水力壓輪機 的英文怎麼說

中文拼音 [shuǐlún]
水力壓輪機 英文
hydraulic wheel press
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 壓構詞成分。
  • : Ⅰ名1 (輪子) wheel 2 (像輪子的東西) wheel like object; ring; disc 3 (輪船) steamer; steamboa...
  • : machineengine
  • 輪機 : turbine
  1. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程技術上的復雜性和挑戰性,在左岸電站14臺組國際招標文件已明確了若干重大技術問題的基礎上,在組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:設計頭的確定,負傾角葉片的應用,兩套設計,舍棄初期轉,蝸殼進行試驗等。
  2. On the bridge main engine instrument board, there is main engine cooling water thermometer, lub oil pressure gauge, main engine revolution indicator, main engine emergency shutdown pushbutton, and there is audible and visual alarm device for main engine lub oil low pressure, cooling water high temperature, gear box lub oil low working pressure

    本船駕駛室主儀錶板設有主冷卻溫表、滑油表、主轉速表、主應急停車按鈕,並具有主滑油低、冷卻高溫、齒箱滑油工作低的聲光報警裝置。
  3. When water is pressurized beyond the critical pressure point, steam is produced to drive a turbine

    加被加到超越臨界點的,產生的蒸汽可以驅動一個渦
  4. It is appropriate for measuring end temperature of bearing liner or other works, e. g., push bearing liner of steamer, supporting bearing liner or push bearing liner of electromotor main axis, bearing liner of coal pulverizer, bearing liner of high efficient feed water pump, bearing liner of compression machine and kinds of other objects inpetrochemical plant

    適用於測量軸瓦或其它件的端面溫度,如:汽軸瓦,電主軸支持瓦推瓦,磨煤大瓦和高效給泵軸瓦石油化工廠軸瓦和各種件物體的表面測量。
  5. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    開發生產大型抽蓄能組、大型貫流式組、大功率超臨界火電組、大型空冷汽發電、大型循環硫化床鍋爐、大功率核電站汽和發電、核島設備殼、高蒸發器和主泵等核電一級設備。
  6. In order to guarantee the normal operation of hydroelectric generator unit, it is necessary to make a thorough test of the performance and characteristics of a governor before it is installed or after it is overhauled. to facilitate the test of the governor, a real - time dynamic simulator based on pcc for water turbine governing system was developed. it has three functions : simulating controlled objects ( pressure water conveying system, water turbine, generator and electric grid ), simulating governor " s electro - hydraulic servo system and working as a real - time measuring system for governor

    調速器是發電組一個很重要的自動化調節設備,它由調節器和電液隨動系統組成,在調速器安裝或者大修后都要對其性能和特性進行全面測試,為了方便對調速器的測試,特開發組調速系統實時動態模擬儀,該模擬儀具有三種功能:對調速器調節對象(有系統、、發電和電網)進行模擬、對調速器電液隨動系統與調節對象進行模擬和作為實時測試系統監測調速器的工作是否正常。
  7. After researching the part thermal equipments and systems include heaters, steam leakage and receiving systems, low pressure drain system etc, and computing the efficiency of the systems, find out the better choice of the imported assemblies than the domestic assemblies in parameter and the disfigurements in design and making. based on the above, point out the measure to progress them. according to the analysis, we can get some measures to increase the economical level of the systems and save more energy

    對局部熱設備及熱系統進行分析研究,包括:加熱器設備、漏汽及回收系統、低加疏系統、主、再熱蒸汽系統以及凝汽器等部位;並計算汽本體高、中、低缸效率,藉此著重對汽通流部分進行了剖析,找出國外進口組動、靜葉柵、葉型的選擇比國產組先進性以及國產組在通流部分設計和製造中的諸多缺陷,並且指出了改進的方向,為組提高熱經濟性、節能降耗奠定了理論基礎。
  8. The transient cfd simulation including the spiral case, stay vane, guide vane, runner vane and draft tube at different operation points is studied fitly, then the result of the pressure distribution on runner blade is provided for the runner transient structural simulation by fluid - structure interaction ( fsi ) method

    文中首先對高頭小負荷的渦帶工況下混流式內流場進行非定常cfd計算,得到渦帶工況下葉片表面不同時刻的載荷,並利用流固耦合方法對轉進行結構場瞬態特性計算,分析轉葉片的動應特性。
  9. Numerical prediction of pressure fluctuation within francis turbine for large - eddy simulation

