕緣子覆冰后傘裙邊緣的冰凌特徵設計了冰柱-冰型,利用紫外線成像儀和數據採集卡等設備,在人工氣候室內對該型進行了試驗研究。
  8. By means of the method of combining theoretic analysis with mathematic calculation, the mathematic model of medium mill ' s electromechanical twist vibration was established, the whole response of the system in transition process was obtained by the solution of the model, the clearance and skid of main transmission system were analyzed in rolling process, and they were studied with computer simulation

    摘要採用理論分析和數值計算相結合的方法建立了中厚軋機機電扭振數學型,通過對該型的求解,得到系統在過渡過程中的全部響應,且對軋機在軋制過程中的主傳動系統的和打滑兩種狀態進行了分析,並對此進行了計算機擬研究。
  9. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給工程及預應力張拉帶來一定困難;支撐系統連接的變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人