水下滑道 的英文怎麼說

中文拼音 [shuǐxiàdào]
水下滑道 英文
under water launching ways
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  1. Furthermore, field observations and data records showed the traces of possible large - scale landslides, which would result in drastic damages to the shipping and the water consonancy project on yangtze river areas, and endanger the nearby residents and their properties. therefore, it is important to predict the landslides to minimize the damages

    一旦發生坡,我國的黃金?長江將有可能嚴重阻航,甚至斷航,危機附近居民生命財產安全,影響利樞紐工程的建設,因此進行坡預報做到提前防災減災及其重要。
  2. The new applications of survey are described in the fields of indicating underground advance, seeking out lossed ore deposit, discovering neotype deposit for detecting the gold deposit ; determining productive aquifer for looking for groundwater ; discovering fracturation zone controlling crop out of hot spring for developing the hot spring, and locating the position of ancient rock slide for prospecting the earth slide

    摘要綜述了應用輕便測量技術在地礦及地尋找等方面的一些新應用,例如:在金礦勘探中指導坑掘進,找到了被遺漏的礦體,發現了新的礦化類型;在地尋找中,確定了富層位;在溫泉開發中,探明了控制溫泉出露的斷裂帶;在坡研究中,確定了古坡的具體位置。
  3. The theoretic of calculate the react force act on the launching way also be investigated

    對74500噸散貨船時的反力進行了實船計算。
  4. In order to resolve the strength problem of 74500dwt bulk carrier on launching way, two aspects of problem are investigated in this report : 1 ) the analysis and calculation of the force act on the hull and the launching way when ship launching ; 2 ) the strength analysis and calculation of bottom structure in forward area during ship launching

    為了解決74500噸散貨船時船體結構的強度問題,本文主要對兩方面的內容進行了研究: 1 )船舶縱向時的受力分析和反力計算: 2 )艉浮時艏部區域底部結構強度分析計算。
  5. Several ocean scientists reported on the use of underwater gliders at the biannual ocean sciences meeting this week sponsored by the american geophysical union. " the ability to be in the ocean all the time and do it over a sustained period people are doing it now, " said oscar schofield, professor at the institute of marine and coastal science at rutgers university

    據美聯社3月4日報,美國新澤西州拉特格斯大學海洋和海岸科學中心的斯科菲爾德教授在會上說,這種翔機的最大特點是重量較輕價格便宜便於部署, 「具備在全天候持續不斷工作的能力」 。
  6. At present, more and more large tonnage ships are built with the development of ship industry, the force between hull and shipway increased, the damage of ship structure was also reported. but the existed method is not efficiently for calculating the distribution of force acted on forward during stern floating which is the moment of truth during ship launching, so it is important to calculate ship launching precisely and take measure to preclude such accident

    目前隨著船舶工業的發展,建造船舶噸位越來越大,船體所受反力隨之增大,在實際生產過程中已有船體局部結構不同程度損壞的報,而現有的計算方法在的最危險時刻艉浮時反力的分佈情況方面的計算顯得不夠準確,如何準確進行計算並採取相應的措施來防止這類問題發生顯得十分重要。
  7. In 1928, a concrete slipway was built for seaplanes using kowloon bay

    一九二八年,一條混凝土建成,供在九龍灣升降的上飛機使用。
  8. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、坡、泥石流引起的堆積物和冰川作用形成的冰磧物堵塞河,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶流作用,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華堤壩,使湖泊的形成成為可能。
  9. The truncated hockenheim track is usually one of the hottest on the calendar, and demands medium - low downforce levels, because of the long, curving back straight ; good mechanical grip, because the slow corners are always slippery ; good stability under heavy braking, particularly in turn 6 where out - braking opportunities present themselves ; and strong engines, as almost three - quarters of the lap is now at full throttle

    被縮短了的霍根海姆賽是賽程表上最炎熱的一站,由於長距離彎曲的非終點直而需要中低型的壓力平,又由於慢速彎總是很還需要良好的機械抓地力以及大力剎車的穩定性,尤其是第6彎為自己提供了不剎車的機會,另外還需要強勁的引擎,因為現在的一圈之中幾乎有四分之三是滿油門。
  10. The fence and makeshift house sent the mudslide on a 90 - degree swerve, and the water, mud, sand, and everything else slid safely past his home

