水壓機打包 的英文怎麼說

中文拼音 [shuǐbāo]
水壓機打包 英文
hydraulic press packing
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 壓構詞成分。
  • : machineengine
  • : 打量詞(十二個叫一打) dozen
  • 水壓 : water gage; hydraulic pressure (用英寸高度表示的)水壓泵 hydraulic pump; 水壓鍛造 hydraulic forg...
  1. Composed of extruder, head, cooling water tank, first puller, hot stretch able bellow, second puller, pressing device, shaping box, third puller, coiling device and electrical control system, the set has been mainly used in the production of machine used pp packing straps

    組主要由擠出頭、冷卻槽、一次牽引,熱風拉伸烘箱、二次牽引、花裝置、定型箱、三次牽引、卷取裝置及電器控制系統等構成,主要用於pp帶的生產。
  2. He said that the most commonly found dangerous goods inside baggage at hkia were cigarette lighters, perfume or toiletry items, aerosols or compressed gases, fireworks, gas torches, and household items such as adhesives, polishes, bleach and drain cleaner

    他表示,在香港國際場處理的行李內,經常發現的危險品、香或梳妝物品、噴霧罐或縮氣體、煙花、以氣體燃點的點火器和接合劑、擦亮劑、漂白劑和溝渠去污劑等家居用品。
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電組的科學研究。
分享友人