次橋基 的英文怎麼說

中文拼音 [qiáo]
次橋基 英文
secondary abutment, auxiliary abutment
  • : Ⅰ名詞1 (次序; 等第) order; sequence 2 [書面語] (出外遠行時停留的處所) stopping place on a jou...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. Based on using elementary ideas of the latest theories with the combination of extensive achievements of bridge condition assessment and the other correlative domains, the assessment model was established using analytic hierarch process and variable weight synthesizing, which evaluated pc cable - stayed bridge ' s condition in service by grading items in bottom level of assessment model

    在吸收和採用已有成果的本思想的礎上,結合國內外梁評估領域和其他相關領域的研究成果,建立了以層分析法結合變權綜合原理為礎,通過打分方式對pc斜拉的狀態進行評估的架構與模式。
  2. Initiated by professor zhou jin - huang, the first national conference of cardiovascular pharmacology was held in 1980 in changsha, at which the committee of cardiovascular pharmacology affiliated to china society of pharmacology was founded. the main task of the committee is to be responsible for domestic and international academic interchange in cardiovascular pharmacology by playing a role of a bridge in enhancing the connection of cardiovascular pharmacology with related basic sciences, including phytochemistry, organic chemistry, pharmaceutical science and technology, and clinical medicine

    1979年正式成立中國藥理學會, 1980年在周金黃教授的倡導下在長沙舉行了第一全國心血管藥理學術會議,成立了中國藥理學會心血管藥理專業委員會,它的任務是負責國內外心血管藥理學術交流,加強與心血管藥理學有關的礎學科如植物化學、有機化學、制藥學以及臨床醫學的聯系,發揮梁作用。
  3. Located in shanghai pudong etdz, fangyuan group shang hai construction machinery co., ltd. integrates products development, production, sales and marketing service and takes geographical advantage to become a base for group absorbing high - competence talents, transforming hi - tech fruit, exploiting upgrade products as the connector and bridge covering north china market, involving international competition

    方圓集團上海建設機械有限公司位於上海浦東經濟技術開發區,公司集產品開發、生產、銷售、市場服務為一體,發揮區位優勢,成為集團吸納高素質人才、轉化高科技成果、開發高檔產品的地,輻射華東市場、參與國際競爭的紐帶和梁。
  4. Third, this thesis analyzes the angle - control theory based on half bridge converter, and proposes a new way to find the optimized angle. simulation is performed to verify the results. then, this thesis introduces the hardware and software design of the digital control system of doubly salient electro - magnetic motor, which mainly discusses the speed and current loops and angle optimization control

    ,本文介紹了角度控制與電機轉向的關系,並對於半變換器的電勵磁雙凸極電動機換相角與相電流及輸出轉矩的關系進行了理論分析和模擬驗證,提出了優化電勵磁雙凸極電機換相角的方法。
  5. The construction of the bridge began in oct 1999, and the closing up of the steel tube was in dec 2000. during that period, i learned and analyzed the current construction methods fairly comprehensively, and collected the construction technique data of the cfst arch bridges having been built. based on this, aided by the simulation of construction procedure using finite element program, i proposed the operation program to make the steel tube segment be located at one time, and the scheme of dividing rooms to segment pouring

    於99年10月開工, 2000年12月主鋼管合龍,在此期間,本人就目前鋼管混凝土拱的施工方法進行了較全面的了解和分析,搜集了此類已建梁的施工技術資料,在此礎上,又藉助有限元程序對施工過程模擬計算的支持,提出了在梅溪河大懸臂安裝過程中,鋼管節段一就位的操作程序和鋼管混凝土分倉灌築的方案,並為施工單位采納應用。
  6. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大工程中擯棄了過去一直沿用的氣壓沉箱,首採用了鋼板樁圍堰管柱礎以來, 1985年建成的九江長江大礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁礎,鋼圍堰在礎施工中的應用越來越多。
  7. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    ,根據懸索恆載設計理想狀態建立了懸索施工計算原理;以分段懸鏈線索理論為礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  8. Be opposite this of 1992 cloth " labor law " revise share 44, new after revising " labor law " have the following characteristic : suited to build the real case that realizes formal diversity with the adjustment that develops structure of system of socialist market economy, economy, state ownership already, highlight again was aimed at increasingly complex and changeful working relationship ; the maintenance that highlighted labour union function, made clear workers congress system and collective contract system shift of power of these two main thought, aggrandizement labour union organizes construction, organize broad worker in labour union to provided legal basis and safeguard for utmost ground ; increased the protective strength to labour union cadre, aggrandizement specific safeguard, make labour union cadre ok more the function that fulfils his duty to fulfill labour union responsibly ; protected labour union to produce bridge and bond effect better, fulfilled labour union to share politics, economy, culture and the approach that the society lives, made clear the essential mechanism that labor of labour union mediate concerns ; those who made clear union funds capture range, aggrandizement of union funds capture strength, ensured labour union to organize the necessary material base that develops function of labour union of activity, implementation lawfully ; set legal liability, made clear the punishment to violating principal part, enhanced law to deter force

