水庫水量損失 的英文怎麼說

中文拼音 [shuǐshuǐliángsǔnshī]
水庫水量損失 英文
reservoir water loss
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (減少) decrease; lose 2 (損害) harm; damage 3 [方言] (用尖刻的話挖苦人) speak sarcas...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
  • 損失 : 1. (失去) lose 2. (失去的東西) loss; wastage
  1. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲石河抽蓄能電站二期工程泥沙調度方案,對多個方案的淤積、過機沙、取口附近的泥沙淤積和流流態,進行了沖淤研究。
  2. By studying on different operation mode and different interval flood of longyangxia reservoir, as well as the flood propagation time, pre - alarm scheme is established, which can alarm in order to lower construction losses when flood is in excess of standard

    通過研究龍羊峽的不同運行方式和不同頻率的區間洪,以及傳播時間的研究,得出預警方案,當發生超標準洪時,提前報警使施工降低到最小。
  3. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述電開發在減緩泥沙淤積、延長下游電站壽命、調控流、提高供、改善質、提供清潔能源、減少環境污染等方面對長江上游生態屏障建設的作用。本文研究分析了四川電開發的可持續發展戰略,首先對四川省電力結構現狀進行了分析,指出目前四川電力發展存在的六個主要問題,從優先開發具有良好調節性能的大型電站、綜合利用好資源,盡最大可能減少淹沒,積極推進流域梯級滾動綜合開發,處理好移民關系,減輕對環境的不利影響等六個方面論述了電開發的可持續發展戰略。
  4. By analyzing relevant data of 1980 - 2004, we have gotten the inflow and outflow water distribution of the two reservoirs, and calculated evaporation and seepage quantity

    通過分析1980 - 2004年資料,得出兩的入來源和出分配情況,同時根據蓄變推求兩的蒸發、滲漏
  5. On the one hand, the sediment density current often does a great harm to the reservoir, and causes a big loss of reservoir ' s storage capacity or makes reservoir severe deposition ; on the other hand, sediment outflow by density current is an effective measure to mitigate sedimentation

    異重流(本論文中主要指因含沙的差異而形成的渾異重流)一方面常常給帶來嚴重的危害,加速的淤積和容的;但另一方面它又為排沙提供了一種極為有效的途徑? ?異重流排沙。
  6. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)電站是黃河幹流上的一個梯級電站,為了減少征地移民,經對炳靈電站(塔坪壩址)尾斷面在劉家峽不同運行方式下的位與流關系進行分析研究,在總裝機和年發電基本不變的情況下,充分利用劉家峽汛限位,將電站樞紐選址在其電站尾內。
  7. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少容淤積,加大排沙,會造成在發生洪時期內含沙加大,抽時會有更多的泥沙過機,機組因泥沙而磨
  8. In addition, if the soil average thickness is calculated as 78cm, then the total soil interspaced in the uppers of yangtze river about 1, 000, 000km2 areas adds up to 197, 300, 000, 000m3, but this total soil reservoir carrying capacity ( total interspaced carry capacity ) is decreasing with aggravating of soil erosion

    M計算,長江上游100x曠r2地區土壤孔隙度之和達1973x 」 m 』 ,但土壤的總乙總空隙容)正隨著土壤侵蝕的加劇而嚴重。
分享友人