橋環系統 的英文怎麼說

中文拼音 [qiáohuántǒng]
橋環系統 英文
bridged ring systems
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. In response to press enquiries on the " green ribbon hand - in - hand surrounding shing mun river " action by residents of park view garden and granville garden against the construction of the shing mun river channel bridge, a spokesman for the territory development department ( tdd ) reiterated today ( june 27 ) that the government needs to provide the bridge and the associated road gyratory system in heung fan liu street and mei tin road to cope with the growing traffic demand there

    就新聞界查詢翠景花園及恆峰花園居民反對興建城門河行車天而舉行的綠絲帶手牽手圍繞城門河行動,拓展署發言人今日(六月二十七日)重申政府有需要適時完成該行車的工程,以及位於香粉寮街及美田路的交通,以應付區內增加的交通流量。
  2. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫跨青山公路近水邊圍的現有行人天nf85拆除現有臺階斜道興建升降機槽及連接臺以連接該現有行人天改善近該行人天的巴士站及相關的道路排水境美化工程。
  3. Research on the bridge design system in cscw

    境下的梁設計研究
  4. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子組成, ( 1 )截污工程:在岸丘和南州位置各築一節制閘(而岸丘工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、湖林帶、綠色食品基地以及污泥處置。
  5. The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge

    提出了一種有效可行的錨跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索錨跨索股初張力精確控制的難題;建立了錨跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索索力測試中的應用問題;在上述研究成果的基礎上,研製出了錨跨張力控制,該具有穩定可靠,精度高,使用方便等特點,它的投入使用將為我國今後大跨徑懸索錨跨張力控制提供一種全新的、可靠的手段。
  6. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大是我國第一座現代懸索下部結構主要包括索塔和錨碇本文介紹了該下部結構施工的一些關鍵技術節,包括主纜錨碇錨固的安裝,大體積混凝土的溫控防裂,主塔基礎和承臺的海上施工,塔柱滑模施工控制等
  7. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的混凝土中及海堤、工業頂棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性境的混凝土結構等海洋工程、梁工程、路面工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土梁力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土梁正截面受彎性能試驗數據的分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土梁正截面受彎性能進行了深入的研究,較的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土梁正截面受彎性能的理論計算體
  8. This paper makes researches on pdm ' s kernel function - pcm ( product configuration management ) under the conditions of autocad and low - price dbms witch could be acceptable in our middle or small factories. this paper mainly discusses the recursive query algorithm based on general database witch is offered in oracle, the problem of the automatic bom maker for autocad and conversion from bom to product structure trees. thus the data of autocad files could go into erp ( enterprise resource plan )

    本文從pdm理念出發,在我國中小企業普遍能接受的autocad和低價位數據庫管理的平臺條件下,對pdm的核心技術模塊pcm (產品結構管理)的實現進行了研究,重點解決了在一般數據庫中實現數據庫oracle中具備的遞歸查詢演算法, autocad境下bom表的自動生成技術,以及bom表向產品結構樹的轉化問題,從而使cad數據通過bom表的梁作用進入erp (企業資源計劃)
  9. It ' s the first time clearly and systematically to present the concepts of restraint influence coefficient of steel to strain increment, to curvature increment and to deflection increment due to creep which are different each other. theoretical formulae are established, and approximate formulae are also obtained while considering the characteristics of common - used concrete and ambient condition of real bridges in china. so, an approximate restraint influence coefficient method to analyze the effect due to creep and shrinkage in pc bridges is put forward, and the equations to estimate second - force due to creep considering influence of steel in system - transferred continuous pc bridges is also established

    本文首次清晰而地提出了鋼筋對徐變的不同效應(徐變應變、徐變曲率、徐變上拱)約束影響數的概念,建立了相應的計算式;結合我國普遍採用的混凝土的徐變特性和梁的構造特點及工作中南大學博士學位論文摘要境特徵,給出了具有較高計算精度的實用計算式;在此基礎上,建立了梁徐變效應近似分析的鋼筋約束影響數法,並推導出了考慮鋼筋影響的超靜定梁徐變次內力的近似計算式,可方便地應用於梁研究和設計中。
  10. In fact, hartmann - shack wavefront sensor is affected by the noise of ccd and the constructed error too. in our compare, a bridge is setup, which is the original wavefront composed by zernike polynomial, we transform the original wavefront into far field. then we can compare the accuracy of hartmann - shack wavefront sensor with the accuracy of the system of far field diagnosis in detecting the farfield, using diffraction limit and encircle energy

    我們在進行兩者相互比較的過程中,搭建了一個比較的梁,即由zernike多項式組成的各種原始像差波前,將它也變換到遠場作為原始理想遠場光斑,然後,以它的衍射極限和圍能量曲線作為評價標準,比較hartmann - shack波前傳感器和遠場測量在光束質量診斷中的探測精度。
  11. The effect of viaduct system on near environment is generated through the column of viaduct, so the characteristics of loads are that the action points do not change but the values change with time

