比尺 的英文怎麼說

中文拼音 [chǐ]
比尺 英文
guide
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : 尺名詞[音樂] (中國民族音樂音階上的一級 樂譜上用做記音符號 參看「工尺」) a note of the scale in ...
  1. The scale effects due to unsimilar bed risistance is discussed in detail, and the correct way of scour depth is supposed. at last, a new transport rate formulas of uniform or nonuniform bed load is given

    本文還對由於阻力不相似而引起的比尺效應進行了較詳細的討論,從理論上給出了沖刷深度比尺效應的修正方法及新的均勻、非均勻推移質輸沙率的計算公式。
  2. Furthermore, a plan of designing the small model having a step bottom is provided in the experiment of restricting model. and a plan of jetting from foreside and middle part of the large scale model is adopted in experiment, all these are our innovative points

    此外,在小比尺模型試驗中,還提供了一種斷階噴氣試驗設計方案,在大比尺模型試驗中,採用了首中部同時噴氣的方法,這些都是本文試驗的創新之處。
  3. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄洪模型試驗,結合白山已建的建築物及籌建的白山大泵進水口,選定水墊塘的總體布置方案。
  4. Abstract : through study on energy dissipation of goupitang project on the wu - jiang river, the velocity field in the water cushion pool downstream ski - jump or drop was measured by hot - film anemometers on a fine model with scale 1 380

    文摘:結合烏江構皮灘水利樞紐工程消能問題研究,用熱膜流速儀在比尺為1 380的精細模型上量測了拱壩挑跌流在水墊塘內的流速場,並由試驗成果分析了淹沒射流在水墊塘內的消能過程,計算了消能率。
  5. Through developing the comprehensive experiment device with large - scale drum strength and stability, the stress - measuring experiments of various wall thickness of the normal drums of the cranes were performed. the law that the stress of the drums along the circumference and along the axis changes with the load increase of the wire ropes was studies for the first time

    通過研製全比尺大型捲筒強度、穩定性綜合試驗裝置,對起重機常用規格的捲筒進行了各種壁厚條件下的應力測量試驗,首次對捲筒體周向和軸向應力隨鋼絲繩逐步加載過程變化的規律進行了研究,發現最大應力產生在鋼絲繩繞過后3 ~ 5圈截面處,該現象與理論分析結果也是符合的。
  6. The eminent dutch management researcher, greet hofstede, made investigations twice for ibm corporation. he classified four major dimensions in work - related value by means of a statistic analysis of the data collected. basing on hofstede ' s theories and by comparing with those of other researchers, we can possibly identify some of the major dimensions along which cultures differ

    荷蘭著名的管理研究學者霍夫斯泰德( greethofstede )為美國通用機器公司( ibm )主持的調查共進行了兩次,對搜集的資料進行統計分析,最後分離出價值觀念對的四個度,根據hofstede提出的理論並較其他學者的成果,得出以下四個重要的對比尺度,即個人主義?集體主義,對權力距離的態度,對不確定因素的迴避程度,以及成就?關系。
  7. Abstract : in light of thicker grain and smaller viscosity of debris flow, a segmented simulation of the debris flow with flume is presented. for the first time. more difficult resistance similarity is brought about by geometric rate without excessive coarsing and discontinuous similarity of sand grain composition in model is eliminated with different grain scale. on this basis the density similarity and sand conveying similarity are achived. the method presented is verified through a model test case

    文摘:針對水石流顆粒粗,粘性小的特點,提出了利用水槽進行分段模擬水石流的設想,首次通過幾何變率解決難度較大的阻力相似問題,改變了以往過度加糙的方式;通過變粒徑比尺的方法消除了模型沙級配不連續相似的問題,較好地實現了固體物質級配相似,達到了泥石流的密度相似和輸沙相似.通過水槽概化模型試驗實例,對本方法進行了驗證
  8. According to the gravity - elasticity similar law the model scale of bai shan pumped - storage hydroelectric plants is taken as the trashrack bar is made of zinc, the relative errors between its practical density and elastic modulus and its proper values are - 7. 82 % and + 1. 43 %, respectively. by lvs measuring the velocity distribution ahead the trashrack bar and on the basis of the velocity distribution the working conditions of the pumped - stroage hydroelectric plant are controled. the dynamic strain of the trashrack bar induced by flow are measured using strain slips

    選擇白山抽水蓄能泵站攔污柵水彈性模型的主要比尺為_ l = 3 、 _ e = 3 、 _ p = 1 ,柵條用鋅板加工而成,模型材料的實際密度和應有密度的相對差為- 7 . 82 ,模型材料的實際彈模和應有彈模的相對差為+ 1 . 43 ,用激光流速儀量測柵前流速分佈,並用流速分佈作為控制工況的依據,用應變儀量測柵條應變。
  9. The resistance coefficient of the river, the scale affect of the rigid bed model, and the rule of channel dredging are also discussed in order to obtain the reliable conclusion

    對河床的阻力系數、定床模型試驗的比尺效應以及電廠下。游清挖原則進一步研究,以期給出較明確的結論。
  10. Time, the paper studies rheology of rockfillwith yin zongze model, of two yield surface and rheological relation of negative exponential, and some formulas are obtained it is difficult to determine the rheological parameters, of rock fills through laboratory test for the limited specimen, dimension, short duration and particle, constituents

    本文採用殷宗澤雙屈服面模型與堆石流變的負指數變化關系式,研究堆石的應力與流變關系,並推導了相應公式。在流變參數確定方面,由於室內試驗的試樣寸、時間比尺和顆粒破碎很難模擬現場條件,根據室內試驗直接確定堆石的流變參數是困難的。
  11. 3 bottom width 1 / 2 ” smaller than size spec, pls be careful in production not to make any smaller

