水封水閘 的英文怎麼說

中文拼音 [shuǐfēngshuǐzhá]
水封水閘 英文
waterlock
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. Water seal gate valves

  2. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制(而岸丘橋工程又是首選工程) ,以住湖泊兩頭入流,杜絕污染物進入源地的截污工程; ( 2 )引工程:是截污工程的配套工程,利用下游長蕩湖來補充量,並對3個引工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  3. According to the comparison of many alternatives, the repair scheme of the releasing tunnel adopted the alternative of installing temporary sealing gate to form dry land construction conditions so that the repair scheme has been completed smoothly

    泄空洞修復工程,經多種方案比較,最終優選下安裝臨時門,形成旱地施工條件,完成了檢修工程。
  4. Manufactures industrial tubing and hose, process pipe, fittings, valves, pu mps, filtration, and molded tanks equipped with custom liquid level controls

    -產品有三維偏心硬密蝶閥液控緩閉蝶閥合金鑄鐵海閥核安全級碳鋼閥門和api鑄鐵閥。
  5. Resilient - seated gate valves for water supply and drainage service

    給排用軟密
  6. Rubber gate seals

    橡膠密
  7. Design of gates for diversion tunnels and gate lowering at zipingpu water conservancy project

    紫坪鋪利樞紐工程導流洞門設計及下紀實
  8. We supplied flanged butterfly valves, electric gate valves, resilient seated gate valve and so on, which are valued more than rmb 10 million, to this plant for its first and second stage projects

    公司先後為該污廠一期、二期提供了價值1000多萬的法蘭蝶閥、電動閥、軟密閥等產品。
  9. We supplied flanged butterfly valves, electric gate valves, resilient seated gate valve and so on, which are # 118alued more than rmb 10 million, to this plant for its first and second stage projects

    公司先後為該污廠一期、二期提供了價值1000多萬的法蘭蝶閥、電動閥、軟密閥等產品。
  10. Being been produced upon advanced design and technology at home and abroad and fitted with advanced manual and electric actuators and accordance with the standard of 《 cj / t3006 - 1992 cast iron gate valve for water - supply and sewerage 》, our valves are strong in sealing capability, good in antifriction, easy to mount, flexible for opening and closing and long in service life

    本公司的門系列產品符合cj / t3006 - 1992 《供用鑄鐵門》標準,該產品綜合國內外先進的結構和工藝,並採用國內先進的手、電動控制裝置,使得門具有密性強、耐磨性好、安裝方便、啟閉靈活、壽命長等特點。
分享友人