水庫淤沙量 的英文怎麼說

中文拼音 [shuǐshāliáng]
水庫淤沙量 英文
amount of reservoir de-posits
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 淤沙 : silt
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的回,必須依靠控制上游來、調整入口門位置、加設防堤及提高位等手段,而不能通過調整挖泥槽寬度、位置及數等措施來達到目的。
  2. And study the quantified methodology of self - restraint the source, the soil erosion reducing, the soil nutrient prediction and reservoir mud alluvial prediction, and applies the model count the water conservation benefit in lingchuan county magedang experimental unit in shanxi province

    並分別探討了涵養源、減少土壤侵蝕、減少土壤養分流失及減少積的效益化計算方法,以山西省陵川縣馬屹當小電代燃料試點工程為例進行了土保持效益的實例計算。
  3. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲石河抽蓄能電站二期工程泥調度方案,對多個方案的積損失、過機、取口附近的泥積和流流態,進行了研究。
  4. Firstly, we account for the former made and the sand selected are reasonable by experiments. then we develop the first project carrying the experiment for filling up of 30 years. contrasted with the count, the results have no difference, we carried two experiments under different water levers by the actually facts if engineering work in early days. by the result, we know that the gross of fill up have no difference

    本文從白石模型試驗入手,模型試驗首先通過模型糙率和模型選驗證試驗,說明模型製作和選是合理的;然後開展初設方案30年運用積試驗,並與數模計算對比,基本相同;試驗結合工程初期運用實際情況,進行了兩個不同初期運用位方案的對比試驗,從兩個方案試驗結果看,初期運用的兩個方案積總差別不大,而從效益看,方案二優于方案一。
  5. The paper starts with the reservoir sedimentation, operation mode and catchment runoff characteristics. the study comprises of distributing of runoff and sediment in the catchment, the influence and trend of sedimentation and water storage under different operation mode

    課題研究主要從積狀況、運用方式和流域徑流特徵分析入手,闡述了流域徑流、泥時段分佈,研究了不同運用方式下的主要影響因素及變化趨勢,分析了不同運用方式時積情況和攔蓄
  6. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取工程的布設要考慮工程所處河段的地質文等諸多因素。如該河段上下游容,泄、河道沖刷、積、河床形態、流形態、冰塞、河段上游的支流匯入、洪峰、峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  7. For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn

    容又是調度不可忽視的問題,而容又與的橫、縱斷面、位、深有關,由於泥積、降多少等原因,是動態的,不對正確調度,會在大洪時,造成堤壩漫溢甚至垮壩。
  8. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江口和小浪底初期下遊河道演變、排洪能力變化特點的對比,分析了黃河下游防洪面臨的新形勢:小浪底初期,下遊河道發生沖刷,但艾山以下窄河段沖變化不大,近年來形成的積萎縮的狀況難以很快改觀,游蕩性河段調整劇烈,工程出險機遇增大,河道位流關系中以下部分同流位明顯降低,中以上部分位降低幅度可能會明顯偏小,防洪形勢仍不容樂觀。
  9. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述電開發在減緩泥積、延長下游電站壽命、調控流、提高供、改善質、提供清潔能源、減少環境污染等方面對長江上游生態屏障建設的作用。本文研究分析了四川電開發的可持續發展戰略,首先對四川省電力結構現狀進行了分析,指出目前四川電力發展存在的六個主要問題,從優先開發具有良好調節性能的大型電站、綜合利用好資源,盡最大可能減少淹沒損失,積極推進流域梯級滾動綜合開發,處理好移民關系,減輕對環境的不利影響等六個方面論述了電開發的可持續發展戰略。
  10. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽積入手,分析積特性和區圍墾堤開發利用積灘地的現狀,對防洪安全及工程安全的影響、侵佔大的有效調蓄容、造成同級流位抬升上延、對沿岸及過河建築構成影響、因位抬升致使區周邊灌區地下不暢乃至倒灌而造成土地鹽堿化、對區大積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出區圍墾堤是位抬升的重要原因。
  11. On the one hand, the sediment density current often does a great harm to the reservoir, and causes a big loss of reservoir ' s storage capacity or makes reservoir severe deposition ; on the other hand, sediment outflow by density current is an effective measure to mitigate sedimentation

    異重流(本論文中主要指因含的差異而形成的渾異重流)一方面常常給帶來嚴重的危害,加速積和容的損失;但另一方面它又為提供了一種極為有效的途徑? ?異重流排
  12. The comparison between the experimental data with numerical simulation show that the model have a higher precision in the lateral scouring and sedimentation deformation, time interval quantity of deposition, and output sediment concentration process during sand peak at various cross section and is applied fairly good to practical engineering

    青銅峽的實測資料對模型驗證結果表明:模型在不同斷面橫向沖變形、時段峰期出過程都具有較高的精度,能較好地運用於工程實際。
  13. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底利樞紐復雜的文、地質條件以及龐大的工程規模.該樞紐設計有3條排洞,擔負著泄洪、排、調節徑流和保證進口不被泥堵的任務.根據排洞的運用要求,灌漿帷幕下游排洞洞身段設計為混凝土后張預應力隧洞.通過大的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  14. Traditional irrigation, however, has degraded the soil in many areas, and the reservoirs behind dams can quickly fill up with silt, reducing their storage capacity and depriving downstream farmers of fertile sediments

    然而傳統的灌溉法已對多處地區的土壤造成侵蝕現象,而壩攔截而形成的,也很快就有積,除了降低的蓄,還使得下游農民喪失了肥沃的沉積土。
  15. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少積損失,加大排,會造成在發生洪時期內含加大,抽時會有更多的泥過機,機組因泥而磨損。
分享友人