    腳圍寬比尺碼表偏細1 / 2 」 ,生產中應改注意不可再偏細。
  12. What is taken account of includes the effects of the material, geometrical shape, manner of loading, ratio of cycle stress, residual stress and short crack in weld toe on fatigue strength

    該模型考慮了材料、幾何形式、荷載形式、應力寸效應、殘余應力及焊趾根部短裂紋等因素對疲勞強度的影響。
  13. According to the selected project, a stability test with scale of 1 : 35 of cushion bottom had been done. with the research results of the experiments and the flow shape of xiao wan hydraulic power station were thought about, on the other hand, the ternary complex jet shape of baishan water cushion was analyzed, all this gave a base for the analysis of the force of the cushion bottom. through observation, the dynamic water pressure, the fluctuation pressure, the time - homogeneous pressure on the surface of the bottom and the characteristics of the fluctuation pressure could be got, also the calculation method and the test results were compared to get the argument

    針對選定的方案,進一步做了1 : 35比尺的水墊塘底板穩定性試驗;通過試驗及借鑒小灣水墊塘內水流流態的研究成果,分析白山水墊塘內三元復雜淹沒射流流態,為水墊塘內底板受力分析打下基礎;通過觀測得到水墊塘底板動水沖擊壓力、脈動壓力、底板上下表面的時均壓力及脈動壓力特性,並通過計算方法與試驗成果進行相互較論證。
  14. The thesis is the initial research content of the project " bucket foundation and unstability mechanism research influenced by bucket foundation on silty. sand seabed ", which is supported by the national natural science fund. it mainly carry about the research of seepage gradient in the process of suction penetration and unstability mechanism of silty sand in the bucket foundation, and it also discuss and analyze the penetration effect of bucket foundation of the different ratio size

    本文是國家自然科學基金項目「海上平臺桶形基礎及其作用下的粉質土海床失穩機制的研究」的前期研究內容,主要通過模型試驗對負壓沉貫過程的滲流梯度及其桶內粉質土的失穩機制進行研究,並探討和分析了不同比尺的桶基的沉貫效應。
  15. The film resistance parallel - connected between the emitter and the base of power devices can

    薄膜電阻的升阻比尺、 。
  16. The experimental method of the model test with 1 : 6 scale based on the work mechanism of bearing of steel y - pipe strengthened inside with crescent rib in combination with surrounding rock mass simulated by composite materials is adopted and the regularity of their participant capacity to bear inner water pressure is analyzed in this paper

    摘要本文結合實際工程採用幾何比尺為1 : 6的物理模型試驗方法,用不同材料分層組合模擬圍巖,對水電站內加強月牙肋鋼岔管與圍巖聯合承載的工作機理、圍巖分擔內水壓力的規律進行分析。
  17. Moreover, the current development status of sedimentation simulation research in china was demonstrated and five big trends for the future development of sedimentation simulation technologies were analyzed. the geometric similitude, kinematic similitude and kinetic similitude between the lab model and the prototype for sedimentation simulation form the basis of three similitude principles, while three similitude rules, i. e., the suspension similitude rule, the particle movement similitude rule and the riverway distortion similitude rule can be deduced from the three similitude principles, and thee principles and rules are the basic theories for the development of physical simulation about the clastic sedimentation processes

    沉積模擬實驗模型及原型的幾何相似、運動相似、動力相似及其由上述三個相似性原理導出的懸浮相似、顆粒運動相似及河道變形相似等三個相似準則是開展碎屑沉積過程物理模擬的基本原理;在此基礎上,論述了碎屑沉積模擬研究的主要方法?自然模型法和比尺模型法;提出了開展碎屑沉積過程物理模擬的主要方法步驟,這是本論文第二章的主要內容。
  18. In experiment study, the author designed two models - small scale model and large scale model according to difference of experiment pool and analyzed the feasibility of the two models

    在試驗研究部分中,根據試驗水池的不同,設計了兩種模型? ?小比尺模型和大比尺模型,並分別對其可行性進行了分析。
  19. The plane scale of model was 500, vertical scale was 60 and varied ratio was 8 : 33. the contrast trial. utilizing trial of long series and typical flood test have been conducted

    東莊水利樞紐渭河下遊河道動床物理模型選定平面比尺為500 ,垂直比尺為60 ,變率為8 . 33 ,在此模型上進行了水庫運用對試驗、長系列運用試驗以及典型洪水試驗。
  20. Based on the researches at home and abroad, aiming at the application of dynamic consolidation in compacting loess embankment, this paper makes assessments and analyses of the concerned factors and provides the laws of dynamic consolidation dealing with loess embankment according to the large - scale model test indoor ; combined with tonghuang highway construction, field tests of dynamic consolidation dealing with loess embankment is carried out in the representative loess - embankment experimental sites and some regularities of loess before and after handled by dynamic consolidation is put forward by physico - dynamic property experiments and electron - analysis ; at last, the author makes a systematic analysis of information related and presents the applicable condition, compacting technique and checking method which applies to dynamic consolidation dealing with loess embankment on the basis of field tests and model experiments indoor

    本文在國內外資料調研基礎上,針對強夯法在黃土路堤壓實施工中的應用,對強夯處理黃土路堤的有關因素進行了評價分析,並通過室內大比尺模型試驗得出強夯壓實黃土路堤的規律;結合銅黃公路建設,選擇典型黃土路堤試驗段,進行了強夯壓實黃土路堤的各項現場試驗,通過物理力學性質試驗和電鏡分析得出強夯前後黃土料壓實體的有關規律;最後,在室內外各項試驗基礎上,對有關資料進行了匯總分析評價,提出了強夯處理黃土路堤的適用條件、施工工藝及檢測方法。
分享友人