水力挖土機 的英文怎麼說

中文拼音 [shuǐ]
水力挖土機 英文
hydraulic excavator
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : machineengine
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  • 挖土機 : excavator; navvy; shovelling machine
  1. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除電工程總承包外,還將業務擴展到各類木工程、市政工程、海事工程的設計、施工、械設備和金屬結構製造安裝等,核心競爭進一步得到擴展和增強,形成了年完成石方開15000萬立方米、混凝澆注1500萬立方米、發電組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能
  2. If provided with high pressure pump and water gun, it can make up a hydraulic mechanized earth work unit, used for ground leveling, dredging in rivers and pools, digging, excavation and transportation in small hydraulic engineering, as well as the air defense and underground project in cities

    若與高壓泵,槍配合,組成械化方工程組,就可用作于地平整,河道與池塘的疏浚、鑿開等小型工程的方與輸方,以及城市的防空工程,地下工程。
  3. The sliding resistance mechanism of deformable earth bodies by means of well point drainage lies in lowering the underground water level to reduce the water content of the earth bodies and raise the shear strength, improve the stability of the deformable earth bodies and increase their sliding resistance

    摘要井點降常用於地下位高出開建基面許多或含豐富的體基坑工程中,井點降質變形體中的抗滑作用理在於,通過井點降,降低地下位,使體的含量減少,提高其抗剪強度及變形體的穩定性,增加其抗滑
  4. Meanwhile, it does not need a extra time to be carried out. it can continuously work during the excavation of trenches, so whole work cycle can be reduced. anchors and layers of shot concrete have replaced the traditional steel frames and piles, including concrete piles, steel piles, and they can largely economize construction materials, such as steel and concrete, reduce the amount of soil that would be excavated out, and improve work conditions

    錨桿施工械及設備作業空間小,可為各種地形及場地使用,同時,它不獨占工期,而隨基坑開同步、流進行,節約工期;用錨桿及噴射硅面層代替傳統的鋼支撐和樁(硅樁、鋼板樁) ,能夠大量節省鋼材、硅等建材,減少方開量且能改善施工條件;其次錨桿的預加應可以通過抗拔實驗來獲得。
分享友人