橋井 的英文怎麼說

中文拼音 [qiáojǐng]
橋井 英文
hashii
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. Construction of pylon pier caisson of haikou shiji bridge

    海口世紀大主墩沉施工
  2. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、梁、防浪堤、水庫堤壩、隧道、機場跑道、市政工程蓋(防盜) 、礦巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  3. Bdi gratings can be widely applied to platform, pathway, bridge, trench covers, well covers, fences and handrails at systems of petro - chemicals, power plant, water plant, sewage treatment plant, urban construction engineerings and urban sanitary engineerings

    產品的應用廣泛應用於石油化工電廠水廠污水處理廠市政工程環衛工程等領域的平臺走道棧溝蓋蓋梯子圍欄護欄等。
  4. In qiaokou area, deep parts of well qiaol4, 20, 23, 25, 60 are related to source rock in gegangji sag, while crude oil in well qiao38 is related to source rock in qianliyuan sag ; in baimiao structure, crude oil in well bail2 is related to source rock of es33 - es34 in qianliyuan sag, while condensate in well bai54, 17, 9 is related to source rock of es32 in qianliyuan sag and crude oil in well bai6 is from oil kitchen gegangji. the study on illite age testing, inclusion enclave temperature testing and saturation pressure testing has been used to know the time of the deeply buried gas net pay formed. the time of the deeply buried gas net pay formed can be divided into two stages

    油源對比結果表明杜寨地區濮深15的凝析油來源於本區es _ 3 ~ 3 es _ 3 ~ 4地層,前8es _ 3 ~ 2原油來源es _ 3 ~ 2地層;口地區東翼葛崗集窪陷一側的14 、 20 、 23 、 25 、 60深層油氣與葛崗集窪陷烴源巖有關,口壘塊38原油與前梨園窪陷烴源巖有關;白廟構造翼部白12原油主要與前梨園窪陷es _ 3 ~ 3 es _ 3 ~ 4段烴源巖有關,構造腰部白54 、 17 、 9等的凝析油與前梨園窪陷es _ 3 ~ 2段烴源巖有關,白16原油來源於葛崗集生油窪陷。
  5. The ceramic carving of qingming shanghe tu, composed of 1352 ceramics, of 62 meter long and 2. 48 meters high, is 100 times of the original scroll painting. the master - of - art depicted vividly the folklore people and their lives in the markets, sights of bridges, castles and boats of the age to the details. the time, efforts spent and the excellence in craftsmanship are beyond description

    48公尺,全圖由1352塊陶瓷所燒成的,延展開來的畫,生動地描繪出市梁、城郭、舟車、人物,這幅藝術畫作除了費時費力,如何讓每一塊的圖樣能夠契合得恰到好處,其中的功夫可是了不得的一門學問。
  6. It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up

    本船改建后為非自航固定式起重船,以港口及平水區域作業為主,可在我國沿海ii類航區中調遺拖航,適用於打撈船舶港口建設梁吊裝裝卸重大物件,以及海上石油鉆採油平臺和其他海上弔裝工程。
  7. From right : shkp executive director financial services au man to, hideo hiyama, director, general manager regional chief executive of sumitomo mitsui banking corporation, rose lee, hsbc managing director head of corporate banking hong kong, shkp executive director financial services amy kwok, xavier roux, senior country officer of calyon hong kong branch and adrian li, general manager head of corporate banking with the bank of east asia

    右起:新鴻基地產金融服務執行董事區文道三住友銀行執行役員香港支店長檜山英男香港上海匯豐銀行香港區企業銀行業務常務總監兼香港區主管李慧敏新鴻基地產金融服務執行董事郭婉儀東方匯理銀行香港區行政總裁xavier roux東亞銀行總經理兼企業銀行主管李民
  8. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    斜拉墩設計為鋼筋混凝土圓端型沉結構,其中詳細介紹了沉下沉施工技術,同時介紹了水下松動控制爆破技術。
  9. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉施工技術,詳細敘述了主墩大型沉施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  10. As the last duty before leaving this part of england it was necessary for him to call at the wellbridge farmhouse, in which he had spent with tess the first three days of their marriage, the trifle of rent having to be paid, the key given up of the rooms they had occupied, and two or three small articles fetched away that they had left behind. it was under this roof that the deepest shadow ever thrown upon his life had stretched its gloom over him

    在他離開英格蘭之前,他必須做的最後一件事就是去拜訪的農舍,在那座農舍里,他們舉行婚禮后最初的三天是在那兒度過的,他要去那兒把不多的房租付給房主,還有他們住過的房門的鑰匙也得還回去,另外,他還有離開時留在那兒的兩三件小物品要取回來。
  11. Fiber - reinforced plastics cable support rack in coal mine

    煤礦下用玻璃鋼電纜
  12. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉充填、錨體澆築、主纜架設、箱梁吊裝、面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  13. On the one hand, saib is providing with the world expo 2010 shanghai, china with insurance consultancy, on the other hand it has successfully arranged the placement for comprehensive insurance program of china commerce ministry for fishermen in taiwan, the off - shore platforms by sinopec and terminal ' s operator liability insurance in waigaoqiao and agriculture insurance in suzhou

    公司除正在為中國2010年上海世博會提供保險咨詢服務外,還成功完成了國家商務部對臺漁工綜合保險、中石化石油鉆平臺保險、上海外高大型集裝箱碼頭綜合保險、蘇州市政策性農業保險等多個重大項目的風險管理和安排。
  14. The proprietor of a large old water - mill at wellbridge - once the mill of an abbey - had offered him the inspection of his time - honoured mode of procedure, and a hand in the operations for a few days, whenever he should choose to come

    有一處古老的很大的磨坊產業過去曾經是寺院的產業磨坊主已經答應了他,讓他去參觀磨坊古老的生產模式,或者去幫忙操作幾天,什麼時間去都行。
  15. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大基礎獨創性地採用雙壁鋼沉圍堰鉆孔樁基礎,鋼圍堰在梁基礎施工中的應用越來越多。
  16. As the largest coal mining machinery manufacturer, the chinacoal zhangjiakou coal mining machinery co., ltd. mainly produces flexible afc and related compatible bridge stage loader, crusher, matilda unit and plough used underground, consisting totally 500 sizes, 82 series and 10 categories

    公司作為我國最大的煤礦專用設備製造企業,主要產品是煤礦下採煤工作面用可彎曲刮板輸送機及其配套的式轉載機、破碎機、皮帶機自移機尾、轉載機自移裝置、刨煤機等,現有產品10大類82個系列約500多個規格。
  17. A deformational particle with oil - soluable property is used as a bridge plug to build a shielding layer in the oil - gas reservior channel, to prevent the pollution caused by drilling mud entering the reservior due to the pressure difference, and so to protect the oil - gas reservior

    摘要用一種具有油溶性質的可變形粒子做塞物,在油氣儲層通道中建立堵屏蔽層,防止由於壓差造成鉆泥漿進入儲層而形成污染,從而起到保護油氣儲層的作用。
  18. She found him determined to spend a short time at the wellbridge flour - mills

    苔絲發現,他已經決定到的麵粉廠去住一段時間。
  19. Analysis to the deposit environment and coal forming model in permian period in yong - xia xin - qiao coal field

    永夏煤田新橋井田二疊系沉積環境與聚煤規律淺析
  20. They drove by the level road along the valley to a distance of a few miles, and, reaching wellbridge, turned away from the village to the left, and over the great elizabethan bridge which gives the place half its name

    他們沿著谷中的平坦大道趕車走了幾英里的路,就到了村,然後轉彎向左走,穿過伊麗莎白,正是這座村才帶了一個字。
分享友人