水墩 的英文怎麼說

中文拼音 [shuǐdūn]
水墩 英文
spray dome
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  1. The dark flat wilderness beyond the churchyard was intersected with dykes and mounds and gates.

    墓地對面那一大片黑壓壓的荒地就是沼地,沼地上堤壩縱橫,橫一個土,豎一道閘。
  2. The stress status of concrete at face of sluice pier in the case of cold wave, pipe cooling and cast - in - place partial sluice pier and so on

    研究了寒潮、管冷卻、整澆部分墻體等情況下閘表面混凝土應力分佈狀況。
  3. The irrepressible bloom, who also had a shrewd suspicion that the old stager went out on a manoeuvre after the counterattraction in the shape of a female, who, however, had disappeared to all intents and purposes, could, by straining, just perceive him, when duly refreshed by his rum puncheon exploit, gazing up at the piers and girders of the loop line, rather out of his depth, as of course it was all radically altered since his last visit and greatly improved

    他定睛一看,才勉強辨認出那個灌了一肚子朗姆酒精神隨之而振的手,正毋寧說是出神地仰望著環行線的陸橋橋和縱梁。當然自從他最後一次踏訪,這里已大大地改建,面目一新了。看不見形影的某人或某些人把男子小便池指給他看,那是衛生委員會為了衛生而到處蓋起來的。
  4. The additional flow is formed by the device of dentoid baffle, and the application of the device of dentoid baffle cooperated with a stilling basin has been investigated by systematic model tests. based on the research results, the hydraulic problems such as the characteristics of hydrodynamic pressure and cavitation on the head of the denotid baffle, the properties of flow under the condition that the device of denotid baffle is used with a stilling basin, the hydraulic computation about a stilling basin, the estimation of energy dissipation and its various affection factors, the mechanism and effect of energy dissipation, and distributions of velocity and pressure and aerating concentration, etc, have been analyzed ; the method and step of hydraulic design of device of denotid baffle by which the additional flow is produced has also been proposed

    文中利用齒設施實現附加射流,對齒設施與消力池聯合應用進行了大量的和系統的模型試驗,分析研究了中低佛勞德數條件下,齒頭的動壓強及空化特性,齒設施與消力池聯合應用時的流態特性,消力池的力計算,消能量的估算及其各種影響因素,消能機理和效果,消力池內的流速、壓強特性,摻氣濃度分佈等力學問題,並提出了實現附加射流齒設施的力設計方法和步驟。
  5. Using the model experiment data, the authors calculate the decreased percentage of water jump length, unit width hydraulic jump volume and the water depth downstream of the jump ; and also calculate the energy dissipation rate of dentoid baffle, it is concluded that the device of dentoid baffle can increase the energy dissipation rate of hydraulic jump theory and decrease the engineering cost

    計算了新增齒設施的消能量,同時計算了新增齒設施的躍后深、躍長度和單寬躍容積減少的百分數。結果表明,採用齒設施,可增進消能作用,並取得顯著的經濟效益,達到附加射流躍理論所預期的效果。
  6. The water current flows over the top of the dentoid baffle to the hydraulic jump as additional momentum. while it is cooperated with a stilling basin, the flowing condition emerged in the basin may be improved greatly and the length and downstream water depth required by the basin can be decreased to a great extent. such an appliance may be also used to solve the problems of insufficiently dissipating water flow energy and aerating flow, which are often faced with those hydraulic engineering constraction as acted by high waterhead, great specific discharge and low froude number

    本文通過齒頂部的擴散舌所形成的附加射流,從上部射入躍,即可改善消力池內的流流態,又可降低第二共軛深,減小躍長度,增進躍消能效果,同時還能解決大單寬、低佛勞德數條件下摻氣和消能不足的問題,試驗證實它是一種安全、經濟的消能工。
  7. Research on peculiarity of wave in the downstream of diffluent piers with low ridge

    低坎分流消能工下游流波動特性研究
  8. The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing

    本廠主要承做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈柱、漢白玉華表、拓荒牛、漢白玉佛像、柱頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石橋、漢白玉石碑、漢白玉盤龍柱、漢白玉欄桿、花崗巖異形、石條、石板、漢白玉奠基石、門、玉器加工、浮雕、華表、龍柱、刻字、硅砂、漢白玉毛料、古建園林(欄板、臺明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓柱、花瓶柱、窗套、門套、風球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。
  9. Despite his stocky frame and his paunch, the hand holding the fountain pen was delicate, thin-fingered.

