橋面面積 的英文怎麼說

中文拼音 [qiáomiànmiàn]
橋面面積 英文
deck area
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • 橋面 : road of bridge; bridge floor; deck
  • 面積 : [數學] area
  1. On the basis of expound the theory of building exterior - protected construction energy consumption and the gene of influence the building energy, set up mathematics model, this article discuss the mechanism of dispelling the heat of the buildings " thermal bridge and the complication that influence it, and then synthetic analysis and calculate the influence range of building thermal bridge in exterior - protected construction column thermal bridge to the building outer wall get the conclusion that when the construction column can satisfy the building stress - area, in bulgy construction column dispel less heating than out bulgy construction column. but if the pole stuck out more than 100mm, in bulgy or out bulgy make no difference

    本文在闡述建築圍護結構耗熱原理以及影響建築能耗因子的基礎上,採用數值模擬方法,探討了建築熱傳熱的基本機理和影響建築熱傳熱的因素,進而對建築熱在圍護結構傳熱中的影響范圍進行了綜合分析和計算,研究了構造柱熱型式對建築外墻能耗的影響,得出了構造柱在滿足建築受力要求的情況下,內凸構造柱較外凸構造柱略能減少散熱量的結論,但是凸出過大( 100mm )無論內凸還是外凸對建築耗熱都沒有大的差別。
  2. Among various fabrication techniques of thin film, the sol - gel process has gained much interest for the preparation of pzt thin film, due to ihe advantages of good homogeneity, easy control of composition, low in - ill i reaving temperature, easy formation of large area thin films pb ( zrxti : - k ) 0 :, ( pzt ) films were prepared on the ito coated glass plates and low resistor silicon wafer in sol - gel dip - coating process associated wi di heat treatment : at different temperatures and characterized by x - ray diffraction ( xrd ) and transmission electron microscopy ( tem ). lt is shown that the pzt ferroelectric thin films with ( 110 ) preferred orientation and well - crystallized perovskite structure can be obtained after annealing at 680 ? for 30 minutes on ito substrate and at 800 " c for lornin on silicon substrate

    Pzt的制備方法有很多,其中溶膠?凝膠( sol - gel )方法可以和集成電路( ic )光刻工藝相互兼容,處理溫度低,有大塗敷性能,能精確地控制組分,無需復雜的真空設備,成本低廉,所以對于集成鐵電薄膜電容的應用這種方法有很廣闊的前景。本文利用sol - gel技術在摻錫的in _ 2o _ 3透明導電薄膜( ito )襯底和低阻硅襯底上成功地制備了pzt鐵電薄膜。運用了x射線衍射, sawyer - tower電路和lcr電分別對薄膜的晶化溫度,結構和電學性能進行了測試。
  3. Kinglead hotel chongqing is the famous four - star business hotel set up by the kinglead industry group. hotel covers the area about 7200 square meter and with the architecture area of 3. 2 square meter up to 15 floors. it is located in the crossing of yuzhong, shapingba, jiulongpo, banan and daudukou district in the shiqiaopu high and new technology development distrist of chongqing. and east to the olympic center, west to yugao park, north to tv station of chongqing and nearby the fiest food and beverage street of chongqing service in 24 hours

    酒店總佔地7200平方米,建築3 . 2萬平方米,樓高15層,位於重慶市石鋪高新技術開發區,地處渝中區沙坪壩區九坡區巴南區大渡口區交匯點,東鄰奧林匹克中心,西鄰渝高公園北鄰重慶電視臺與重慶「餐飲第一街」毗鄰,確保你每天24小時的任何時段內都能吃到重慶地道美食,讓您商務旅遊生活盡享愜意!
  4. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水,河道平均坡降和流域形狀系數,在參數等值線圖上查得涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小涵跨徑,節省投資。
  5. This factory is located the delta the seashore city sea salt, the shanghai and hangzhou highway 320 federal highways and is constructing the qiantang river cross sea bridge close neighbor, the transportation is extremely convenient, area 3 chinese acres

    本廠位於三角洲的海濱市海鹽,滬杭高速公路320國道和正在建設中的錢塘江跨海大緊鄰而過,交通十分方便,佔地3畝。
  6. However, it lacks runoff data in absolutely most areas where culvert and small bridge locate. some traditional design method, such as the methods of statistic zone parameter, modification by catchment area, rainfall - runoff, reasoning formula and empiric equation et al, are used to estimate flood flow through culvert or bridge

    然而,絕大多數中小涵所在地卻沒有可利用的徑流資料,通常採用統計分區法,改正法、暴雨徑流法、推理公式和經驗公式等傳統設計方法,這些方法一般比較繁瑣、精度較低、設計的流量偏大,導致工程造價偏高而浪費資金。
  7. The newly completed hall of national agricultural exhibition center has a length of 152. 5m, width of 86m, exhibition hall area of 13, 000m2 and highest point of 15. 6m

    剛剛新建的北京全國農業展覽館?新館採用大跨度獨立柱基張弦式管架結構,長152 . 5米,寬86米,展廳13000平方米,最高處達15 . 6米。
  8. According to the result of physical modeling, the regression equation about the decrement of tidal bore height, the percentage of water - resisting area and the distance away from the upstream bridge site is constructed in this paper, the regression equation can be applied in the impact which bridge has on the tidal bore height in qiangtang esturary

