水力摩阻 的英文怎麼說

中文拼音 [shuǐ]
水力摩阻 英文
hydraulic friction
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 摩構詞成分。
  • : 動詞(阻擋; 阻礙) block; hinder; impede; obstruct
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. Secondly, detailedly analyzing reasons inducing these problems, author finds it is that not thinking of the slope of pipeline and the friction in the process of producing water hammer pressure functions, but, thinking of the effect of the slope of pipeline in the process of producing the consequent water hammer calculative continuity function, which results in the inconsequent illogicality in the whole process of producing

    接著,對這些問題存在的原因進行了詳細分析,發現在當前推導擊壓強公式的過程中沒有考慮管道的傾斜度和的影響,而在後面擊計算的連續性方程的推導過程中則考慮了管道的傾斜度,這就導致了在當前連續性方程的整個推導過程中前後矛盾的不合理現象。
  2. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    本文首先對支盤樁的基本原理進行了闡述,對其施工過程以及成型過程進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質文條件,試驗目的、試驗方案、試驗設備以及試驗過程,並對試驗注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸傳遞規律以及支盤和樁側的荷載傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次試驗尚未解決的一些問題,並對支盤樁的前景進行了展望。
  3. A friction drag testing system for the underwater axi - symmetrical vehicle model

    一種軸對稱下航行器模型測試系統
  4. The method is described as follows : the velocity of the moving part and the gas chamber pressure were measured with a dynamic test measurement system ; a dynamic model was built on force analysis of the moving part ; the total kinetic resistance replaced the horizontal friction and water resistance ; then the resistance - velocity relation curves at moving stages were obtained ; with the empirical formula of the gas chamber pressure and the resistance - velocity relation curves, the preliminary dynamic characteristics were analyzed and the structural form and key parameters of an underwater assault rifle were determined

    具體方法為:由動學測量系統測得活動件速度和氣室壓;分析活動件的受,建立動學模型;以運動總代替平方向上的,獲得各運動階段的速度關系曲線;利用氣室壓經驗公式和速度關系曲線,對下突擊步槍進行初步的動學分析,確定其構造型式及主要參數。
  5. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩電站的設計方案,對輪機調節系統,按長引管道復雜引系統、彈性擊、調速器為pid調節規律,在小波動情況下,對包括引道、調壓井、尾管、輪機、發電機、調速器在內的輪機調節系統建立數學模型,並計及引管道水力摩阻損失,對輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  6. Influence of soil body behind the abutment stress distribution and stress carry - over length due to different coefficient of friction is analysised, through the experimental results and the space finite element analysis results of the model, actual measurement results tally with the computing results well. ( 4 ) new type semi - integral abutment bridge is from optimization design of conventional abutment bridge - dashuiting middle bridge. not only bridge at both ends

    分析了不同系數對臺後土體應分佈和應傳遞長度的影響,並對試驗結果和有限元分析進行了對比,實測結果和計算結果吻合良好; ( 4 )將有縫橋-大町中橋優化設計為新型半整體式無縫橋,橋梁兩端均不設伸縮縫,路面也不設任何接縫。
  7. L. ruan, g. gu, x. tian “ numerical simulation for circulating systems and experimental comparison of the closed - loop, self - circulating evaporative cooling of hydro - generators ” 《 electrical engineering 》 vol86, no. 3

    阮琳,顧國彪,田新東「大型蒸發冷卻輪發電機的關鍵問題定子空心導線內兩相流放大倍數的比較及修正建議」 《大電機技術》 , 2004 . 4
  8. The paper introduces experience of selecting hydraulic calculation formula and illustrates calculation of critical velocity of flow ( or critical pipe diameter ) and friction loss of pressure pipe in tailings transport and how to select the formula with examples

    介紹工程實踐中,選用計算公式的體會,對尾礦輸送中臨界流速(或臨界管徑)和壓管道損失的計算以及如何選用公式分別作了舉例說明。
  9. One of the most important one is the piles on the poor geological conditions such as saturated permafrost soil or underneath ice layers, such as : 1. frozen soil beside piles is thawed caused by construction and cement hydrate heat, it need quite time to recover freezing again ; 2. frost heaving sometimes pull up piles ; 3

    凍土地區樁基普遍存在著: 1由於施工、化等造成樁周凍土融化,需相當長時間內才能回凍; 2樁周凍土凍脹對樁的「冷拔」作用往往將樁拉斷; 3樁周凍土融沉引起負
  10. By establishing force equilibrium equations, a mechanical model for calculating the friction on the string is set up, and the analytical formulas for calculating the hook load and wellhead torque when the string is tripped in

    通過建立管柱受平衡方程,推導出平井管柱入井時計算的學模型,分析計算了在穩定和旋轉方式下管柱入井時的大鉤載荷和井口扭矩等重要技術參數的解析公式。
  11. The velocity profiles along the channel section are measured using the laser doppler anemometer. according to the velocity distribution, boundary shear and the coefficient of friction between the flow and rubber panel, is determined

