橋隧工程 的英文怎麼說

中文拼音 [qiáosuìgōngchéng]
橋隧工程 英文
bridge-cum-tunnel
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、梁、防浪堤、水庫堤壩、道、機場跑道、市政井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  2. At about 11. 30 am today ( october 4 ), a private car driven by a 35 - year - old man was travelling along the sound bound carriageway of canal road flyover. it crashed to a roadwork and the embankment when it reached the entrance of the aberdeen tunnel. after the impact, the 35 - year - old driver and five passengers, comprising a five - year - old girl, two men and two women aged between 18 and 49, were injured

    今日(十月四日)上午約十一時三十分,一名三十五歲男子駕駛私家車沿堅拿道天南行,駛至香港仔道入口時,突然沖向一個道路及石? ,結果導致三十五歲男司機及五名乘客受傷,包括一名五歲女童及年齡十八至四十九歲的兩男兩女,六名傷者全被送往律敦治醫院治理。
  3. Introduction to bridge - tunnel combination solution for quanzhou bay cross sea passage project

    泉州灣跨海通道組合方案介紹
  4. The shanghai yangtze river bridge - tunnel, currently under construction, will provide strong impetus to the development of dongtan

    正在建設中的上海長江橋隧工程,成為東灘開發強勁的推動力。
  5. Mr lo said : the route 8 project under construction is to provide a 15km long dual three carriageway between tsing yi and sha tin. it comprises the nam wan, eagle nest and sha tin height tunnels, the stonecutters bridge and a number of viaducts and interchanges

    盧耀楨說:興建中的八號干線,是一條連接青衣及沙田的雙三線行車道路,全長十五公里,當中包括南灣道尖山道及沙田嶺道昂船洲大高架道和交匯處。
  6. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、梁、洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  7. Hong kong gifts premium and houseware fair experienced renewed international interest which demonstrated the vitality of an international city always geared to strengthen its leading role as the " events capital of asia, " said mr cliff wallace, managing director of hkcec. hml is a subsidiary of nws holdings limited " nws holdings ", stock code : 0659, the flagship servicing company of new world development company limited stock code : 017. nws holdings embraces a diversified range of businesses in hong kong, macau and in the mainland

    新創建集團有限公司(新創建集團;股票編號: 0659 )乃新世界發展有限公司(股票編號: 017 )之服務業旗艦公司,業務遍及香港、澳門及中國內地,公司業務主要由三大部門構成,計有:服務業,包括設施管理(香港會議展覽中心之營運管理、富城物業管理和大眾安全警衛) 、建築機電(協興建築和新創機電) 、交通運輸(新巴和新渡輪) 、金融保險及環境;傳統基建的投資項目則涵蓋電力、收費道路、食水及污水處理、梁和道、 ;以及港口,包括貨櫃及貨物裝卸、倉庫儲存和提供物流運輸網路。
  8. Wwf hong kong is greatly disappointed by the decision of the environmental protection department to approve the kcrc s sheung shui to lok ma chau spur line environmental impact assessment report. we found the adverse impacts incurred by the spur line project to be environmentally unacceptable, and the eia report failing to meet the requirements of the technical memorandum for the eia process under the eia ordinance because of the following reasons

    世界自然香港基金會簡稱世界自然基金會對環保署批準九廣鐵路的上水至落馬洲支線道高架方案環境影響評估報告下稱環評報告深表失望,認為支線會造成不可接受的環境影響,而且環評報告亦未能符合環境影響評估序的技術備忘錄的要求,因為:
  9. The works that hyder has undertaken cover areas of railways, highways, tunnels, bridges, buildings, geotechnics, environmental science, water supply & sewage treatment, airport and harbors, etc

    咨詢經驗已有150年,從事項目包括鐵路、公路、道、梁、屋宇、巖土、環境科學、供水及污水處理,機場和海港設施等。
  10. Brief introduction of engineering case for treatment of bridge and culvert soft foundation with gravel pile and of tunnel soft foundation with high - pressure jet grouting pile

    簡單介紹了採用碎石樁進行涵軟基處理,採用高壓旋噴樁進行道軟基處理的實例。
  11. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠道的安全管理難度。
  12. Zhejiang 8 amounting to tunnel engineering limited company is alley of well of bridge of road surface of channel of pilot a ship into a harbour of water and electricity of volume road tunnel, railroad channel, irrigation works, roadbed, mine, large cubic metro of earth and stone blow up the professional construction company that construction is an organic whole, have channel highway project to always contract two class aptitude