    大大小小的土石流含著大量的雨和泥沙,往房屋旁的路一路去,真是有驚無險!
  11. When the three - gorge reservoir is sluiced, the underground water level will ascend obviously and mechanics parameters of the slip strip below the reservoir water level can drop further, sidaogou landslide can lose stability wholly in controlled condition influenced by buoyancy of underground water and saturation stress at water level dropping

    三峽庫蓄后,體內的地位將明顯抬高,庫帶力學參數會進一步降低,受體內地揚壓力及位降落時滲透壓力的影響,四坡在控制工況可能整體失穩。
  12. The study shows that the most likely sliding path is located shallowly under the rock bed and the sliding path runs close to a line from tensile area at dam heel to dam toe. staircase sliding paths buried less than 14 meters bellow dam heel are also dangerous, but they are not the most dominant

    研究表明,最危險移路徑處于壩基面以淺層,移通為從上游壩踵拉裂區沿近直線方式向游壩趾出;正常蓄位時, 9b 、 4b壩段最危險移路徑安全系數分別為k _ s = 4 . 15 、 3 . 05 。
  13. Other brands leave annoying streaks and strong detergent smells on dishes, even when you rinse them several times

    若是其他的牌子,即使過數次,碗碟仍會潺潺,而且還會留強烈的洗潔精味,感覺很不安全。
  14. The retaining wall reclining on the slight slope built on soft foundation is usually used in protecting the shore of river, the contradiction between the lack of impartiality in stress of the base and the small stress allowed by the foundation as well as the lack of stabilization of the breast wall is a hard nut to crack in the engineering. in the paper, a tenon - base is added under the base of the retaining wall, on the study of the choice of the parameters and formulas used in calculation and the research of theory used in calculation, method used to deal with the load, etc, the writer gives a way to crack the nut mentioned above paragraphs and presents a qualitative and quantitative analysis about them, such as the equivalent inner friction - angle ( d ) and the passive press of the clay ( ep ), etc. in the end of the paper, using modern optimization method, a design of the retaining wall reclining on the slight slope built on soft foundation is done, the result is economical, and accords with the fact

    軟基上的仰斜式擋土墻在利工程河護岸中經常遇到,仰斜式擋土墻基底偏心應力較大和軟基土地基容許承載力偏小的矛盾以及擋土墻抗穩定不足是工程中難以解決的難題。本文在對仰斜式擋土墻設計中有關計算參數的選擇、公式的選用應該注意的問題進行了研究,對河護岸軟基礎上的仰斜式擋土墻採用凸榫基礎處理的方法,就其計算理論、設計驗算中各荷載的具體處理方法進行了較為細致的研究,提出了解決軟基礎上的工仰斜式擋土墻難以解決的難題的方法,並對有情況粘土等效內摩擦角_ d 、凸榫被動土壓力e _ p等在計算中的取值提出了定性和定量的分析。最後利用現代優化方法對軟基礎上的工仰斜式擋土墻進行了結構優化設計,得出了符合實際的結果,與其它重力式擋土墻形式進行比較,取得了明顯的經濟效益。
  15. A good way to end a visit to chiku is to follow provincial highway 17 south and take in some of the sights of tainan city, such as anping fort, the former premises of tea traders tait co., fort provintia chihkanlou, or woozland amusement park famous for its high water - slides. when in tainan, don t forget to sample mr. chou s shrimp rolls, and yungtaihsing candied fruit

    沿著臺十七線省往南,亦可前往安平古堡德記洋行赤?樓土城鹿耳門聖母廟以及以高空聞名的悟智樂園,品嘗周式蝦卷永泰興蜜餞,為七股沿海之旅畫完美的句點。
  16. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  17. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  18. Seattle public utilities worker reta sok uses a segway electric scooter as she checks water meters in the university district neighborhood of seattle in this august 3, 2006 file photo

    在西雅圖大學附近地區,環保工人reta sok乘著一輛賽格威電動板車檢查井蓋。
  19. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪利樞紐工程溢洪樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗樁,再通過適量的開挖提高邊坡穩定性,或將坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  20. I don ' t know either. but a puddle of water did gather at my feet and it was slippery

    倉里滿: 「我也不知。可是,我的腳積了一灘,很。 」
分享友人