橋梁車行道 的英文怎麼說

中文拼音 [qiáoliánghángdào]
橋梁車行道 英文
bridge carriageway
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 橋梁 : bridge; approach
  • 車行 : 1. a place where carts may be bought or hired2. garage3. a car dealer's
  1. A bridge or other structure over a road may restrict the actual headroom available

    路上的架空或其他架空建築物,使輛通的確實高度受到限制。
  2. Since the implementation of train speed - lifting program of railway department, both car and bridge dynamic function to the train running on the bridge has become a more important issue, in particular because of the insufficient strength and rigidity of part of bridge ' s horizontal structure, the horizontal vibration has topped the main obstacle to speed - lifting when rustling train passing the bridge

    隨著鐵部提速戰略的實施,動力作用對上運的影響已越來越受到人門的重視,特別是由於部分橫向剛度不足使列高速通過時結構橫向振動幅度超標已成為列提速的主要障礙。
  3. Class 1 - residential / light commercial snow melt : recommended for residential and light commercial walkways, driveways, entrances, and other light traffic ways, ramps and building entries

    冰雪融化系統實際上可安裝在任何地方,如停場、、裝卸區、、人、戶外階梯、檐槽、屋面天溝、屋頂、下水管,大約地表5厘米下的混凝土中。
  4. Translation the serious incident on the 11th of this month in which a cabin of the ngong ping 360 cable car system crashed to the ground has aroused my concern about the safety of other major infrastructures in hong kong, such as the road tunnels, major bridges and mass transit carriers

    昂平360纜系統于本月11日發生廂從高處墮下的嚴重事故,令本人關注到本港其他大型基建設施例如各大型,以及集體運輸工具的安全問題。
  5. It is 260m long and 20m wide ( including 14m of traffic lanes and 3m of pavement of each side ) with a designed load of grade 20 of automobile and grade 100 of trailer

    全長260米,寬20米,其中14米,兩邊人各3米,設計荷載為汽- 20級,掛- 100級。
  6. Article 10 departments in charge of highways may levy tools on vehicles that use motorways, first and second - grade highways, and large highway bridges, tunnels and ferry piers, which are built with loans or funds raised by the departments, in order to repay the loans or funds

    第十條公路主管部門對利用集資、貸款修建的高速公路、一級公路、二級公路和大型的公路、隧、輪渡碼頭,可以向過往輛收取通費,用於償還集資和貸款。
  7. Roads, footways, parks, car parks, parking spaces, recreational facilities and similar open spaces, bridges, drains, sewers and water courses and other transport and recreational facilities owned or held by the authority

    市建局所擁有或持有的人徑公園停位康樂設施及同類空地排水渠污水渠及水,以及其他交通及康樂設施。
  8. Manage any roads, footways, parks, car parks, parking spaces, recreational facilities and similar open spaces, bridges, drains, sewers and water courses and other transport and recreational facilities owned or held by the authority and may charge fees for the provision of such services

    管理任何由市建局擁有或持有的人徑公園停位康樂設施及同類空地排水渠污水渠及水,以及其他交通及康樂設施,並可就該等服務的提供收取費用
  9. Abstract : as the traffic and truck - loadings increase year by year, quite a lot of the bridges on highways and municipal streets are over - loaded and in need of strengthening or rehabilitation

    文摘:交通量逐年成倍增長以及輛載重量越來越大,使我國現有公路、城市路上的有相當一部分已不堪重負,需要採取必要措施進加固改建,以提高技術等級和通能力。
  10. Based on the analysis of the current status of highway bridge security examination of native and abroad, combing with the construction plan and operation condition of the highway bridges in hubei, this paper discusses the principle and method of highway bridge security examination, especially analyzes the relation of the traffic security with the facts such as the width of lane, transverse arrangement, security devices, environment and the geometrical line type which is formed by the longitudinal transverse technical target of bridges, and then raises the principle, content and program of the highway bridge security examination, in addition, this paper applies the bridge security examination to plan, design, construction and operation

    本文以國內外公路安全審查現狀分析為基礎,結合湖北省公路規劃建設與運營狀況,對公路安全審查的原理和方法進了探討,重點分析了平縱橫技術指標組合構成的幾何線形、寬度及橫向布置、安全設施、環境及其他相關因素等與交通安全的關系,提出了公路安全審查的原則、內容及程序,並分別對規劃、設計、施工及運營中的安全審查進了具體應用。
  11. Limited access highways, tunnels, bridges, elevated roadways, and air - right structures

    公路隧高架和航空用結構物的限定出入口
  12. According to different mechanisms, there exist several types of resonance, including the bridge resonance induced by the periodical actions of moving load series of the weights, centrifugal forces and lateral winds of vehicles, the bridge resonance induced by the loading rates of moving load series of vehicles, the bridge resonance induced by the periodical loading of train vehicles excited by rail irregularities, wheel flats and hunting movements, and the vehicle resonance induced by periodical actions of the regular arrangement of bridge spans and their deflections

    根據發生機理的不同,系統可能發生幾種不同形式的共振,包括由輛重量、離心力、橫向平均風荷載等形成移動荷載列的周期性動力作用引起的共振,由移動荷載列加載速率引起的共振,由軌不平順、輪扁疤、輪對蛇等周期性加載引起的共振;由跨的規則性排列及其撓度的影響,對移動輛形成周期性動力作用使輛出現的共振。
  13. According to the bearing load institute of mainly bearing component, the basic form of bridge can be classified into beam bridge, arch bridge, rigid frame bridge, suspension bridge and assembly system bridge etc. also according to the location of trip lane, it can be classified into top travel bridge, middle travel bridge and lower travel bridge

    的基本形式按主要承重構件的受力情況可分為:、拱、剛架、懸索、組合體系等;按的位置又可分為上承式、中承式和下承式
  14. Construction of a single two - lane carriageway of approximately 0. 7 km long with embankments and bridges between nam wai and nam pin wai

    在南圍與南邊圍之間建築一條長約0 . 7公里有高架路堤及的不分隔雙線
  15. The standard in bridges " designing load in xuanhua - datong speedway is auto - super 20, trailer - 120. because of transiting carrying coal vehicle mostly, investigating and measuring all vehicles carrying coal in 109 and analyzing and checking strength and intension of new bridges. in this way, ensuring to advance loading measure of over load and assuring safely operation in bridges according to the standard in bridges " designing load

    宣大高速公路設計荷載標準為汽?超20級,掛? 120 ,公路建成後主要通運煤重載輛,為此對現有高速公路旁全部的109國運煤輛進調研、量測,並以此對新結構受力及強度進了分析及驗算,以確定對重載輛提出發載措施,保證按高速公路設計荷載標準設計的能夠安全運營。
分享友人