水工模型 的英文怎麼說
中文拼音 [shuǐgōngmóxíng]
水工模型
英文
hydraulic model水工模型試驗 hydraulic model test- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 模 : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
- 水工 : irrigation works; water conservancy project水工結構 hydro structure; 水工模擬 hydraulic analogue;...
- 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
-
By the calculating of the distorted models and the undistorted model of the circumfluence, the effect of the distortion ration on the flow is analyzed
採用平面二維模型,在數學模型的基礎上,計算變率使河工模型彎道水流在相似性上產生的影響。On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction
本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper
本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。Hydraulic model test of spillway in baiyinhua reservoir
白音花水庫溢洪道水工模型試驗研究The flow dynamic axis in the distorted models is smoother than that in the undistorted model, while the flow horizontal gradient in the distortion model is smaller than that in the undistorted model
在河工模型的條件下,選取不同變態模型,對環流進行了計算,研究了變率對彎道水流的相似的影響,並給出了初步分析。The results of hydraulic resistance and automatic measuring and controlling system presented by this paper have been applied to practical engineering hydraulic model research, forming a characteristics system
本文關於水力阻力和自動測控系統的成果均應用於實際工程水力模型研究,形成了有一定特色的體系。The hydrauli c model of gradual dike - break simulates numerically the 2 - d flow of gradual dike - break waves. it shows the variation of flow field on breach, and the complicated flow characteristic of the propagation, diffraction, reflection and deformation of the dike - break waves. the hydraulic model can realistically simulate the burst process of dike, and computational accuracy is satisfied with the engineering demands
本文建立逐漸潰堤的水力模型首次對二維逐漸潰堤波的流動問題進行了數值研究,揭示了逐漸潰堤過程中潰口處流場的變化情況,以及潰堤波的傳播、繞射、反射及變形的復雜運動特徵,能較好地模擬實際工程中的潰堤失事,模擬比較逼近於真實潰決過程,計算精度可滿足工程要求。Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage
文摘:針對實際工程中的發電引水隧洞運行的各種工況進行了水工模型試驗研究,指明要獲得良好的水流流態,過水建築物各部位結構輪廓的造型應適應水流流線的收縮、流速及壓強的變化;為使引水隧洞在各級引水流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。The researches including discharge capacity, pressare properties, cavitation characteristics at some key positions, hoisting load of the gate, configuration of energy dissipator at the exit dentated - sill, and downstream scouring were performed by hydraulic model tests
藉助系列水工模型試驗對水布埡放空洞的泄流能力、壓力特性及關鍵部位的空化特性、閘門啟閉力、出口鼻坎消能工體型及下游沖刷等進行了較深入的研究、分析。The test on the hydraulic model of the spillway of shangjiao reservoir in lingchuan county
陵川上郊水庫溢共道水工模型的試驗Experimental research on the hydraulic model of tangjiawan reservoir ' s flood - discharge tunnel
唐家灣水庫泄洪洞水工模型試驗研究The main factors which affect the hydraulic characteristics of mhsj are studied by the model test
利用水工模型試驗,研究了影響其水力特性的主要因素。( 5 ) finally, an enlarged emitter model was designed according to hydraulic engineering model principle, which was used for exploring hydraulic similarity between the original model and the enlarged model
( 5 )根據水工模型定律,放大滴頭原型,探索了其與滴頭原型的水力相似性。In view of this problem, this paper curries out serials of hydraulic model test to fine out the mechanism of effect of roughened apron extension upon energy dissipation and erosion control
因此,本論文針對這一問題,進行了一系列水工模型試驗以分析研究海漫加糙對消能防沖影響的機理。This study collected and discussed the results of three hydraulic model tests of long period oscillations in hwa - lien harbor, conducted by center of harbor and marine technology in 1996, 1997 and 2000
摘要本文綜合港灣技術研究中心於1996 、 1997及2000年所執行有關花蓮港港池振蕩的研究計畫水工模型試驗成果部份,進行匯整及討論。Second, this paper expounded the analysis of the universal model by means of the opengl 3d graphics standard. the whole model of a real hydropower station was also provided by this system
其次,本文重點闡述了應用opengl三維圖形標準進行通用模型構建模塊的分析設計,並給出了由本系統繪制的真實水電站輸水系統的整體水工模型圖。Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel
摘要待建的紅石巖水電站水庫屬嚴重淤沙型水庫,通過動床水工模型試驗和有關研究分析發現,其沖沙閘排沙效果不理想,引水隧洞存在進沙嚴重的隱患。Modulus of transverse diffuse simulation based on artificial weural network
二維水質模型橫向擴散系數的人工神經網路模擬Abstract : based on the results of hydraulic model test and remote - control ship model, the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed. the measures of raising navigation discharge level and improving navigation conditions are given
文摘:根據水工模型試驗成果,分析了三峽工程泄洪時壩下游引航道和兩壩間河段(三峽至葛洲壩)的非恆定波流運動特性,結合遙控自航船模試驗對兩壩間的通航水流條件進行了分析評價,並提出了提高通航流量標準、改善通航條件的相應措施。Based on the test result of hydraulic model of a project, this paper analyzes the influences of gate operation during operating period, combined operation of hydro - generation sets and the length of guide wall on navigable flow condition in entrance area, and proposes the operation mode of the hydro - junction for improving navigation flow condition
摘要根據實際工程的水工模型試驗資料,分析樞紐工程運行期的閘門調度、機組組合運行和導航墻長度對口門區通航水流的影響,提出改善通航水流條件的樞紐運行方式。分享友人