    根據模型試驗結果,建立了涌潮高度的減小值與中潮位墩阻水百分比和上游離址距離的多元回歸方程,可供錢塘江河口建對涌潮高度的影響計算參考使用。
  9. It is local impact that bridge being built has on the shape of tidal bore, and this local impact can be recovered in the place which is 300 - 500 long upstream bridge. the impact that bridge being built has on the intensity of tidal bore depends on the water - resisting area of bridge. generally the more water - resisting area is and the nearer the place is away from the bridge site, the more impact is on the intensity of tidal bore

    對涌潮形態的影響是局部的,在上游300m 500m的范圍內基本可以得到恢復;建對涌潮強度的影響主要取決于墩阻水,一般來講,阻水越大,位置離址越近,對涌潮強度的影響亦越大。
  10. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游丙乳砂漿防滲層大施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大大體粉煤灰混凝土技術、南京長江二泵送混凝土技術等提供咨詢建議。
  11. Shanghai jinqiao export processing zone is the first state - level development zone named “ export processing zone ” that was approved by the center of pudong new area with a planned area of 20 square km, bordering lujiazui finance and trade zone in the west, waigaoqia free trade zone in the north and zhangjiang hi - tech park in the south

    上海金出口加工區是1990年經國務院批準設立的第一個以「出口加工區」命名的國家級開發區,位於上海市浦東新區踣,西連陸家嘴金融貿易區,北接外高保稅區,南近張江高科技園區,規劃20平方公里。
  12. The maincharacter of pollen assemblages in the site was the peaks of typha in the final stage of the liangzhu culture and dominant proportion of typha in the maqiao culture, denoting large water areas around the site

    該遺址孢粉記錄表明,良渚文化晚期和馬期出現大量的香蒲,遺址周圍池塘沼澤較大。 2 、太湖流域新石器時期文化遺址的興衰與地勢、氣候、海平的變化以及太湖碟形湖盆體系的發育密切相關。
  13. The planing of res - ldenral cheng qiao tower is at north - west of new ctiy in chongming. total building area is about 335000 square meters, which includes lot a and lot b. the project is a residential housing development with 28000 squar meters commercial area for public use, which includes a primary school, big kindergarten, club house and big shopping center

    項目簡介:崇明城鎮公寓住宅規劃屬上海市商品住宅建設項目,基地位於上海市崇明新城的西北部,規劃總用地: 30 . 7公頃,總建築: 33 . 5萬平方米,區內劃分為a , b兩塊,配套公建有佔地2 . 8公頃的小學,大型幼兒園,會所,集中大型商業。
  14. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗設計使用壽命100年的要求,確定出高耐久性混凝土的設計控制指標,基於最緊密堆原理和最佳漿骨比原理對梁的墩柱、蓋梁、預制箱梁和板用高耐久性混凝土的配合比進行設計,並對其施工應用技術進行了研究。
  15. Shuan - xin residential building invested by rebar group is located at the head of the chung ho xiu - lang bridge. the building is 34 stories high upper ground and 5 stories underground with a total construction area of 70, 233. 71 m2

    力霸集團投資興建之雙星住宅大廈,位於中和秀朗頭,望山水,視野壯闊,該大廈地下五層,地上三十四層,總建築70 , 233
  16. Shuan - xin residential building invested by rebar group is located at the head of the chung ho xiu - lang bridge. the building is 34 stories high upper ground and 5 stories underground with a total construction area of 70, 233. 71 m2. it has a total of 5 buildings with 642 households

    力霸集團投資興建之雙星住宅大廈,位於中和秀朗頭,望山水,視野壯闊,該大廈地下五層,地上三十四層,總建築70 , 233 . 71 ,共5棟642戶。
  17. Jianhu lake scenic area is the main part of jianhu lake, covering an area of 1. 47 km2, and the water surface accounts for 48. 7 %

    坐落在柯山腳下的鑒湖景區為歷史名湖鑒湖的一個主要部分,1 . 47平方公里,其中水域佔48 . 7 % ,建有東漢笛亭、南洋秋泛、五步月、葫蘆醉島等著名景點。
  18. In the paper, berth length, container yard area, quay cfs, the number of quayside container cranes and container throughput were selected as the indexes of ports efficiency evaluation

    摘要選取泊位長度、碼頭、碼頭cfs 、吊數量以及集裝箱吞吐量5個集裝箱港口績效指標,選擇中國實力相當的6個集裝箱港口進行灰理論的靶心度分析,並以此進行評價排序。
  19. The planned commercial center has guan yin qiao rotary standing its south, shijixindu, industrial and commercial bank and china bank standing its north, jialing park, yu bei store standing its west and beichengtianjie and jiangbei chinese medicine hospital standing its east, with an area of 42. 42 hectare

    商圈范圍觀音商圈規劃范圍南起觀音轉盤,以建新東西路為界;北至世紀新都、工商銀行、中國銀行;西以嘉陵公園、渝北商場及現狀道路為界;東至龍湖北城天街、觀音農貿市場、江北區中醫院支路,規劃區42 . 42公頃。
  20. Wenzhou ouhai gaoxiang moulds co., ltd is located at gaoxiang industrial zone, xinqiao town, wenzhou with the factory area of over 4000 square meters

    溫州市甌海高翔模具有限公司座落在溫州市新鎮高翔工業區,廠房4000餘平方米。
分享友人