橋梁架設 的英文怎麼說

中文拼音 [qiáoliángjiàshè]
橋梁架設 英文
bridge erection
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • 橋梁 : bridge; approach
  • 架設 : set up; erect
  1. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度懸臂澆築施工的各種形式掛籃施工工藝進行了比較和總結,對連續剛構懸臂澆築掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂澆築施工的新型桁斜拉式組合掛籃,並進行了可行性分析計算和計。
  2. Nowadays, the bridges are in wide use in china, many new types of bridges such as large span bridges, cloverleaf junction and complicated viaducts emerge

    近幾十年來,中國的突飛猛進,城市中大跨、立交工程和復雜高大量涌現。
  3. After that, through discussion about the landscape estimate criterion, the author summarizes it as follows : aspect relation and meaning. then, based on the landscape features of the urban viaduct rail transit along the no. 1 subway in hangzhou, the authors analyzes and summarizes the challenges that we must affront to and comment on the aspect of the styles and colors of the viaduct. at last, from a combined view with city planning, the author puts forward some advice about the improvement on the sculpt and colorific aspects of viaduct

    論文首先分析了高軌道交通的景觀特點和空間組合模式;通過討論景觀評價的標準,將景觀評價標準總結為外顯、關系、內涵三個方面;然後結合杭州市地鐵一號線工程,從外顯、關系、內涵三個方面分析高軌道交通可能產生的景觀影響問題;最後結合城市計的角度,對的造型和色彩等方面提出部分改進意見。
  4. Not only does go - space provide rich examples, but also go - space buildes a bridge between general topology and related mathem atics branches, such as lattics theory, domain theory, graph theory, real number theory, etc. thus it is very important in theory and reality to study go - space

    在go -空間中,不僅給一般拓撲學提供了精彩豐富的例證,而且了一般拓撲學和相關數學分支的,如格論、 domain理論、圖論及實數理論等等。
  5. A research over substructure design for jinbin light rail viaduct with jointless track

    採用無縫線路的津濱輕軌高下部結構計研究
  6. This paper deduces the equation groups of large span steel truss bridge which installed mr dampers of coupling vibration of vehicles and bridge. and provide the two strategies of semi - active control

    本文從理論上首次推導出置擬況阻尼器的大跨度鋼析禍合振動的系統受控方程並提出了兩種控制策略。
  7. The basic mechanics knowledge in bridge construction is involved to the basic knowledge in many branches such as theoretical mechanics, structural mechanics, material mechanics, flexible mechanics, structural dynamics, earth mechanics and hydraulics mechanics etc. to show the reason of research thinking of this paper, the intersectional theory among engineering mechanics, engineering construction and engineering supervision is studied, it mainly include following content 1 ) framework and structure the framework is the system or structural frame that can produce action

    2 、中的力學基礎知識涉及力學中的理論力學、結構力學、材料力學、彈性力學、結構動力學、土力學和水力學等諸多分支中的基礎知識。論文中對力學中的幾個概念進行了詳細的闡述,主要包括以下內容: 1 )機構與結構機構是指能夠產生運動的構或體系。
  8. Abstract : to account some difficult problems in theoretical calculation of blasting demolition of buildings, the criterion for disintegration of brick - concrete structures, blasting height of frame structure, counteracting force of supports are analyzed. a numerical simulation is demonstrated for structure ' s destabilization and dilapidation in the process of blasting demolition of buildings such as chimney and bridge, which services a guide for theoretical study and practice of blasting demolition of buildings

    文摘:針對建築物爆破拆除理論計算難以把握的幾個問題,如磚混結構解體的判據,框結構建築的爆高、支座反力,以及框結構失穩和煙囪、爆破拆除倒塌過程的數值模擬方法,進行了分析和說明,為建築物爆破拆除計理論研究與施工提供了參考依據。
  9. Assembly type bridge girder erecting equipment used at electrified railway section

    拼裝式斜交施工技術
  10. The computer supported sketching technology, as an extension and important development of computer aided design ( cad ) technology, has been bridging the gap between the freehand sketching on paper and cad, so as to make cad more perfect by supporting the whole process of product design