    高架對周圍境的影響是通過高架的柱子而產生的,其特徵是荷載位置不變,但大小隨時間變化。
  12. It is important part of the whole system, creating a model for limited - units counting

    它是重要的一,建立了裝卸的有限元計算模型。
  13. Firstly, the basic theory of full - bridge phase - shift zvs pwm converters are expatiated and another three kinds of circuits of full - bridge phase - shift zvs pwm converters are discussed. there are four kinds of problems which are emphasized : how to expand the zvs range ; how to reduce the circulation in the primary side of the transformer in order to minimize the on state losses ; how to decrease the loss of effective duty circle and how to eliminate the parasitic oscillation of the output rectifiers

    本文首先分析了基本的全移相zvsdc dc變換器的工作原理,為解決滯后臂不易實現零電壓開關( zvs )的情況,討論了另外三種全移相zvsdc dc變換器的電路拓撲,重點分析並解決了四個方面的問題:如何擴大zvs的負載范圍;減小變壓器原邊流,降低變換器通態損耗;減少變壓器次邊有效占空比丟失;消除輸出整流二極體的寄生振蕩。
  14. The twelve kinds of modes and equivalent circuits of this inverter with high frequency link within one high frequency switching period are carefully analyzed ; by using the state - space averaging approach, the inverter ’ s averaging model is presented, and the design criterion of key circuit parameters and the output characteristic curve are given ; the analyses of the system stabilization and the mathematic analyzes of the principle of high - frequency - link of this inverter have also be done. prototypes for 1kva 270v 10 % dc / 115v400hzac uni - polarity phase shifting controlled bi - directional voltage mode inverter with high frequency link is designed

    以全式拓撲為例,論述了雙向電壓源型高頻節逆變器單極性移相控制的原理、逆變器在一個高頻開關周期內的十二個工作模式及其等效電路;採用狀態空間平均法建立了逆變器平均模型,獲得了這類逆變器的關鍵電路參數的設計準則和外特性曲線;分析了穩定性,並對逆變器高頻節原理進行了數學分析。
  15. Then, according to the conclusion , the remote ethernet bridge system can be improved better for the industry control demand. finally by making use of motorola company ' s mpc860, which is an integrated communication controller, the remote ethernet bridge system is realized. by adopting mpc860, the ga -

    最後利用motorola公司的mpc860通信處理晶元實現以太網遠程,採用該晶元提高了的集成度,增強了境的適應能力,降低了成本,縮短了產品的開發周期,同時有利於產品的升級換代。
  16. The whole high way bridge systems in china have certain damages for poor natural conditions, long history, overload

    中國許多大城市的公路由於建造時間長久、境侵蝕、不利荷載等原因已經產生了一定程度的損壞。
  17. The key method has been introduced for designing linux device driver of pci - vme bridge device based on realized by us data acquisition and control system

    以一個已實現並投入使用的實際例子介紹了在linux境下設計實現數據採集pci - vme接設備驅動程序的關鍵技術。
  18. As a component of science and technology, it is called “ blood circulation systems ” of science - technology and society, which are the lifelines of economy and society. in the middle of the 20th century, the information and biology revolution marked the revolution of the modern science and technology

    以傳播科技信息為主要內容的科技傳播已成為科技工作不可缺少的組成部分,並成為連接科技與社會的梁,作為一種「血液循」 ,是經濟社會發展的命脈所
  19. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐連接的間隙變形、彈性變形、不均勻沉降以及境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  20. In the design of real - time control system, the paper takes three - phase full - bridge mosfet inverter as the real - time control main circuit, and adopts a control scheme with 120 ? switching mode combined with half - bridge pulse width modulation ( pwm ), which would avoid straightthrough short of a certain bridge. phase current is detected by single current sensor ; three - phase position signals generated by position sensors could not only supply commutation information for inverter, but also be used for speed detecting based on signals " period measurement, which makes the speed sensor unnecessary. the whole control system adopts speed and current dual closed - loop control strategy in order to construct a high performance rare - earth permanent magnetic brushless dc motor ( repm bldcm ) full - digital real - time control system

    在實時控制的設計中,本文以三相全mosfet逆變電路作為實時控制主電路,採用120導通方式結合半pwm調制的控制方案,從而有效地避免了臂的直通短路;本文用單電流傳感器實現對相電流的檢測,來自位置傳感器的三相位置信號不僅為逆變電路提供換相信息,而且也用於基於信號周期測量的轉速檢測,這樣就省去了速度傳感器;採用的是速度、電流雙閉控制策略,力求構建高性能的稀土永磁無刷直流電動機全數字實時控制
分享友人