水庫水位站 的英文怎麼說

中文拼音 [shuǐshuǐwèizhàn]
水庫水位站 英文
tidal level station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 水位 : stage; water level
  1. Nilometer is widely used in the system of automatic detection and automation in many water supply such as oil industry, chemical industry, metallurgy industry, electric power, irrigation works, reservoir, bulk plant, pumping station, towns water and so on. and it is a important tool in these fields

    、閘計廣泛應用於石油、化工、冶金、電力、利、、油、泵、城市供等領域的自動檢測和控制系統中,是這些領域不可缺少的一種重要工具。
  2. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單和個人不得破壞、侵佔、毀損大壩、堤防、閘、護岸、抽、排渠系等防洪工程和文、通信設施以及防汛備用的器材、物料等。
  3. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電為低閘引式開發。正常蓄1268 . 0m ,最大閘高31m ,容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  4. ( 5 ) taking full of advantage of the ado. net and asp. net technology under the. net platform. it construct a powerful remote control and monitor system and meet the reqirment of the users. in order to achieve real - time control, it design a front environments built on the asp. net structure, from which the system can fulfill the real - time function. due to the characteristic of drain off water pump station remote control and monitor system ( big pump station need high voltage ( 6000v ) and great power ), so now do n ' t adopt the ways that client _ end controls it. in addition, the server - end design a database to manage from which the system could tackle users information and online users log in the form of winform and strengthen the safety of the system

    Net平臺下的ado . net與asp . net技術,發揮兩者的武漢理工大學碩士學論文優勢,構造了功能更強的遠程監控系統,更好的滿足用戶的需要。系統設計中以asp . net架構為前臺環境,實現了客戶端通過ie瀏覽器來實時的監控到排的運行情況,使系統達到了實時監視,但由於大泵機工作電壓高( 6000v )功率大( 100okw )的特點,暫不採用客戶端控制系統。在服務端,設計了數據,並且以winform的形式來管理網路管理員和用戶的信息以及在線用戶的日誌,加強了系統的安全性。
  5. To improve the management both in network and water dispatching and to obtain maximum economic profits, the reservoir operation section of north - west electricity management bureau, the superior of liujiaxia development, decides to set up a system of reservoir automation operation which includes an automatic system of hydrological situation forecasting, a important part of the automation operation system

    洮河紅旗是劉家峽,其主管單西北電管局為提高電網調管理平,獲得最大經濟效益,決定建立調自動化系統,其中情自動測報系統是個重要組成部分。
  6. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態規劃方法中把的整個調度期,按句劃分為t個時段,以的蓄量s或蓄z和入量q作為狀態變量,以量q或電出力n或發電量e作為決策變量,構成一個多階段決策過程,當計劃調度期內各時段的入徑流量已知或可以預報,即入徑流過程可以採用確定性徑流過程時,分別按缺量d最小作為目標函數建立多階段確定性動態規劃數學模型。
  7. It can make local engineers monitor the water timely and use mitigation measure when accident happen timely, and it enhance the degree of automation in many bumping stations

    它可以使現場工程技術人員能夠及時地對所需測量的(閘)進行監視控制。它提高了各種、泵的自動化程度。
  8. Based on the analyses of the relationship between the power generation and the stored energy of multi - year regulating storage reservoirs, a fuzzy multi - objective decision - making model for year - end drawdown level of multi - year regulating storage reservoirs in cascade reservoirs is developed

    摘要在分析多年調節發電量與蓄能量關系的基礎上,建立了確定梯級中多年調節年末消落的模糊多目標決策模型。
  9. With this model, the optimal year - end drawdown level of multi - year regulating storage reservoir and corresponding optimal power generation of every cascade hydropower station for certain weighted factors can be calculated

    求解該模型可得到在給定權重下多年調節的年末及各級相應的最優發電量。
  10. The shiquan hydropower station, which was completed in 1975, is a seasonal regulating hydropower station, 42 kilometers to downstream of xihe river hydropower station. but xihe river hydropower station, which is to be commenced in 2003, is a day regulating hydropower station