    計算機支持的草圖計技術在手繪創意草圖和計算機輔助詳細計之間起一道,是對傳統cad技術的完善和重要發展,也是計算機輔助工業計( caid )的關鍵技術,它真正實現了計算機技術對計全過程的支持。
  11. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的廠製造、經過鐵路運到工地、邊鋪邊進行製造與的傳統施工模式應用到該線是行不通的,必須在現場預制、並採用專門的運備進行橋梁架設,因此箱的製造、施工成為該線施工技術攻關的重點和難點。
  12. Concept vehicle is a brand - new thought and new style that designer demonstrates future automobile modeling development tendency to customer ; it will build up a communication vision art information bridge between designer and customer

    摘要當今世界,概念車是計師向人們展示未來汽車造型發展趨勢的一種全新意念和風格,它起了同客戶溝通視覺藝術的信息
  13. The 500 - tonne units were floated out on a barge, lifted into position and the cable stays connected. this bridge and the viaduct were built by the kumagai - maeda - yokogawa - hitachi joint venture under a hk 1. 643 billion contract. the joint venture comprises kumagai gumi hong kong ltd. and three japanese firms, maeda corporation, yokogawa bridge corporation and hitachi zosen corporation

    汲水門大及馬灣高道路工程合約價值港幣16 . 43億元,由熊谷前田橫河日立合營企業建造,該集團成員包括熊谷組香港有限公司和叄間日本公司,分別是前田建工業株式會社橫河株式會社和日立造船株式會社。
  14. When the prefabricated plant is under the viaduct, the monolithic box girder is lifted by the gantry crane and transported by the special rotary traversed platform, and then transported and erected by the bridge girder transporting and erecting machine

    當預制在高下時,採用提機提起整孔箱,通過特製旋轉式橫移平臺喂,運一體式機運
  15. Please note that each reservation site has different booking rules and procedures. as " accommodations japan " only facilitates the linkage between hotel accommodations and potential users, it accepts no responsibility for service suspension or failure, or other damages or loss arising from these, should any trouble regarding service contract between accommodations and potential customers arise. users of this service are requested to contact hotel accommodations directly for any questions they may have

    另外,日本住宿是為遊客接住宿預約網站和各個住宿施的,各網站與遊客簽訂的合同內容和手續不盡相同,因此,對客人和各網站、住宿施之間發生的糾紛等、對于日本住宿中任何不足或無法使用之項目,或對因為這些資訊造成任何損失或損傷不承擔任何責任。
  16. Erecting technique of movable steel truss beam for the transferbridge at north bank of yangtze river on xinyi - changxin railway

    新長鐵路長江輪渡棧活動鋼桁技術
  17. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜、箱吊裝、面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  18. This paper also makes brief description of the technical specifications, mechanical structure, major features of the italian beam transporting and erecting machine with type of nicola yj - 550, which was introduced firstly in china and chosen carefully in combination with the site conditions. the future beam erection and relevant design and construction can find the reference from description of this paper in terms of erection process for box beam, working efficiency of the italian beam transporting and erecting machine with type of nicola yj - 550, issues and revelations concerning about box beam erection, special beam erection method to avoid three legs supporting

    採用義大利nicolayj - 550型運一體機進行箱是結合現場實際開展技術攻關、精心選定的施工方法,該型機為國內首次引進,文中就其技術參數、組成結構、主要特點進行了簡要介紹;文中闡述的箱施工工序、運一體機的作業效益、施工應注意的問題及啟示、施工克服「三條腿」的方法等均可作為今後箱及與箱相關的計、施工工作的參考。
  19. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導解決大跨度鋼箱混凝土結合的鋼箱技術難題,重點闡述了施工方案,龍門吊、導計,工藝要點等。
  20. Compared with the segmental box girders technique, in - situ concrete box girder technique and mobile forming framework technique, this construction technique has the advantage of both high efficiency and short - time limit for a project

    這種高整孔箱的施工方法與節段箱、現澆箱、移動橫等施工方法相比,具有作業效率高、工期短的特點。
分享友人