    對1992布的《工會法》的修改共有四十四條,新修改後的《工會法》有以下特點:既適應了建立和發展社會主義市場經濟體制、經濟結構的調整、公有制實現形式多元化的實際情況,又突出針對了日益復雜多變的勞動關系;突出了工會的維護職能,明確了職工代表大會制度和集體合同制度這兩個主要維權手段,強化了工會組織建設,為最大限度地把廣大職工組織到工會中來提供了法律依據和保障;加大了對工會幹部的保護力度,強化了具體保護措施,使工會幹部可以更加盡職盡責地履行工會的職能;更好地保護了工會發揮梁和紐帶作用,落實了工會參與政治、經濟、文化和社會生活的途徑,明確了工會調處勞動關系的根本機制;明確了工會經費的收繳范圍,強化了工會經費的收繳力度,保障了工會組織依法開展活動、實現工會職能的必要物質礎;規定了法律責任,明確了對違法主體的處罰,增強了法律威懾力。
  9. The paper takes an example of condensed gas feild in qianmiqiao buried - hills. based on the research of formation and development of the buried - hills, three important subjects in the research are discussed with the application of advanced technical and methods ( namely, balanced cross sections, analysis of carbon isotope, mensuration of reservoir fluid inclusion ) : ( 1 ) the development of karstification and characters of reservoir in ordovician ; ( 2 ) lower tertiary ( es3 ) source in the depression nearby ; ( 3 ) the hydrocarbon generation history, migration phase and reservoir formation history

    論文以千米潛山凝析氣藏為例,在研究潛山形成演化礎上,採用先進技術手段(平衡剖面技術、碳同位素分析、儲層流體包裹體測定) ,討論了該潛山油氣藏研究中三個重要問題: ( 1 )古巖溶發育與奧陶系儲層特徵; ( 2 )臨近凹陷下第三系油氣源: ( 3 )油氣生成史與運移期以及成藏歷史。
  10. Concrete elastic modulus and concrete creep and shrinkage variety at different time are reckoned in by using time increment analysis method and concrete creep and shrinkage secondary force is calculated by using effective elastic modulus. bridge stability analysis program is developed on the base of structure matrix displacement method, the program adopts visual basic language, has friendly interface and visual data input windows. the buckling safety factor of currently finished structure is given as result

    為計入混凝土彈性模量的變化及混凝土徐變收縮隨混凝土的齡期與外荷載加載時間不同而變化的影響,採用時間增量法對每個計算階段根據其階段內時步數進行循環,以計算時段內彈性應力、應變增量和徐變、收縮產生的應力應變增量,利用有效彈性模量法計算混凝土徐變收縮內力,在此礎上,結合結構矩陣位移法的本理論編制開發了計入混凝土時效效應的高墩大跨徑梁穩定分析程序。
  11. Grillage girder is always used for analysis the structures, such as dense ribbed slab, superstructure of bridge and grid - mat foundation. in this paper, a mechanical model for grillage girder by elastic supporting is proposed, and used for analysis the track structure for the first

    交叉梁系一般用於求解密肋式屋面板、樑上部結構和格式礎等結構,本文提出一種彈性支承交叉梁系模型,並首用其求解軌道結構。
  12. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大南汊懸索,主跨1490m ,居中國第一,世界第三。該的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北錨碇坑為長60m 、寬50m 、深48m的矩形超深坑,其礎圍護在國內首採用矩形地下連續墻結構,並獲得成功。
  13. In the paper a concept of ship domain was introduced and the inland water ship 3d domain model was presented. as a case study the model under environmental stress in the bridge water area was studied. it is expected to be a new approach and theory for the setting of obstruction easing facilities such as navigational aids in the bridge water area

    在此過程中,論文通過引入海上船舶避碰領域的概念,探索並首提出了內河船舶三維領域的觀點,並在此礎上對區壓力環境下的船舶三維領域模型做了較為深入的探索和研究,從而有望為區水域航標等礙航緩解設施的設置提供一種可行的新的理論依據。
  14. Taking the sucessful control experiences in previous cable - stayed bridge construction into consideration, the control principles and methods for gonghe bridge, that is controling the stress of both the top and bottom sides of main beam, regarding the second stretching as the hauling cable force method, are offered, and related construction procedures for all construction stages are designed

