水下索道 的英文怎麼說

中文拼音 [shuǐxiàsuǒdào]
水下索道 英文
underwater cable way
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 索道 : cableway; blondim; ropeway
  1. In recent years, plentiful and substantial fruits achieved by the lb method in simulations of hydraulics, multiphase flows, flows in porous media and heat transfer as well as magnetohydrodynamics, have revealed a broad perspective of application of this method, it will become a powerful competitor to the conventional approaches. in order to absorb the recent achievement in theory and application of the lb method, explore new ways in hydraulic computation to promote the development of practice, some work is car ried out in this thesis, as following : advances in the theory research and application, deductive process of the d2q9 model and some other commonly used models of the lb method are summarized. based on the hydrodynamic and general boundary conditions, a new joint boundary condition is presented, it integrates advantage of the two conditions above and obtains very good results in dealing with all kinds of boundaries of flow fields

    為了消化和吸收近年來lb方法在理論和應用方面的新成果,探力計算方面的新途徑以促進lb方法實用化的發展,本文進行了列研究工作:綜述了lb方法在理論研究和實際應用方面的新進展,以及d2q9模型的推導過程和其他一些常用的模型;在動力邊界條件和通用邊界條件的基礎上提出了一種新的聯合邊界條件方法,它綜合了上述兩種邊界條件的優點,在流場的各種邊界處理中取得了非常好的效果,經過模塊化的處理以後這種邊界條件具有更好的實用性;針對均勻網格的lb方法計算效率較低的不足,提出了雙重網格的latticeboltzmann方法,通過二維poiseulle流動、后臺階流動和渠方槽流動三個算例的模擬,證明這種方法能夠明顯地提高流場模擬的計算效率;此外,根據復雜區域流場的特徵提出了latticeboltzmann方法的分塊-耦合演算法,利用lb方法的計算特性實現塊與塊之間的數據交換,充分利用計算資源提高計算效率,通過對「 t 」型、 「十」型和「 x 」型分岔管流場的模擬,展示了這種演算法的特徵和優點,以及它所具有的應用前景。
  2. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地20米處開挖了一個用於軌交通的跨度6米,高7 . 5米的地這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌交通使用的地圍巖的應力與位移演變規律進行了有限元數值分析計算,探了地空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地開挖用於軌交通的地狀態等三種不同狀態以及4個平剖線和4個垂直剖線等不同情況,從以幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態不同平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態相同平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地空間的開發利用以及在高層建築物地開挖硐室時的工程設計和工程施工提供參考依據。
  3. " hohensalzburg fortress, reachable via taxi or funicular, overlooks an ornate, wintry city that gives visitors the sense of ' being inside a souvenir snowdome, ' says photographer bob krist.

    「去薩爾茨堡城堡,遊客們可以乘出租車或者纜,從纜上往看,這座華麗的冰雪城市給遊客們一種就像置身於一個晶球中一樣」 ,攝影家鮑博?克里斯特說
  4. Petya must, one would suppose, have known that he was in a wood, with denisovs band of irregulars, a verst from the road ; that he was sitting on a waggon captured from the french ; that there were horses fastened to it ; that under it was sitting the cossack lihatchev sharpening his sabre ; that the big, black blur on the right was the hut, and the red, bright glow below on the left the dying camp - fire ; that the man who had come for the cup was an hussar who was thirsty. but petya knew nothing of all that, and refused to know it

    彼佳原本知他是在樹林里,在傑尼夫的游擊隊里,離大路有一里路,他正坐在從法國人手裡繳獲來的一輛大車上,大車旁邊拴著馬,大車坐著哥薩克利哈喬夫,正幫他磨刀,右邊一團黑影是看林人小屋,右方亮著一團紅的是快燒完了的火堆,來拿茶杯的是一個想喝的驃騎兵但是,他什麼也不知,他也不想知這一切。
  5. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底庫運用后沙變化這一主要矛盾,通過分析研究以往典型時期的沙特點和河演變特點,收集分析河床邊界條件變化資料,小浪底庫運用后沙資料變化,結合現有河整治工程建設情況,總結前人的研究成果,重點研究三門峽庫運用後遊河河勢變化的規律和特點,探小浪底庫運用後遊河勢變化情況,分析預測游蕩性河鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河整治工程建設的規劃和工程安排提供決策參考和依據。
  6. While searching for crystals you have to be aware of falling rocks and boulders, which could potentially kill you

    雖然搜晶你必須知的巖石和大圓石,可以可能地殺你。
  7. To promote river - basin - scale biodiversity conservation, it is important to take effective steps to protect key areas and construct ecological corridors, and to integrate biodiversity conservation into the sustainable development strategies of local social - economic development in the chisui river basin

    提出赤河流域生物多樣性保護應在國家政策框架內,在流域綜合管理理念指導兼顧重點區域保護和生態廊建設,探流域尺度上生物多樣性保護與流域社會經濟協調有序發展的新型管理模式。
  8. Through the analysis on the process of change claim on construction of temporary cofferdam for the downstream leading channel of jinghong hydropower station, the full process of how to make the application for change of construction project based on the change between the actual construction condition and the construction condition during bidding and how to realize the approval of the quotation of contract change is described herein for the construction enterprise, and then some viewpoints on the management and utilization of the relevant talent resources are put forward as well

    摘要工程賠是一項知識和技術面很廣,復雜而又系統性很強的工作,文中通過分析景洪電站游引航圍堰變更賠過程,說明施工單位如何根據實際施工條件和投標時施工條件的改變,提出變更立項申請,實現變更報價審批的過程,同時在人才資源的管理和利用上提出一些見解。
  9. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深治理二期工程施工過程中遇到的堤身在波浪重復荷載作用地基土出現軟化、承載力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深砂被鋪設和海上塑料排板打設施工工藝及專用船機設備,探了一整套帶橡膠阻滑板的沉箱預制施工工藝,確保了抗軟化工程措施的有效實施。
  10. Joining forces with scotland yard and interpol, alex fights his way through a torrent of false leads, impersonators, and foreign agents before he gets close to the heart of the crimes

    在蘇格蘭場和國際刑警的配合,亞歷克斯在潮般的錯誤線中、在不斷與冒名頂替者和外國探員打交的過程中一路過關斬將,查清了罪惡的根源。
分享友人