    1975年建成的石泉於喜河上游42km ,是一座季調節,而喜河於2003年動工興建,是日調節
  11. The jinping hydroelectric power station, located between from kala to the outlet of the yalong river, is designed as the first huge project of the river, which is rich in hydro logical energy

    錦屏一級於我國能資源「富礦」之一的雅礱江卡拉?江口河段的「龍頭」梯級電,具有良好的補償調節作用。
  12. In light of the problem of the precision of flood forecasting being influenced by the data errors of rainfall and water stage caused by the failures of the communication and the relevant equipments of the gauging stations concerned, the techniques for the automatic hydrologic data collection and transmission system such as data extraction, examination of rationality, error identification, rainfall interpolation and the intelligent error correction are studied based on the analysis on the cause of the errors occurred in the system

    摘要針對流域洪預報和調度中雨量點可能因通信和設備故障引起雨量和數據錯誤,而影響洪預報精度的問題,通過分析文遙測系統雨情信息錯誤的原因,研究文遙測系統雨情數據的提取、合理性檢驗、錯誤識別方法、雨量插補、數據的智能化糾錯處理等技術。
  13. Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter

    龜山滑坡體於寶泉抽蓄能電發電系統下進出口的上方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下及整個電的安全。
  14. Since then, the raingauge station had operated smoothly for many years. the raingauge was relocated late last year to a more exposed location at the ngong ping fresh water service reservoir. with this, the station at ngong ping tea garden completed its historical role after 22 years of service

    昂坪自動雨量于去年底由昂坪茶園遷往較空曠的昂坪食,而於茶園的雨量亦圓滿結束了二十二年的測量,完成了其歷史任務。
  15. When the dongjiang water reached the shenzhen reservoir, it passed through two water mains over the shenzhen river. water is then flow into a reception tank in the muk wu pumping station on hong kong side

    東江抵深圳后,經兩條橫跨深圳河的管,輸入於邊境木湖的接收池,然後再輸往木湖抽
  16. Pak tam chung is at the middle between two large country parks. sai kung visitor centre situated next to the bus terminus provides information about the traditional rituals of villages in sai kung, ecological and geological interest in the area, recreation and scenic areas in the parks, marine parks, high island reservoir and educational plants

    北潭涌由於剛好於兩個公園的中間,所以西貢郊野公園的遊客中心,就設立在北潭涌巴士總的旁邊,中心內設有展覽,介紹西貢傳統的鄉村習俗、附近的生態環境及地理特徵、郊野公園的設施及風景區、海岸公園、萬宜及趣味植物等資料。
  17. Construction work for the two treatment works at tai po and ngau tam mei and for the sham tseng treatment works stage ii was in progress. construction continued of the additional service reservoirs, pumping stations and water supply networks in kowloon west and south, pok fu lam, wan chai, western and central areas on hong kong island, tseung kwan o, sheung shui, tuen mun, tin shui wai and yuen long

    於大埔和牛潭尾的兩座濾廠,以及深井濾廠第二期的建築工程正在進行。在九龍西南部、薄扶林、灣仔、港島中西區、將軍澳、上、屯門、天圍及元朗增建的配、抽和供網路的建造工程繼續進行。
  18. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    洪家渡是烏江梯級中唯一具有多年調節性能的「龍頭」, 2 #塌滑體分佈於壩址下游右岸,恰好於泄洪消能防沖區內,沖坑將塌滑體下部切腳,而且施工期和運行期在其上都布置有公路,因此2 #塌滑體失穩將影響整個的正常運行。
  19. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)是黃河幹流上的一個梯級電,為了減少征地移民損失,經對炳靈(塔坪壩址)尾斷面在劉家峽不同運行方式下的與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽汛限,將電樞紐選址在其電尾內。
  20. Xinqiao 1 ( superscript # ) landslide locates at left bank of the middle of the reservoir of niuniuba hydroelectric station on meigu river, owing to the huge volume, the stability of the landslide is very important to run the reservoir safety

    摘要新橋1 (上標# )滑坡體於美姑河擬建某區中部左岸,由於方量大,所以該滑坡的穩定性對的安全運行有直接影響。
分享友人