水力分析 的英文怎麼說
中文拼音 [shuǐlìfēnxī]
水力分析
英文
hydraulic analysis- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 力 : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
- 分 : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
- 析 : Ⅰ動詞1. (分開; 散開) divide; separate 2. (分析) analyse; dissect; resolve Ⅱ名詞(姓氏) a surname
- 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
-
Analysis of the combining ability of amylose content in grains of rice hybrid
水稻雜種後代稻米直鏈澱粉含量的配合力分析In allusion to test roadway in the zhang - luo second class highway and lin - chang freeway, through hydrologic analysis, hydraulic calculation and with the analysis of highway structure, the blue print of setting drainage system, construction technique and back - check experiment are presented
針對張羅二級公路試驗段和臨常一級公路試驗段,進行了水文分析和水力計算,並結合路面結構分析,提出了排水系統的布設方案、施工技術方案和試驗檢測方案。Clough, r. w., " reservoir interaction effect on the dynamic response of arch dams ", proceedings of us - prc bilateral workshop on earthquake engineering. vol. 1, august, 1982, harbin, china
張楚漢、王綦正,緊水灘拱壩動力分析,拱壩技術(中國拱壩情報網刊物) , 1985年三期The deformation of slope caused by change of ground water level was investigated by adopting a fully coupled procedure and the state - dependent dilatant sand model
本文採用完全耦合有效應力分析程序和與狀態相關的剪脹性砂土模型模擬斜坡因地下水位變化而發生的變形。1 sedimentation anyslys of soil under the action of deadweight ; 2 sedimentation anyslys of structure in using ; 3 endogen force anyslys of structure in using ; 4 soil remolding type anyslys ; 5 homogenous flush works anyslys ; 6 anyslys of the structure sedimentation effects of different flushing amount at the same place ; 7 anyslys of the structure sedimentation effects of different flushing places ; 8 anyslys of the structure sedimentation effects of different horizontal flushing places ; 9 anyslys of the structure sedimentation effects of different vertical flushing places ; getting the different between the endogen force of common structure and that of slant structure. the rule of stricture sedimentation and the effect of different soil remolding type were also gained
對掏土糾偏過程做了以下9個方面的分析: 1 、土體在自重作用下的沉降分析; 2 、建築物在使用階段的沉降分析; 3 、建築物在使用階段的內力分析; 4 、土體受擾動類型分析; 5 、均勻沖水施工過程分析; 6 、同一個地方沖水量大小不同對建築物沉降影響分析; 7 、不同沉井沖水對建築物沉降影響分析; 8 、進深不同的土層沖水對建築物沉降影響分析; 9 、不同埋深土體沖水對建築物沉降影響分析。Strip - shape underground structures such as the tunnels and tubes for various uses can be treated as a beam on elastic foundation under earthquake condition , although there exists soil - structure interaction , the foundation soil vibration is dominant in other words , analysis of earthquake response of the soil is essential to this end , simplified models , ( i. e equivalent mass system models based on some equivalence criteria ) are proposed , instead of a general 3 - d continuum model in this study , equivalence criteria are proposed and the simplified models are compared the single - mass - string model is proved to be valid and therefore applied to the analysis of earthquake response of the pearl river immersed tunnel
條裝地下結構如隧道、各種埋設管道等一般可看作彈性地基梁進行靜力及動力分析在地震條件下,結構與土相互作用,但土的振動成為主要因素為分析土的地震響應需把基土這一三維連續體作簡化處理,簡化成為等效多質點模型本文著重探討這種簡化模型的建立方法,推導等效方程,通過幾種簡化體系的分析比較,論證單質點串體系的合理性,並將其應用到廣州黃沙芳村珠江水下隧道工程的地震響應分析,為抗震設計提供依據The dynamic characteristics of wharf piles subjected to lateral load is analyzed, used the dynamics theory. it gives an analysis and research to the functional mode of wharf foundation pile under flood tide torrent
論文對水平荷載下碼頭基樁的動力特性進行分析,用振動力學理論對碼頭施工中的基樁進行動力分析。The second part, have carried on the analysis of real example to the international competitiveness of the steel branch of industry of our country : of our country steel and iron industry basic competitiveness analyse mainly from " key element supply with " whether strength launch, including three respects of manpower, financial resources, material resources, are shown as high - level talent ' s shortage on the quantity of the manpower resources, it is unreasonable that the structure is shown as, personnel ' s whole quality is not high ; the resource respect of financial resources, shown as the capital market hypoplasia, industry ' s financing channel is relatively narrow, studies and uses incompletely about the modem investment and financing management method, the system defect of financing and deterioration of the environment for financing cause profit ability to be low