    基於大渦模型脈動的數值預測
  10. On the basis of analysing the principle of hydro - turbine governing system, this paper adopts the module modeling method, divides hydro - turbine governing system into several subsystems like penstock, hydro - turbine, generator, governor, models them separately by mechanism, thus the whole system math model is established

    本文在分析調節系統原理的基礎上,採用模塊化建模方法,把調節系統劃分為系統、、發電、調速器等幾個子系統,分別對其進行了理建模,從而整合起整個系統的數學模型。
  11. The oversimplified models can not reflect the mutual effect of hydraulic system and power system, and they may cause irrational conclusions when they are used in the studies on middle or long term stability, resynchronization of hydro turbine and generator and large - disturbance surge tank system that relate closely to the mutual effect of hydraulic system and power system or the auto governing

    採用這種或電的單方面簡化模型不能準確反映系統與電系統的耦合作用,對于諸如電系統中長期穩定、發電組再同步、調井系統大波動穩定等這些與電耦合和自動調節作用密切相關的問題的研究,可能導致不合理的結論。
  12. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩電站的設計方案,對調節系統,按長引管道復雜引系統、彈性擊、調速器為pid調節規律,在小波動情況下,對包括引道、調井、尾管、、發電、調速器在內的調節系統建立數學模型,並計及引管道摩阻損失,對、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算模擬計算。
  13. The result indicates that the dynamic stress caused by hydraulic pulse at partial load is one of the important reason of the fatigue and cracks of the runner

    結果表明由於脈動引起的轉葉片上的振動交變動應是混流式疲勞破壞的主要原因之一。
  14. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究組間的干擾,本文採用matlab下的simulink作為模擬工具,建立共用有管道、調井、主管的兩臺高頭引調節系統大波動時的模擬模型,引入實際電站的參數,對甩負荷過渡過程進行了模擬計算,分析干擾對電站安全、穩定運行所造成的影響,並提出了一系列減輕干擾的措施。
  15. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型發電組的科學研究。
  16. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型發電組的科學研究。
  17. This new technology changes from the traditional method by which the induced and compressor wheel separately are designed and produced to a new one by which the one - piece compressor is designed. on the basis of this new technology and the optimum blade profile, the performance of both the compressor and the turbocharger is largely improved. through the heating power calculation of the compressor, the analysis of the surge and the block of the compressor, the test - bed performance test of the turbocharger, the matching test of turbocharger and diesel engine, the propulsion test of the turbocharger on plateau condition, it is proved that the newly - designed compressor not only has high efficiency, but also improves the flow distribution in the high efficiency area so that the propulsion line can run through the high efficiency area

    主要內容包括:提出一種全新的技術和概念,這種技術將傳統的導風分開設計、單獨加工改為整體設計、整體加工的單體葉;從增器與柴油計算所得出的基本參數出發,通過對進行熱計算,確定的基本結構參數;再對葉型以及葉廓與葉罩殼的配合間隙進行優化,對新設計的進行喘振和堵塞分析;通過增器平臺性能試驗,驗證了新設計的的性能平得到了較大的提高,達到了提高增器的整體性能平的目的;通過增器與柴油試驗、以及增器用於高原條件下的牽引試驗,驗證了新設計的不但具有高效率,還改善了高效率區的流量分佈,使牽引特性線貫穿高效率區。
  18. In this paper, it is introduced to the influence of cavitation factor, measurement taps, sampling frequency and sampling time on the test result in pressure fluctuation test of the water turbine

    摘要介紹了脈動試驗時空化系數、測量位置及測點、信號采樣頻率及采樣時間等因素對試驗結果的影響。
  19. At same time, author suggests to change cavitation factor to important operation condition during pressure fluctuation test so to avoid producing the phenomenon of cavitation stimulus in the prototype operation

    同時,建議針對的重要運行工況,增加不同空化系數下的脈動試驗,以避免在真運行時可能產生「空化自激」現象,確保原型組的安全運行。
  20. This thesis gives a fundamental quantitative analysis of the cycle of recuperative gas turbine cogeneration with water injection and mainly discusses the influence of water injection ratio and pressure ratio on the specific power and the amount of heating

    本論文對功熱並供回熱注燃氣循環進行了基本定量分析。主要分析了注率和比對比功和供熱量的影響。
分享友人