橫行無阻 的英文怎麼說
中文拼音 [hénghángwúzǔ]
橫行無阻
英文
nothing s gonna stop us now- 橫 : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
- 行 : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
- 無 : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
- 阻 : 動詞(阻擋; 阻礙) block; hinder; impede; obstruct
- 橫行 : (行動蠻橫; 倚仗暴力做壞事) run wild; run amuck; be on a rampage
- 無阻 : undamped; unobstructed; unimpeded
-
Unique frictionless lateral flexion. these functions enable you to have passive tests for the patient ' s cervical spine
獨特無阻力橫向屈曲,以為病人進行頸椎被動測試。During the simulation of the secondary lateral suspensions for the high speed passenger vehicle with no - bolster bogie, the effective using semi - active control to improve the ride comfort are studied
通過對採用無搖枕轉向架的高速客車懸掛系統橫向模型的模擬實驗,研究了半主動阻尼控制改善車輛運行平穩性的有效性。The ten - thousand - flower labyrinth, one of the scenes in the garden of perfect splendour, has been reconstructed. it is a maze of winding paths between low walls in the eastern part of the garden
位於園的東北部,由無數迥環曲折的矮墻組成,人行其間,縱橫阻隔,難于找到出口,所以也叫迷宮。Above all, with the data acquired by tests, this thesis has analysized the lateral resistanc, longitudinal resistance and rail creep etc between ballast and sleeper before and after mass machine work, discussed the effect of mass machine on stability of continuously welded rail track, reseached the change regularity of fastening - down temperature of rail, which is resulted by mass machine work, and have settled the suitable range of work temperature which guarantees the stability of jointless railway. what ' s more, this thesis has put forward the appropriate work pattern, work temperature and work area for mass machine work in future. at the same time, this thesis has given rational suggestions about some conditions worth of attention in production of mass machine, which can in return raise the work productiveness of mass machine. at last, this thesis has considered formulating reasonable measures for operation organization and work standard, so that mass machine work can play an important role in maintenance, which can reduce work load, raise work efficiency and maintenance cost in daily maintenance
本文通過實測的各種數據,分別對大機作業前後道床對軌枕的橫向阻力、縱向阻力、鋼軌爬行情況等進行深入分析,進一步探討大機作業對無縫線路穩定性的影響,研究大機作業引起的鎖定軌溫的變化規律,確定保證無縫線路穩定的合適作業軌溫范圍。為我國今後的大型養路機械作業提出合理的作業方式、合適的作業軌溫和作業地段,同時對大型養路機械作業中應注意的問題提出合理化建議,為大型養路機械作業提供更高的安全保障,進一步提高大機作業效率。最後,對工務段在大機作業中的配合制定完善的施工組織措施及作業標準,使大機作業在養護維修中發揮更大的作用,為工務段日常的養護維修減少工作量,提高勞動效率,降低維修成本。So, our team had not the chance to move horizontal on the mast when the ship was moving. about the 1, 200 meters running, the way was not clear and there is no enough instructors or staffs to direct the 36 trainees, it resulted in most trainees lost the way and failed to finish the 1, 200 meters that included me. according to the environment, city challenge instead of field challenge, camp on beach replaced sole stay in mountain, the tend of wind delayed the sailing schedule and it cancelled the raft race, it took away our opportunity of learning how to make raft by bamboo and large plastic tub
首先是船頭跳水,在港,正好鯊魚旺季,暫停營業,到了日本,又逢港口管制,被逼休假;而離港啟航的首個節目,本應是在行進的船上,爬上桅桿,再橫行桿上,學習解帆,雖然桿是上盡了,但雨卻落下來,船要轉帆,於是橫行桿上學習解帆這等壯觀場面,我們全組都無緣參與;再來是千二米長跑,指示不清,路線不明,以致多人迷路,被逼半途而廢;接下來的野外定向,因就地利,變身為城市挑戰;山中獨處換了沙灘露宿;風向延誤了航程,阻止了木伐競渡。分享友人