第二部分,對我國鋼鐵行業的國際競爭力進行了實證分析:我國鋼鐵工業基礎競爭力分析主要從「要素供給」實力方面展開,包括人力、財力、物力資源三個方面,在人力資源的數量上表現為高層次人才短缺,結構上表現為不合理,人員整體素質不高;財力資源方面,表現為資本市場發育不全,產業融資渠道較窄,對現代投融資管理辦法研究和使用不夠,融資體制缺陷和融資環境惡化導致盈利能力低下。物力資源主要表現為礦產資源相對不足,水資源短缺,對交通運輸構成壓力等。In order to resolve the strength problem of 74500dwt bulk carrier on launching way, two aspects of problem are investigated in this report : 1 ) the analysis and calculation of the force act on the hull and the launching way when ship launching ; 2 ) the strength analysis and calculation of bottom structure in forward area during ship launching
為了解決74500噸散貨船下水時船體結構的強度問題,本文主要對兩方面的內容進行了研究: 1 )船舶縱向下水時的受力分析和滑道反力計算: 2 )艉浮時艏部區域底部結構強度分析計算。2. recuperative gas turbine cogeneration with water injection and its thermodynamic analysis recuperative gas turbine cogeneration can reduce exhaust temperature, make use of waste heat and increase efficiency
二、功熱並供回熱注水燃氣輪機及其熱力分析採取回熱和功熱並供可以減小熱機循環的當量排氣溫度或有效利用余熱。In order to take the influence of the internal force from translation into consideration, the design of in - plane buckling of unbraced frames adopted a new second - order elastic method to calculate the structural internal force, e. g. the imaginary horizontal loads method
為考慮變形對內力的影響,對無支撐框架的平面內穩定計算提出採用假想水平荷載法進行二階彈性內力分析,以與國際上鋼結構設計相接軌。The main content of this article includes : " ( l ) the planar non - linear and viscid - elastic static mechanical analysis is used to analyze and calculate the md in service. ( 2 ) the planar nonlinear static mechanical analysis of the stress and deformation is used to analyze the med in banking, which is banked to the height of 140m
主要研究工作有: ( 1 )茅坪溪防護大壩完建和蓄水時的應力和變形的分析計算:對完建和蓄水時壩體的應力和變形進行平面非線性靜力分析計算和平面粘彈性靜力分析計算,對分析計算結果作出結論。Analysis of dilution sewage water capacity in function aera of liaohe river of liaoning province
遼寧省遼河流域水功能區納污能力分析In this paper, the crystal structure of montmorillonite is introduced and the purification methods ( including gravity separation, hydraulic classification, flocculation, centrifugal separation and chemical purification ), the purification principles and purification effectiveness of the methods were summarized
摘要總結了蒙脫石的各種提純方法及其試驗原理和提純分離效果,主要涉及重力選礦、水力分析、絮凝法、離心分離和化學提純。For the practice of the water supply system of three gorges project construction, this study set up a microcosmic hydraulic model. at the same time, it set up the forecast model by the analysis of time series in water consumption both by day and by hour. and finally, the study states an optimal decision mathematics model, which aims at making the least power consumption during the water supply
針對三峽工程施工供水系統的實際,本文建立了供水系統的微觀水力分析模型;同時,採用時間序列分析方法建立了日用水量和時用水量預測模型;最後,建立了以總耗電量為最優目標的優化決策數學模型,並採用動態規劃方法進行模型的尋優計算。The parameters are taken from hydraulic analysis
這些參數來自於水力分析。The hydraulic analysis of pump for suction penetration of bucket foundation
桶基平臺負壓沉貫過程汲水泵機的初步水力分析The bypass line shall be hydraulically sized to accurately measure low flow
旁路管線應該經過水力分析,能夠精確測量低流量。The hydraulic analysis of pump for suction penetration of bucket foundation as well as the pressure head relation between bucket cavity and pump inlet for different water depths and different pump mounting heights are described in this paper
對桶形基礎平臺負壓沉貫過程中汲水泵機進行了初步水力分析,討論了不同水深、不同泵機安裝高度情況下,桶腔和泵機進口之間的壓頭關系。A numerical model has been established which is suitable to cefr steady state and transient simulation. in these cases, a lot of calculation data have been accumulated during the analysis, including pro - process macro file named grid. mac, process control macro file named cal _ control. mac, and post - process fortran file named posdat. f. these data and files are very useful to thermal - hydraulical analysis of cefr and prototype pool - type lmfbr thermal design in the future
建立了一套適合快堆穩態和瞬態模擬的數值模型,積累了大量的計算數據,對整個計算過程作了整理,編制了前處理宏文件grid . mac ,過程數據控制文件cal _ contral . mac和后處理文件posdat . f ,對目前快堆堆內過程的熱工水力分析和今後原型快堆的熱工設計都有非常重要的意義和借鑒價值。分享友人