水平線穩定 的英文怎麼說

中文拼音 [shuǐpíngxiànwěndìng]
水平線穩定 英文
horizon-seeking stabilization
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 水平線 : horizon; level; horizontal line; waterline水平線跟蹤系統 horizon scanner [tracker]
  • 水平 : 1. (跟水面平行的) horizontal;level2. (達到的高度) standard; level
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. We can use the mm5 model in definite time, definite area weather forecasting. we conclude that : : the moving route of this necw in its developing progress was direct - south along latitude, the cold air is rough, and just this made the rough vertical velocity ; the necw southern moving and conflicting with the west pacification sub - tropical high makes rough jet steam. the plenty south - west warm and wet air made by the jet stream gave the rainstorm demanded vapor ;. the rough vertical velocity by jet stream is a main reason in this rainstorm ; the mm5 model uses four - direction analysis data as its input, this avoids some errors occurred in observe and transfer, thus made the result more useful

    綜合分析認為: ( 1 ) 、這次冷渦在其發生發展過程中,其移動路徑是沿經圈直南壓,攜帶的冷空氣勢力較強,形成槽后較強的垂直運動; ( 2 ) 、西太洋副熱帶高壓偏北位置與東北冷渦南壓形成的急流軸,把源源不斷的西南暖濕氣流輸送到遼西地區,也就是急流軸的左前方位置,為這次暴雨的產生提供了充足的汽來源; ( 3 ) 、低空急流不但為暴雨輸送汽,其造成的較強的垂直環流也是產生強降的一個主要原因; ( 4 ) 、 mm5模式以四維同化資料作為初始場,最大限度地避免了觀測誤差可能造成的積分不,提高了模擬結果的參考價值。
  2. The main contents in the paper are as follows : ( 1 ) the operational principle of the hydraulic automatic tilting gates with connecting lever and rolling wheel were analyzed. using block diagram, the author elaborated on the running course and steady factors of the tilting gate. then the instantaneous running center in the running course of the tilting gate was brought forward, and the trochoid of the center was described

    本文研究的主要內容如下: ( 1 )分析闡述了力自動翻板閘門的工作原理和運轉機理,結合框圖詳細分析說明了翻板閘門的運轉過程及其條件,給出了閘門在運行過程中的瞬心軌跡,分析研究了閘門運動過程中的基本衡方程。
  3. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個和4個垂直剖等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同與垂直剖的應力_ 1 、 _ 2和_ ( xy )對比分佈曲; ( 3 )不同狀態下相同或垂直剖的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  4. We have two up - to - date 10, 000kva tilt - pour fusion furnaces of bfa brown fused alumina with a capacity of 60, 000tons of bfa blocks, one refractory grain production line of 30, 000tons, one abrasive grain production line of 30, 000 tons and one micropower production line of 5, 000tons. the company is capable of making consistent high quality a serial of bfa products due to advanced process, technology and well managed quality control system. that is why the final products find market in the united states, canada, australia germany, italy, japan and

    公司擁有兩臺具有世界先進的10000kva棕剛玉傾倒式冶煉爐,年產棕剛玉塊60000噸,還有年產30000噸制粒生產, 30000噸段砂生產, 5000噸的微粉生產,公司以先進的生產工藝和技術,健全的質量保證體系iso9001取證單位,生產出具有國際先進的性能質量高的棕剛玉系列產品,並遠銷美國加拿大澳大利亞德國義大利日本及香港等國家和地區。
  5. Finally, the method of estimating power customer emission level based on binary linear regression is put forward, which make it a condition that harmonic emission is steady at the point of common coupling. combined with power system thevenin equivalent and customer norton equivalent, according to the principle of least squares method, the voltage that a customer ' s harmonic current begets at the point of common coupling can be estimated in the light of the plural correlation of network parameters

    最後,提出了基於二元性回歸的用戶諧波發射估計方法,該方法在假設公共聯接點諧波發射的情況下,結合系統側戴維南等值與用戶側諾頓等值的電路圖,按照最小二乘法原理,利用電網各參數的復數關系推導關于系統側諧波阻抗的二元性回歸方程,並根據諧波阻抗的估計值求取用戶諧波電流在公共聯四川大學碩士學位論文( 2003 )接點產生的電壓降。
  6. According to whether there are later tectonic activities or not it can be divided into mountain planation surface, lower planation surface and buried planation surface. according to active condition, it can be divided into active surface, dormant surface, exotic surface and defunct surface. taking the base level into consideration, it can be divided into sea - eroded and deposited planation surface, denudated planation surface, snowline planation surface and upper eroded planation surface