    浙江八達有限公司是集公路道、鐵路道、水利水電引水道、路基路面梁、礦山井巷、大型土石方爆破施為一體的專業施企業,擁有道公路總承包貳級資質。
  13. The spur line project comprises four major sections, namely, the tunnels, the viaducts, lok ma chau station, and the modification works at the existing sheung shui station

    建造主要包括四大項目:道段、高架段、落馬洲站以及為現時上水站進行的改善
  14. Renovation of sheung wan elevated walkway, subway across cotton tree drive near murray building, footbridge across cotton tree drive near fairmont building in central, and two footbridges across harbour road east of fleming road in wan chai

    上環高架行人路,中環橫跨紅棉路近美利大廈之行人道和近東昌大廈之行人天,以及灣仔兩條橫跨港灣道而在菲林明道東面之行人天翻新
  15. Apart from the above projects, whether the government or the mtr corporation limited has any plan to connect other existing footbridge systems in yau tsim mong district to mtr station exits or subway systems in the district

    除了上述外,政府或地鐵有限公司有否計劃將現有油尖旺區的其他天系統連接到區內的地鐵站出口或道系統?
  16. The riveting and welding plant of the company has a very strong technical force and a lot of the technical personne, we have kinds of equipments in the milling, shaving, grinding and so on, all kinds of machine parts are made in our company including the biggest parts and the smallest screw - thread steel and lead - screw drive, for example, structural projec, rivet welding parts, bridge building, plant building, tunnel ect, we can also undertaking,

    我公司下屬機械加鉚焊分廠,實力雄厚科技人員眾多。在銑刨磨各種設備都有。大至作母機,小至絲桿絲帽,能生產各種難度較高的機床設備,又如結構鉚焊機件梁建築廠房道等等,也能精承攬。
  17. 5 by using multi - window programming technology to combine vc + + with autocad, this thesis implemented comparison of plane, profile and across section, interactive design of profile, railway location by across section and setting location of bridge and tunnel. 6 this thesis expounded itself viewpoint on application model of profile optimization in scrlid, and has been used in system development. 7 by putting forward the summaries on the application model of professional design, this thesis established mathematics model of calculating terrain height of profile and across section, automatic setting location of the bridge and the tunnel

    2 、用面向對象的數據封裝和繼承技術實現了項目管理和方案數據的安全保護; 3 、選擇應用vc + + dao數據庫應用技術,完成了方案比選共用數據庫的開發; 4 、用autocadobjectarx定製實體技術,實現了線路平面拖放式交互設計; 5 、用vc + +與autocad相結合的多窗口編技術,實現了平面、縱斷面、橫斷面三種圖形的對比顯示,實現了縱斷面交互設計、橫斷面定線和橋隧工程設置; 6 、就縱斷面優化在線路方案比選作中的應用模式提出了自己的觀點,並在系統開發中得到應用; 7 、總結專業設計應用模式,建立了內插縱橫斷面地面高、自動設、自動設數學模型。
  18. In the fourth chapter, based on the analysis and design of some modules closely relating to interactive design, the thesis completes the development of the railway location interactive design subsystem, and these modules are : railway horizontal line interactive design, comparison of plane, profile and across section, automatic and interactive design of profile, designing railway location by across section and setting location of the bridge and the tunnel

    第三章分析了線路方案比選作過中所涉及的數據情況以及數據管理方法,完成了方案比選綜合數據管理子系統的開發作,第四章通過對線路平面交互設計、內插縱橫斷面地面高、縱斷面自動與交互設計、橫斷面定線、橋隧工程設置等與交互設計密切相關的重點模塊的分析與設計,完成了互動式線路設計子系統的開發。
  19. Sichuan jiaoda civil engineering consultancy co., ltd is mainly engaged in examination of construction design documentation for road, bridge and tunnel projects, preparation of project feasibility study report, engineering consultancy and stress calculation and analysis for various large structures

    四川交大土木咨詢有限公司,主要從事道路、梁、道等的施圖設計文件審查:可行性研究報告編制;技術咨詢及各類大型結構的受力計算與分析。
  20. This subject directly investigates 14 construction enterprises and more than 40 construction sites. the types of the projects involve railway, bridges, tunnel, municipal, road, industry and civil construction, airport runway, hydraulic tunnel and others. this paper deeply analyzes and assesses the occupational health and safety management actuality of the construction site, points out the main problems in the process of hazard identification, risk assessment and risk control, and also analyzes why these problems exist

    該課題研究直接調查了十四家施企業和四十多個項目施現場,項目類型涉及鐵路、市政公用、公路、房屋建築、機場場道、水、土石方等,對施現場實際的職業健康安全管理現狀進行深入的分析、評估,指出了危險源辨識、風險評價、風險控制過存在的主要問題,並分析了為什麼會存在這樣的問題。
分享友人