    採用多普勒激光測速儀對過流斷面的流速分佈進行了測量,並根據流速分佈推求出壩面上橡膠板所受的流剪應,和流對橡膠板的系數。
  12. The calculation of hydraulic friction in transient flow and the influence of hydraulic friction to transient

    瞬變流計算及瞬變的影響
  13. In order to know the relationship between gas - content and pipeline ' s pressure drop, the thesis deduces the pressure drop calculating equations based on uniform flow pattern and separating flow pattern. the equations show that pressure drop is made up of three parts, that is, friction resistance effect, gas acceleration effect and the gravity effect. and the research has shown that the gas has little effect on pressure drop. in the horizontal pipeline, the resistance effect must be overmatched the acceleration effect

    為探討加入的氣體對管道壓的影響,本文基於分相流和均相流兩種模型分別推導了三相流管道的壓降公式,表明無論是分相流模型,還是均勻流模型,管道內流體總的壓降是由三項組成的,即擦項、加速項和重項,並得出了加氣對管壓變化不大的結論,所以認為在平管道中,要獲得有效的減,則要使分量的減小效應大於漿體加氣的加速效應。
  14. Special - shaped column frame, its seismic behavior is studied and a new dissipating - seismic - energy structure, r. c. special - shaped column frame with viscoelastic friction damper ( f - ved ) is proposed and studied. a three - dimension solid element model is established for a special - shaped column frame to study its seismic behavior and time history responses under earthquake, some conclusion is drawn about its characteristics of force and displacement under horizontal earthquake action

    為了進一步推廣和擴大異型柱框架結構的應用范圍,本文對異型柱框架結構在平地震作用下的受特點和抗震性能進行了研究,並提出在異型柱框架中設置粘彈性?尼器( viscoelastic - frictiondamper ,簡稱f - ved ) ,對其進行了平地震作用下的減震控制研究。
  15. A series of experiments in a wider range of reynolds number were conducted for the investigation on the spatial and temporal distribution of the low - speed streaks in the near wall region of turbulent open channel flow. for the first time, the relationships between the spacing, the width, the length scale in the streamwise direction and the duration time of low - speed streaks and the reynolds number based on shear velocity were revealed

    光滑區和過渡區對明槽紊流近壁區的帶狀結構進行試驗,測量並分析了帶狀結構的分佈,首次揭示出低速帶間距、寬度、縱向尺度及持續時間等隨雷諾數的變化規律。
  16. The present results indicate that the quantitative description of the non - dimensional mean lateral streak spacing + differs from the results previously published. the spacing + is not a constant value of 100. it becomes larger as the reynolds number in terms of shear velocity increase

    試驗結果表明,低速帶間距的無量綱數+並非為以往一致認為的100左右的常數,而是隨雷諾數的增大而逐漸增大,在光滑區與雷諾數成二次方關系,在過渡區則為線性關系。
  17. Result of study indicates that the momentum input along with the branch flow toward the downstream and the additional friction induced by the mixing of main streams with branch flows should be considered for rational analysis of the local energy loss at junctions

    研究結果表明,正確分析管道匯流口流的局部能量損失機理,必須考慮匯入斷面上支流沿下游主流方向的動量輸入和主支流間相互摻混引起的附加的影響。
  18. Based on the measured data, the change of the friction velocity of turbulent flow and the characteristics of the wall shear stress under different sudden roughnesses and different water depths are analyzed herein

    通過實測資料分析不同糙率突變和不同深的紊流流速變化情況和流的壁面切應的特點。
  19. The paper draws some valuable conclusions : the limited bearing capacity of manual excavation filling pile is much higher than the limited bearing capacity of machine drilled filling pile ; through grouting injection around the pile shaft, the pile bearing capacity can be effectively improved ; proportion of resistance force around the pile side in total load is much larger than that of pressure on the pile tip, and the intensity of resistance force around the pile side is 30 - 50kpa on average

    得出一些有價值的結論:人工挖孔灌注樁的極限承載明顯高於鉆孔灌注樁的極限承載;地下位對樁基承載有顯著影響;利用樁側注漿可有效提高樁的承載;樁側所佔總荷載的比例遠大於樁底壓,樁側土的強度平均值為30 50kpa 。
  20. In the case of computation of invariant flow in the flume, the boundary conditions on bottom and wall of the flumes are managed specially according to the view of wall function method, and the formula about u * is deduced according to the hydraulic characteristic of invariant flow in the flume

    在實驗槽恆定流的計算中,根據壁面函數法的基本原理,對槽底及壁面的邊界條件做了相關的專門處理;並根據實驗槽恆定流的特性,導出了流速計算公式。
分享友人