    依據夷面形成后是否遭到後期構造變動將夷面分為山地夷面、原地夷面和埋藏夷面;依據夷面的活動狀態可分為活動面、休眠面、外來面和廢止面;依據侵蝕基準面可分為海蝕-堆積夷面、剝蝕夷面、雪面和上部剝蝕夷面;依據基底可分為地帶上的夷面和活動地帶上的夷面;依據氣候帶可分為準原、山麓面和聯合山麓面、雙層面和刻蝕原、凍融山足面和凍融剝夷原。
  7. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大主應力方向與隧道洞軸小角度相交,對隧道圍巖性有利;根據現場應力解除法測試結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  8. A combined neural network and genetic algorithm with solving stability safety of homogeneous slope was proposed and the finite element method is applied to analysis the progressive failure process of the slope and the maximum equilibrium theory, requests out stability safety of homogeneous slope with the smooth arc radius of difference with the difference below the level coordinate of arc peak, utilizing the neural network algorithm to establish slidng the nonlinear mapping relationship between level coordinate of arc radious and arc peak, being adapted the neural network algorithm to look for along the minimal stability safety of homogeneous slope and corresponding arc radious and arc peak

    提出了求解邊坡性安全系數的神經網路與遺傳演算法。該方法採用有限元分析和極限衡理論,求出不同的滑弧半徑和不同的弧頂坐標下的邊坡性安全系數,利用神經網路演算法建立滑弧半徑和弧頂坐標與安全系數之間的非性映射關系,採用遺傳演算法搜索邊坡的最小性安全系數及相應的滑弧半徑和滑弧中心坐標。
  9. By low - cycle and reverse horizontal loading test, their properties including strength property, deformation property and energy property are studied. we study the loading characteristic values ; the property of hysteretic curve and skeleton - frame curves ; the ductility property and stiffness degradation. lastly, based the data got from the test, this paper analyses and value the seismic behavior of every members

    在試驗基礎上,研究了軸心受壓構件的承載力計算和問題;研究了低周反復加載條件下,彎剪構件和整體空心墻板的強度、變形、能量特性;軸壓構件的荷載特徵值;彎剪構件和整體空心墻板的滯回曲、骨架曲、延性等參數;從強度、變形和能耗等方面判別和鑒各構件的抗震性能,對各個構件給出了試驗的結論、評價。
  10. All - solid - state laser is an advantage lamp - house. it has many important applications and potential commercial value in many fields, such as industry, scientific research, military. so it ' s always the research focus of laser field. diode end - pumped solid - state laser has many merits. including high efficiency, long lifetime, high frequency stability, narrow line width, compact configuration, convenient for use et al, which made her a necessity in many high level quantum optics experiments. in this thesis, a series of experiment research was done with regard to blue laser, green laser and infrared laser

    激光二極體端面泵浦的固體激光器具有效率高、譜窄、壽命長、結構簡單、使用方便等優點,特別是採用環行諧振腔內加光學單向器構成的單頻激光器,由於頻率,使其成為許多高量子光學實驗的主要光源。本論文圍繞全固態單頻藍,綠,紅外激光器進行了一系列實驗研究工作。
  11. The geologic condition in mountainous district is complex variable, in different geologic, it is very difficult to find the most economically design scheme. stability of 14 high - cut slopes in guangdong province is analyzed with typical rock mass structure analysis method and stereographic projection method, and with the numerical simulation method udec this paper simulated the excavation and reinforcement courses of the important slopes. some conclutions and suggestions are based the analysis above

    本文結合廣東某省道沿14個高陡巖石邊坡的開挖和支護方案的選擇設計,運用常用的巖體結構分析方法和赤投影方法對邊坡的性進行了分析,採用udec數值模擬方法對一些重點邊坡的開挖支護進行了模擬,得出了以下一些結論: 1 、邊坡支護形式的選擇應遵循「安全綠色、土保持、恢復自然、環保之路」的設計原則。
  12. 7. in order to keep the balance of wheat supply and demand in jiangsu province under the grain yield level at present, 25 * 106mu wheat was the safety line, and 20 * 106 mu wheat was the safety boundary line

    7 .研究分析還認為,要保證江蘇小麥生產的供需衡,單產在目前的,則全省小麥種植面積2500萬畝是其安全保障,進一步下調至2000萬畝則是安全警界,特大豐收年,可基本維持供需衡,災年則需大量進口小麥滿足市場需求。
  13. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基鋪蓋防滲方案,分別按竣工期和蓄運行期的不同工作情況進行了有限元非性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確提供了重要依據。
  14. ( 4 ) on the basis of analysed result and the status quo of huxi bank, computing the slope safety and seepage of bank by fem. the result shows that the tarus quo of huxi bank could not satisfy theslope safety on designed flood lever. after the reinforcement of seepage, the method can not only reduced leakage, debace the soggy but also ameliorate stress fields. lt also can reduce horizontal displacement and certical displacemeng which have disadvantages to bank

