比較布置方案 的英文怎麼說

中文拼音 [jiàozhìfāngàn]
比較布置方案 英文
alternative layout
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : Ⅰ動詞1 (比較) compare 2 [書面語] (計較) dispute Ⅱ副詞(比較) comparatively; relatively; fair...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • 比較 : 1 (對比) compare; compare with; contrast; parallel (with); comparison; by comparison; in comp...
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工。通過水力學計算、結構設計、導流投資、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流的合理性和經濟性,為施工決策提供理論依據。
  2. Analysizing and comparing various structure scheme, the analysis result leads to that the results from floor deformation for brick masonry building with frame - shear wall structure at first two stories concentrate on the second story and transitional - third - floor. the earthquake response of every first floors, especially the transitional floor brick wall is greatly influenced by the first aseismic wall. however the structure ' s earthquake response is gentlely influenced by the change of the transitional floor ' s thickness

    通過對不同結構的分析,結果表明,在地震荷載作用下,樓板變形對底部兩層框架抗震墻結構的影響主要集中在二層及過渡層第三層,底部抗震墻的對底部各層特別是過渡層磚墻的地震反應有大的影響,而過渡層板厚的變化對結構地震反應的影響弱。
  3. The arrangement is applicable to the hydropower station with higher head or flow rate and has the advantages such as saving investment, flexible operation and simple electric installations ; which provides an another way with another alternative for hydropower station to select the hydro - generating facilities

    這種式可適用於水頭或流量變化大的水電站,具有節省投資、運行靈活、電氣設備簡化等優點,為水電站水輪發電機組設備的選擇提供了另一條途徑,增加了一個對
  4. To reasonably plan out the scheme for the sewage discharge outlets of changshu fluorine chemical industry project, the article makes an ana lysis on the water environmental features of changshu section of the yangtze riv e, develops a plan two - dimensional model of coupled water flow - quality for its co mplicated underwater topography and stream flow - field. the model is relatively ac curate and practicable to predict the impact of scheme on water quality. varied s chemes have been compared and demonstrated from multiple angles, such as flow fie ld, impact assessment of water quality, technique and economy. the scheme of sewage discharge outlets away from the shore is recommended. the article provides a sci entific basis for the engineering design and envirommental management of the pro ject

    為合理確定常熟氟化工項目排污口,本文在分析長江常熱段水環境特徵的基礎上,針對其復雜的水下地形和水流流場,建立了為準確和實用的平面二維水流水質耦合數學模型,預測計算了三套污水對重點保護水域影響程度和范圍,並從水流流場、水質影響評價、技術經濟多角度對進行了論證,最終推薦污水江中排放的,為項目的工程設計和環境管理提供了科學依據。
  5. Alternative comparison of the design of the main inclined shaft of meihuajing mine

    梅花井煤礦主斜井
  6. In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit

    摘要針對向家壩水電站特殊的自然條件和工程特點,其施工導流經過對多個進行,從施工、後期度汛、施工期通航、發電工期等面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導流
  7. The function of the software is useful, it has provided many functions such as the calculate of crop water requirement, pipeline layout ( automatic layout and manual operation ) and its optimization, pipe diameter optimization. investment budgetary estimate and economic beneficial result can be result. and can rapid create plan and do plan comparison, the software provides many kinds of result output such as graph. text, table and so on

    該系統可以實行作物需水量計算,系統設計流量推算、管道水力計算、工程投資概算,經濟效益分析等功能,建立了常用的數據庫(管材、管件、水泵和電機等)並對其進行管理和維護,可以實現包括管道、管徑優化、管材選擇等多種參數選擇在內的多種、優選。系統能提供圖形、文本、表格等多種形式的成果輸出,人機交互界面友好,操作便。
  8. Referring to three kinds of plan irregularity, structures individually with four kinds of irregularity as eccentricity in one direction, eccentricities in two directions, re - entrant corner irregularity and diaphragm discontinuity have been analyzed to investigate the relationship between torsion effects and parameters of above irregular structures. the parameters and the schemes for determining the scope of structures with different kind of irregularity considering seismic action in two directions simultaneously are proposed, some conclusions have been get as following : it is indicated by the analysis results that torsion effect has no dependency relation with eccentric torsional angel adopted in code for seismic design for buildings. it is suggested that the eccentric torsional angel should not be take as the parameter of torsion effect of structures considering seismic action in two directions simultaneously ; for the structures with regular plan and elevation and with eccentricity in one direction due to irregular mass layout, the relative eccentricity can be take as the parameter of torsion effect of structures considering seismic action in two directions simultaneously ; for the structures with regular plan and elevation and with eccentricities in two directions due to irregular mass layout, the ratio of relative eccentricities in two directions and the angel of them can be take as the parameters of torsion effect of structures considering seismic action in two directions simultaneously ; it is indicated by the analysis results that the torsion effect has no dependency relation with re - entrant corner ratio adopted in code for seismic design for buildings as

