橋面安裝 的英文怎麼說

中文拼音 [qiáomiànānzhuāng]
橋面安裝 英文
flooring
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • 橋面 : road of bridge; bridge floor; deck
  1. The grout is installed after final adjustment and installation of the roadway wearing surface.

    灌漿是在最終調整和磨耗層以後進行的。
  2. Prospect dtzziii series weight - load controller sensor part adopt bridge - type strain piece sensor, and applies steady installation technology to insure sensors running steady and long - range. we provide multi - kinds of sensor installation method. sensor can be installed under the car bottom, on elevator rope hitch plate, on car top wheel and axle and car top beam to work together with controller

    前景dtzziii系列稱重控制儀的稱重傳感器部分採用式應變片傳感器,應用平穩技術確保長期穩定運行稱重傳感器提供多種方式,可以于活轎底電梯的轎廂轎底電梯繩頭板處電梯轎頂輪軸處電梯轎頂橫樑上等,與控制儀配合使用。
  3. At hung shui kiu erection of noise barriers on viaducts

    于青磚圍的隔音屏障
  4. Class 1 - residential / light commercial snow melt : recommended for residential and light commercial walkways, driveways, entrances, and other light traffic ways, ramps and building entries

    冰雪融化系統實際上可在任何地方,如停車場、車道、卸區、梁、人行道、戶外階梯、檐槽、屋天溝、屋頂、下水管道,大約地表5厘米下的混凝土中。
  5. In 2000 passed theiso9001 quality system authentication, the main camp product includes : the filter, filters the separator, the oil - water separator, thesilencer, cuts shui qi, the respiration valve, the fire resistance, the hydraulic pressure safety valve, kong leijian, the metal vlexiblehose, the ripple compensator, fluctuates under the oil installment, the pot the sampling, the crane tube, lightly falls the springboard, the steel structure trestle, the liquid level indicator, the oilinterceptor, the heater, regards product and so on boundary

    2000年通過了iso9001質量體系認證,主營產品有:過濾器、過濾分離器、油水分離器、消聲器、切水器、呼吸閥、阻火器、液壓全閥、孔類件、金屬軟管、波紋補償器、浮動出油置、罐下采樣器、鶴管、輕落跳板、鋼結構棧、液指示器、阻油器、加熱器、視境等產品。
  6. The construction of the bridge began in oct 1999, and the closing up of the steel tube was in dec 2000. during that period, i learned and analyzed the current construction methods fairly comprehensively, and collected the construction technique data of the cfst arch bridges having been built. based on this, aided by the simulation of construction procedure using finite element program, i proposed the operation program to make the steel tube segment be located at one time, and the scheme of dividing rooms to segment pouring

    於99年10月開工, 2000年12月主鋼管合龍,在此期間,本人就目前鋼管混凝土拱的施工方法進行了較全的了解和分析,搜集了此類已建梁的施工技術資料,在此基礎上,又藉助有限元程序對施工過程模擬計算的支持,提出了在梅溪河大懸臂過程中,鋼管節段一次就位的操作程序和鋼管混凝土分倉灌築的方案,並為施工單位采納應用。
  7. Traditionally there are two kinds of weight - in - motion systems : static weighting platform on pavement and bridge dynamic weighting system

    傳統上車輛的稱重系統主要分為在路上的靜態秤臺和動態稱重系統。
  8. Erection of noise barriers on viaducts at tsing tsuen wai

    于青磚圍的隔音屏障
  9. Traditional approach to raise damping is installing passive damper between cable and deck, such as viscous ( oil ) dampers

    目前增加拉索阻尼的常用辦法是在拉索和被動阻尼器,如油阻尼器。
  10. 5 by using multi - window programming technology to combine vc + + with autocad, this thesis implemented comparison of plane, profile and across section, interactive design of profile, railway location by across section and setting location of bridge and tunnel. 6 this thesis expounded itself viewpoint on application model of profile optimization in scrlid, and has been used in system development. 7 by putting forward the summaries on the application model of professional design, this thesis established mathematics model of calculating terrain height of profile and across section, automatic setting location of the bridge and the tunnel

    2 、用向對象的數據封和繼承技術實現了項目管理和方案數據的全保護; 3 、選擇應用vc + + dao數據庫應用技術,完成了方案比選共用數據庫的開發; 4 、用autocadobjectarx定製實體技術,實現了線路平拖放式交互設計; 5 、用vc + +與autocad相結合的多窗口編程技術,實現了平、縱斷、橫斷三種圖形的對比顯示,實現了縱斷交互設計、橫斷定線和隧工程設置; 6 、就縱斷優化在線路方案比選工作中的應用模式提出了自己的觀點,並在系統開發中得到應用; 7 、總結專業設計應用模式,建立了內插縱橫斷高程、自動設、自動設隧數學模型。
  11. Precast concrete segment erection with mbec lifting frame

    Mbec吊架-預制構件
  12. Precast concrete segment erection with mbec frame

    Mbec吊架-預制構件
  13. Segment erection with mbec lifting frame

    Mbec吊架-預制構件
  14. Approach viaduct - segment erection

    高架-預制構件
  15. From the lessons learned from the quality accidents of rubber bearing, problems in design and quality control, selection and installation, inspection and maintenance are discussed, and factors influencing the service lifetime of rubber bearings and countermeasures of application investigated

    本文根據近幾年發生的多起公路梁橡膠支座質量事故,從橡膠支座的產品質量、支座的設計和橡膠支座的選用、布置、檢查與維護等方進行了分析,並指出了影響橡膠支座使用壽命的諸多因素及應用對策。
  16. Installation of traveling form for deck construction at grid 4

    為建造於四號臺活動式套架
  17. Sign gantry posts erected on viaduct general view of the completed viaduct deck

    上的道路指示牌的柱
  18. Tray - type cable support systems are ideal cable laying devices most broadly applied in petrolum industry, chemical industry, power and light industries. television and telecommunication, it is featured by such advantages as small weight, great loading capacity. good - looking shape, simple structure. convenient erection. quick heat dissipation and fine permeability

    托盤式架是石油、化工、電力、電視電訊等方最廣泛應用的敷設置,它具有重量輕,載荷大、造型美觀、結構簡單、方便、散熱透氣性好等優點,既適用於動力電纜的,也適用於控制電纜的敷設。
分享友人