正常運行負荷 的英文怎麼說

中文拼音 [zhēngchángyùnháng]
正常運行負荷 英文
normal running load
  • : 正名詞(正月) the first month of the lunar year; the first moon
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 正常 : normal; regular; average
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  • 負荷 : [電學] load; charge; weight
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    電力預測是供電部門的重要工作之一,準確的預測,可以經濟合理地安排電網內部發電機的啟停,保持電網的安全穩定性,減少不必要的旋轉儲備容量,合理安排機組檢修計劃,保證社會的生產和生活,有效地降低發電成本,提高經濟效益和社會效益。
  2. The # 9 and # 10 142mw heat supply units in gansu xigu power plant, the steam extraction main pipe system adopt westation control system of westing house company and deb coordination control policy in design. the coordination control policy successfully expand the whole the running range, from the normal running condition to abnormity running condition and start or stop condition, which simplicity base on burthen and main steam pressure coordination control

    甘肅西固熱電廠# 9 、 # 10142mw抽汽母管制供熱機組,選用美國西屋公司westation控制系統,設計、應用了deb協調控制策略,從單純作為和主蒸汽壓力控制協調的基本功能,成功擴展到整個范圍,即從工況到異工況及啟、停工況。
  3. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川電網的二灘水電站和500kv輸變電系統投入后,由於二灘水電站的大量電力遠距離輸送至中心,迫使中心的火電機組在豐水期大量停機,使中心失去電壓支撐,大大降低了電網的電壓穩定水平;同時,因為四川電網中的無功補償裝置全為靜態無功補償電容器(或電抗器) ,這些設備只能在系統狀態下起到無功補償和電壓支撐的作用,而在電網出現事故時,不但不能起到電壓支撐作用,反而會促使電網電壓崩潰事故的發生。
  4. With the development of modern industry, the nonlinear loads of power system are greatly increased. they absorb the non - sine current waves from power network and result in voltage aberrance. voltage aberrance makes the power quality severely deteriorate, endangers the safe and economical running of power system and affects some users ’ s normal work

    隨著現代工業的發展,電力系統中的非線性大量增加,這些非線性從電網吸收非弦電流,導致電網電壓發生畸變,使電能質量嚴重惡化,危及電力系統安全和經濟,影響了用戶的工作。
  5. Furthermore, it is very important that improve the autoimmunization of substation without watch - keeper. in the design of substation, we predigest main wiring with a minitype base and adopt simple wire - connection : dule t type is used in 66kv side, segmented single bus - bar with hospital bus - bar is used in l0kv for major load

    在該無人值班變電所的設計中,以小型化模式為基礎,簡化主接線: 66kv側採用雙t接線方式,時雙線雙變壓器分列; 10kv側由於饋電線路較多,較為重要,因此採用單母線分段帶旁路接線方式。
  6. All kinds of heat loads of the tf magnets on east have been analysis in the normal operation conditions

    摘要文章分析了east托卡馬克核聚變裝置在情況下產生的各種熱
  7. The purpose of design calculation is of course to attempt ensuring safe operation under normal capacity

    設計計算的目的當然是力求確保設備在下的安全
  8. Along with the development of power system, more and more generators and ehv transmission systems are put into operation. there come many new situations, such as the lengthening transmission distance, the heavier load, the increasing transient elements during the transient process. these new conditions influence the correct working of relay protections

    隨著電力系統的不斷發展,大容量發電機組和超高壓輸電系統的相繼投入,系統中出現了許多新的情況,如輸電距離增大、加重、故障暫態過程中的暫態分量大大增加、持續時間變長等,這些情況對目前用的各種繼電保護方法的確動作會產生許多不利的影響,甚至不能
  9. To ensure the safe and normal operating of the machine, the actual work load has been analyzed and the malfunction causes have been rooted, and based on this, the necessary of optimizing the rolling process and optimizing solution have been presented

    為保證設備的安全,對軋機現有和軋制工藝進了分析,找到引起問題的原因並在此基礎上提出了軋制工藝優化的必要性和優化方案。
  10. Based on the change of electrical load, promptly monitor stop and run operation of capacitor to ensure effective watt factor on proper level

    根據分路用電的變化,及時檢查電容器的投入和退出,保證有功功率因數維持在水平。
  11. The operational characteristics with the different operational parameters, with different terminal cooling load of air conditioning system, with different heat exchange characteristics between underground u - tube pipe loop and soil, etc. have been studied. the operational characteristics of gshps within starting period, normal period and the period of variable operation patterns under different seasonal conditions has also been studied

    研究熱泵機組參數變化、空調末端變化和地下埋管換熱器變化時土壤源熱泵系統的特性;開展不同季節和不同工況土壤源熱泵的啟動、和變工況特性的研究。
  12. Additionally, the dry - pit submersible pumps shall operate within the acceptable field vibration limits as established by the hydraulic institute for this class of equipment at all speeds and loads within the operating range specified herein

    此外,乾井潛水泵應該能夠在美國水利協會為這類設備規定的可接受的現場振動范圍內,在本說明書的工作范圍內,以全速、滿轉。
  13. Seismic safety assessment method and flow load control problem of power system are discussed deeply, and the remarkable criteria of current under normal process and system network model are suggested

    摘要對電力系統的地震安全性分析與控制問題進了深入研究,建立了系統情況下各支路的電流的評價準則和電力系統的網路分析模型,分析了傳統潮流分析方法的優、缺點。
分享友人