    在總結前人對斜拉施工控制經驗的礎上,針對公和斜拉施工控制提出了相應的控制原則和方法,即以「控制主樑上下緣應力」為主梁內力控制原則,以「二張拉」為斜拉索索力控制的方法,並根據各施工階段的具體需要設計相應的施工步驟。
  15. In this paper, an approach of the systematic artificial neutral net was introduced into the analysis on the ship - against - bridges probability with a computer programs. based on the basic data of the present 12 typical bridges as the sample, 4 chief influential factors as the input coefficient, such as the bridge span, the water flow rate, the incline angle between water flow direction and the direction normal to bridge axis, and the curve in the course near the bridge area, with the ship - against - bridge probability as the output coefficient, the intelligent judging system of the ship - against - bridges probability reflecting the influence of the above input parameters is obtained after training

    本文首將人工神經網路系統方法引入了船撞概率的研究當中,編制了計算程序,成功地以現有12座典型梁的礎數據為樣本,以梁跨徑、水流流速、水流方向與軸法線的夾角以及區航道彎曲度等4個船撞主要影響因素為輸入參數,以船撞概率為輸出參數,經訓練得到了能較好地反映上述輸入參數影響的船撞概率判斷系統。
  16. After that, she adopts game theory to study twice price reductions. from the game primary factors such as participants, strategy and benefits, she sizes up the efficiency of the price competition, and analyzes the strategical selection system in competition and cooperation between humen bridge co. and humen ferry co. in the third section, firstly, she draws out the linear regression formula with time series data and vehicle flow to estimate future flow under the condition of un - reducing price with the tools of statistics

    第三部分先用統計學的本原理和分析工具求得虎門大車流量與時間序列的線性回歸方程,來推算假設在未調價條件下的年流量;再運用管理經濟學的價格彈性理論比較調價前、后的車流量和價格的變化關系,求出二類車的價格彈性系數,用以判斷虎門大二類車調價策略的效率性。
  17. 6. 5 earthquake in the west of beijing in 1730 together with the data of drills, electromagnetism and gravity, the qinglongqiao - qiliqu and shahe active faults are identified for the first time. although at present all aspects of the earthquake are not fully known, the authors consider that the two active faults are responsible for the earthquake and the first one plays the leading role

    在前人研究1730年北京西郊6 . 5級地震的礎上,綜合井孔電磁和重力資料,經分析初步確定了青七里渠活動斷層和沙河斷陷南緣活動斷層的存在及其位置規模和本特徵,認為這兩條活動斷層是此地震的發震構造,其中青七里渠斷層在此地震中起主導作用。
  18. It ' s the first time clearly and systematically to present the concepts of restraint influence coefficient of steel to strain increment, to curvature increment and to deflection increment due to creep which are different each other. theoretical formulae are established, and approximate formulae are also obtained while considering the characteristics of common - used concrete and ambient condition of real bridges in china. so, an approximate restraint influence coefficient method to analyze the effect due to creep and shrinkage in pc bridges is put forward, and the equations to estimate second - force due to creep considering influence of steel in system - transferred continuous pc bridges is also established

    本文首清晰而系統地提出了鋼筋對徐變的不同效應(徐變應變、徐變曲率、徐變上拱)約束影響系數的概念,建立了相應的計算式;結合我國普遍採用的混凝土的徐變特性和梁的構造特點及工作中南大學博士學位論文摘要環境特徵,給出了具有較高計算精度的實用計算式;在此礎上,建立了梁徐變效應近似分析的鋼筋約束影響系數法,並推導出了考慮鋼筋影響的超靜定梁徐變內力的近似計算式,可方便地應用於梁研究和設計中。
  19. The secondary beam of a 125 / 30t 16. 5m metallurgy crane bridge in anyang iron and steel corporation was damaged, and this accident was reappeared by computer

    本課題以事故再現的本理論為指導,運用模擬法對安陽鋼鐵公司某煉鋼廠125 30t 16 . 5m冶金式起重機發生過的一架副梁被頂彎的事故進行再現分析。
  20. A baseline finite element model must be a full three - dimensional model that can reflect the built - up bridge conditions comprehensively and correctly. in addition, it must be a model properly validated by the bridge field tests

    斜拉準有限元模型首先應該是能夠全面、正確反映結構真實性態的完整的計算模型,其,它還應該是經現場試驗驗證了的有限元模型。
分享友人