比伯河 的英文怎麼說

中文拼音 []
比伯河 英文
biber
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : 伯名詞1 (伯父) father s elder brother; uncle2 (在弟兄排行里居首) the first [eldest] of brothe...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • 比伯 : bibber
  1. " one branch of it, " according to the historian of concord, for i love to quote so good authority, " rises in the south part of hopkinton, and another from a pond and a large cedar - swamp in westborough, " and flowing between hopkinton and southborough, through framingham, and between sudbury and wayland, where it is sometimes called sudbury river, it enters concord at the south part of the town, and after receiving the north or assabeth river, which has its source a little farther to the north and west, goes out at the northeast angle, and flowing between bedford and carlisle, and through billerica, empties into the merrimack at lowell

    「它的一條支流」 ,據研究康科德的歷史學家說(我喜歡引用權威) , 「發源自霍普金頓的南部,另一條支流來自西區的一個池塘和一大片雪松沼澤, 」它們從霍普金頓和南區的中間流過,途經弗萊明翰,然後穿過薩德里和韋蘭(在這一段它有時被稱為薩德) ,從南部進入康科德鎮,在與發源自較遙遠的北面和西面的阿薩貝斯交匯后,從東北方向流出,然後從貝德福德與卡萊爾中間穿過,流經勒瑞卡,最終匯入洛厄爾的梅里馬克
  2. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公峽水電站施工期建設提供技術支撐。
  3. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗較相結合的方法,首先對黃峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
分享友人