    他身體實,挺著肚子,然而那隻握著自來筆的手卻異常嬌嫩,纖細。
  10. Abstract : based on the principle of mininmum potential and using rayleigh - ritz method, the geometric non - linear analysis of higher bridge piers was solved in this paper. the new concept of equivalent horizontal force proposed by the author may be casily to calculate the second effect, which was produced due to the vertical forces and resisted by the piers and rubber pad bearings incorporately. the simple formula in this paper are applicable to calculate by hand, understood clearly without computation of successive iteration, higher precision and graspable easily for the disigmer therefore it has the practical significance

    文摘:根據最小勢能原理,用瑞雷-里茲法解決了高橋的幾何非線性分析問題;其次,提出了等效平力的新概念,可以方便地解決橋和板式橡膠支座聯合抵抗垂直力所產生的二次效應問題.筆者提出適合於手算的簡便計算公式,概念明確,勿須迭代運算,精度較高,易為設計人員掌握,因此具有實用價值
  11. What ' s more, we put forward some experienced formulas on the basis of the cortical analysis. the result of the research show that by installing diffluent piers with low ridge, we can eliminate the root of oscillatiny water jump, perfect the energy dissipation effect of water jump, also, we can improve the flow condition of down - stream. the fact that the main flow of down - stream is in the middle, not only effectively lower the speed of the bottom flow in the ridge rear, alleviate the erosion to the river bed, but also avoid the heavy wave resulted from the main flow in the surface, thus improve the surface wave of down - stream obviously. we can work out the body style parameters of diffluent piers with low ridge according to the project flow condition and experience formulas, and then reckon the down - stream surface wave condition for the protected building of the down - stream bank

    研究結果表明:設置低坎分流后,消除了擺動舌擺動的根源,提高了躍的消能效果,改善了下游流流態。下游體的主流在中部,既有效的降低了坎后流底流速,減輕流對河床的沖刷,又避免了主流位於表面導致波浪過大的結果,下游的面波浪明顯得到削減。依據經驗公式,可根據工程流條件設計出低坎分流的體型參數,進而估算出下游沿程的面波浪,為下游岸邊的砌護提供依據。
  12. Construction of the pier of bridge no. str17 near the wsd catchwater

    鄰近於長沙引道為橋編號17興建中間橋的工程
  13. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    斜拉橋主橋設計為鋼筋混凝土圓端型沉井結構,其中詳細介紹了沉井下沉施工技術,同時介紹了下松動控制爆破技術。
  14. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某閘工程在施工過程中擋墻及邊產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對建築物的危害程度,提出了相應的控制措施,較好地保證閘正常運行的功能。
  15. The phenomenon of crack that appears in the hydraulic culvert and sluice is explained separately. the rule is concluded. the mechanism that forms the crack is studied

    工涵閘工程墻和底板混凝土的裂縫現象分別進行了闡述,總結其規律,分析其成因,並研究其開裂機理,為採取相應的工程防裂措施提供理論依據。
  16. It is concl uded that dental baffle - pier can increase energy dissipation rate of stilling b a sin and decrease engineering cost. the obvious economic benefits and the expected effect of additional momentum hydraulic jump theory are achieved

    結果表明:採用齒設施,可增進消力池的消能作用,並取得顯著的經濟效益,達到了附加動量躍理論所預期的效果。
  17. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國電事業也迎來了迅猛發展的大好時機,一批高壩電站正在建設或規劃之中,其泄建築物孔口及頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘結構難以承受如此之大的推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  18. A horizontal demarcation on a scorecard in bridge dividing the honor score from the trick score

    (橋牌)區分將價值最高的牌的得分與數得分分屏的橋牌記分表上的平線
  19. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船的疲勞可靠度研究:為廣東航運規劃設計院的靠船優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  20. The captive had broken off the stalagmite, and upon the stump had placed a stone, wherein he had scooped a shallow hollow to catch the precious drop that fell once in every three minutes with the dreary regularity of a clock - tick

    他把石筍弄斷后,把一塊石頭放在石筍上,鑿出一個淺窩來接每隔三分鐘才滴下來一滴寶貴的
分享友人