    進行堤體防滲加固后,不但可以減少滲漏,降低堤身浸潤,還可以有限度地提高抗滑安全系數,改善堤身及地基的應力場,使在高位作用下產生的不利於堤體安全的位移和豎向位移減小。對在後繼采動中可能造成的防滲材料的破壞進行了校核,結果表明材料是安全的。
  15. Previously the vibration line marker adopts the equipment and materials imported from japan for application. now shenyang liyuan company has successfully developed the self - contained protruding vibration line marker. the product ' s quality has reached the international standard like the same rank of the product around the world through a large amount of application for vibration lines

    振動標過去全採用日本進口設備和材料進行施劃,現在沈陽立元公司成功研製出自走式凸起振動標機,使用該機進行了大規模振動標施工,產品質量,達到國際同類產品的
  16. Breaking off at wuwei on the hai - jin liens, after " ti " mode joined into wuwei 330kv transformer substation, it may bring some problems, such as fundamental frequency excessive voltage, resonance excessive vohage, stability, undercurrent, reactive power compensation, etc. these problem be analyzed. it provides the schemes of design and build wuwei transformer substation and reform the transmission line of hai - jin - jia

    在海金武威開斷, 「 」入武威330kv變電站后可能帶來的如:工頻過電壓、諧振過電壓、、潛供電流、無功補償等問題進行分析,對武威變電站的設計、建設及海金嘉路改進提供方案。
  17. Particularly four following respect problems of main research of this thesis : first, excavating and optimizing of the road bed and the slope protect, on the basis of influence factor analysis and the slope design principle by the expressway of mountain area of limestone, we excavate the model of optimizing after putting forward the road bed which is suitable for the expressway of mountain area of limestone, through employ this optimize model, we can reduce the amount of road bed excavate, thus maximum reducing slope excavate destruction to environment and pollute ; according to limestone mountain area expressway characteristic of the cutting slope, we use the law of finite element and rmr of revision carry on stability analyze and appraise to their side slope ; combine the limestone rock body characteristic of mountain area, we have analyzed the corresponding side slope safeguard procedures

    論文主要研究了以下四方面問題:第一,路基開挖優化。在分析石灰巖山區環境特徵的基礎上,探討了石灰巖山區路設計的原則與方法;在應用有限元數值分析方法對邊坡的開挖性進行分析的基礎上,提出了陡開挖強支護的石灰巖山區高速公路的路基開挖方式,並建立了填挖衡,開挖面積最小的石灰巖山區高速公路的路基開挖量優化模型;結合石灰巖山區巖體特性,探討分析了相應的邊坡防護措施。第二,土石方處理及自然系調治恢復。
  18. On the base of the fujian power system that has the special configuration of " large power generator with small power system " in 2000, constructs power system models of fujian and fujian interconnected with other parts, does a lot of calculation and analysis and simulation, researches the security mechanism and rule of the fujian special power system interconnected with large power system. the above connection can keep security and stability and can make obvious benefits, but when the transmission power reach to excessive quantity the main power grid will increases interconnected flow - in or flow - out exchange power load. the power operation state tended to instability ; the infirmable interconnection make s the damp infirmable

    本文以2000年前後具有「大機組小電網」特殊結構的福建電力系統為背景,建立了福建電力系統及其與外部互聯的數學模型,開展大量的模擬計算分析,研究了「大帆組小電網」電力系統與大容量電力系統互聯偏弱的安全性的機理和規律:前述互聯可以安全運行,取得顯著效益,當傳輸功率達到一量后,主網架增加了送出或吸收互聯交換功率的負載,系統運行狀態向有所下降的方向轉移;聯絡偏弱使阻尼偏弱,聯絡小幅低頻振蕩和大幅低頻振蕩易被激發,聯絡一旦重載斷開,系統高周或低調嚴重。
  19. While the dog is gaiting, the topline remains firm and level

    犬運步時,背保持
  20. The course from rule by people to rule by law had important effects on the wielding power of the party, and it has become the key of successful government of the party, so it has several kinds of significance

    其意義主要有:朝向法治的努力維護了黨的執政路方針的權威性和性;朝向法治的努力推動了黨的執政方式的改進,提高了黨的執政
分享友人