水底開挖 的英文怎麼說

中文拼音 [shuǐdekāi]
水底開挖 英文
underwater excavation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎,除趾板與其下游1 / 9寬范圍以及壩腳除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  2. In addition, side - tracking in old wells can produce residual oil between wells and on structural high, improve pattern arrangement, and control bottom water coning ; it is an effective method for developing minor fault block reservoir with complex lithology and bottom water

    同時,老井側鉆既能掘井間及高部位剩餘油,完善井網,又能有效控制錐進,是復雜小斷塊油藏經濟高效發的措施方法。
  3. We succeeded in crossing hanjing river of zhong - wu gas pipeline project, dawen river of jining branch line of west - east gas pipeline using the technique of trenching in water, controlling negative buoyancy and bottom towing without water interception

    公司採用帶成溝,控制負浮力,管道拖法等施工工藝,在江河不斷流的前提下,成功完成了忠武輸氣管道襄樊支線漢江穿越、西氣東輸冀寧支線大汶河穿越等工程。
  4. The works included 24 bored piles of 2. 5 meters in diameter and 55 meters in depth, 500 meters long underground concrete diaphragm wall of 0. 8 meters thick and 25 meters deep, 450 pre - cast concrete pile of 0. 5 meters in diameter, 12 meters deep soil excavation with multi - layer post - tensioning shoring system, reinforced concrete pile caps and basement slabs

    其工程內容包括了24支直徑2 . 5米,深達55米直入巖層的鉆孔樁,周長500米,深度25米,厚度0 . 8米的地下連續混凝土墻, 450支直徑0 . 5米預制混凝土樁, 12米深,多層平鋼支撐系統,混凝土樁承臺及地庫板結構。
  5. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東道沿路和前警總部地的鐵路隧道,會以鉆隧道方式建造,除了在廣東道政府合署現址附近的工地內地面以便興建新車站及引進隧道鉆機外,需要在廣東道路面進行的工程規模會很少,以便盡量減少對毗鄰環境的影響。
  6. Regarding foundation - pit scope of numerical analysis as a system ; settlement of foundation - pit boundary, displacement of retaining structure and swell of foundation - pit bottom as output of the system ; factors during construction of draining water, earth excavation and retaining structure as input of the system

    為此視基坑數值分析范圍為一個系統,基坑周邊沉降、支護結構位移和坑隆起為系統輸出量,降和支護施工各工況中變化的因素為系統輸入量。
  7. In this article, geotechnical engineering numerical analysis program flac4. 0 is used, working mechanism and main influential factor of composite soil nailing system with step excavation was calculated in detailed, contain distribution and influential factors of axial force and the max axial force in soil nails ; the variation of axial force in anchors ; the variation and influential factor of foundation pit horizontal displacement, ground surface settlement, ground surface horizontal displacement and rebound deformation

    本文採用巖土工程數值分析軟體flac4 . 0 ,對樁錨復合土釘支護在分步下的工作性能和主要影響因素進行了詳細的計算,分析了土釘軸力和最大軸力的分佈規律、影響因素;錨桿軸力的變化規律;基坑平位移、地表沉降、地表平位移和坑隆起的變化規律以及影響因素的敏感程度。
分享友人