    所取得的主要結論有:結構的扭轉效應與《抗震規范》所採用的扭轉不規則指標即偏心扭轉角之間的相關性差,偏心扭轉角不宜作為判斷結構是否計及扭轉效應及需考慮雙向水平地震作用的界定指標;對于樓層間均勻偏心的多層單向偏心結構,建議採用相對偏心距作為需考慮雙向水平地震作用的界定指標,並給出針對不同平面尺寸的界限相對偏心距;對于樓層間均勻偏心的多層雙向偏心結構,建議採用兩個主軸向的相對偏心距及其夾角作為界定指標,結合單向偏心結構的界定進行需考慮雙向水平地震作用的結構范圍界定;凸凹不規則結構的扭轉效應與凸凹例無正相關關系, 《抗震規范》要求所有平面不對稱的凸凹不規則結構計及扭轉效應的規定欠妥當,建議凸凹不規則界限值從30改為15 ,只要求分析採用空間模型合適; 《抗震規范》關于有效樓板寬度小的結構需計及扭轉效應的規定很有必要,樓板局部不連續的結構需採用符合樓板實際剛度的計算模型予以分析,可使用相對偏心距(及其夾角)參照單向(和雙向)偏心結構的界定,界定樓板局部不連續結構是否需要計入雙向水平地震作用下的扭轉效應。
  9. Combining the leading problems and realistic state of medium - sized rvte of hubei, the author bases on the demand to talents of industrial structure adjustment, market economy and rural economic construction, uses the principle in pedagogy, economics, demography and sociology, etc., adopts the methods of investigation, informal discussion, comparative, summary of experiences and case analytic approach, summarizes historical experience and lesson of domestic and foreign rural vocational education, analyses social reason and inside reason that hinder the development of rvte in china, and puts forward measures and countermeasure of reforming and developing rvte further from the respects of improving the further understanding importance and urgency of rvte, disposing vocational education teacher resources and optimizin g the structure of overall arrangement rationally, doing specialty construction well, establishing the goal system of teaching with pertinence and adaptability, changing the single teaching mode, reforming the course mode, setting up flexible teaching management style, strengthening the vocational guidance and the vocational faculty of " double division types ", reinforcing the base for exercitation, focusing on service to agriculture, launching various kinds of training in a more cost - effective manner, developing civilian - run vocational education actively, attaching importance of inspecting the executer of the " law of vocational education " and supervising and evaluating the work of rvte

    結合湖北省農村中等職業技術教育的主要問題和現實狀況,作者根據產業結構調整、市場經濟和農村經濟建設對人才的需求,運用教育學、經濟學、人口學和社會學等面的原理,採用調查法、法、座談法、經驗總結法和例分析法等研究法,通過總結國內外發展農村職教的歷史經驗和教訓,分析了阻礙我國農村職教發展的社會原因和內部原因,並從進一步提高對農村職業技術教育重要性和緊迫性的認識、採取因地制宜、分區發展、合理配職教資源和優化局結構、搞好專業建設、確立具有針對性、適應性的教學目標體系、改變單一的教學模式、改革課程模式、靈活教學管理式、加強職業指導、加強「雙師型」職教師資隊伍建沒、加強實習基地建設、強化為農服務、大力開展各種培訓、積極發展民辦職業教育和加強《職業教育法》的執法檢查與對農村職業教育工作的督導評估等面提出了進一步改革與發展農村職業技術教育的措施和對策。
  10. Taking the instance of the design of prestressed anchor cable slide resistant pile for the harnessing of k1158 + 640 landslide of jiaozuo - liuzhou railway, and on the basis of demonstrating the geological characters and stability analysis of landslide, this paper discusses the design and calculation for the selection of optimum locations of slide resistant pile distribution, the length of prestressed anchor cable and the number of hole diameter anchor cable, and also the design of the diameter of the slide resistant pile and reinforcement

    摘要以焦柳鐵路k1158 + 640滑坡治理工程設計為實例,在闡述滑坡的地質特徵、穩定性分析的基礎上,依據滑坡下滑力曲線,選取抗滑支檔工程的最佳部位,進行懸臂抗滑樁、預應力錨索抗滑樁兩種的經濟技術,確定選用預應力錨索抗滑樁
  11. Therefore, drawbead is employed together with bhf to control the drawing process, and several typical layouts of drawbead are analyzed and compared via fea ( finite element analysis ), with the most effective one then being applied to stamping experiments

    因此,文中採用拉延筋和壓邊力來共同控制拉延成形,並通過有限元分析了幾種典型的拉延筋,選擇其中最有效的一種進行試沖試驗。
  12. The analyse shows : the three - dimension visual terrain model of the landslide body not only embodies totally its terrain characteristic and sectional characteristic, but also can make the ground characteristic analysed and hold on whole ; compared to the deep sliding surface, the shallow sliding surface has the similar whole slope and is more smooth and simple, so it is worse in the stability. and the parts of the deep sliding surface have great difference, it causes the different stability, among them the stability of the midst part is the worst. so the shallow sliding should be controlled importantly, and the controlling scheme should be assigned in the midst part of the deep sliding surface in the controlling design

    分析得出:滑坡體三維可視化地面模型不僅完全體現了該滑坡體的地面特徵和剖面特徵,且能夠從總體上進行分析和把握地面特徵;由於淺層滑動面與深層滑動面整體坡度相近,且深層滑動面平坦、簡單,故淺層滑動面穩定性差,且由於深層滑動面各部分形狀存在大差別而導致穩定性不同,其中中間部分穩定性最差,故在防治設計時應重點治理淺層滑動且治理於深層滑動面的中間部位處。
分享友人