水庫運用 的英文怎麼說

中文拼音 [shuǐyùnyòng]
水庫運用 英文
reservoir operation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 運用 : utilize; wield; apply; put to use
  1. Operation of sanmenxia reservoir on the control of flood and ice run after xiaolangdi project operated

    小浪底水庫運用初期三門峽防洪分析
  2. The paper also advances some opinion and measures based on runoff characteristic to improve the reservoir operation, and then analyses the corresponding results

    針對流域徑流特點,按照增加調節量,提高供效益,減緩淤積發展的要求,提出了水庫運用方式的改進意見和措施,並對其效果進行了分析。
  3. The experimental results indicated that if the emptying scour was employed in the changma reservoir, the deposition in the reservoir could be efficiently driven out and the reservoir life can be extended

    選擇水庫運用過程中兩個關鍵性的淤積高程,進行對排沙不利的豐豐沙年和枯豐沙年兩個文年7月份沙過程泄空沖刷試驗。
  4. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供系統長期規劃和目前供現狀研究得出,在目前和今後的長時期內長春市供系統的供能力總是大於實際平。這種長期存在的差別對松花江供只意味著減少抽量。但對工程供系統則可挑選行費低的、入量較多的某個,利這種增加的調節容多調節出一些量,以替代行費較高的供工程的供
  5. ( 2 ) theoretical analysis of optimal theory for cascade hydropower station applying decision support system to carry out rational river planning in stepped exploitation includes cascade station arrangement, selecting optimal parameters of indropower station, decision of stepped exploitation order and optimal dispatching for reservoir etc. for uncertain problems, decision support system only supplies an auxiliary decision to the decision maker, not taking the place of decision maker

    ( 2 )電站優化調度的理論分析在梯級開發中應決策支持系統進行合理的梯級規劃,包括梯級的布胃、電站參數的最優選擇、梯級開發順序決策和行的優化調度等問題。在對不確定性問題上,決策支持系統給決策者只是提供輔助決策,而不是替代決策者。
  6. The discussion of some problems on sanmenxia reservoir operation

    近期三門峽水庫運用的幾個問題討論
  7. The method of joint operation and compensation is used in five reservoir ' s operation

    3 、水庫運用方式採了聯合調度及補償調節方式。
  8. Review and prospect of water and sediment adjustment by reservoirs - the research for xiaolangdi operation mode

    兼論小浪底水庫運用方式研究
  9. Characteristics of scoring and deposition of the lower yellow river since operation of xiaolangdi reservoir

    小浪底水庫運用以來黃河下游沖淤調整特點
  10. Test and study on the influence of operational water level of sanmenxia reservoir to scour and fill of the reservoir area

    三門峽水庫運用位對區沖淤影響試驗研究
  11. Thus, it is neccessary to analyze and predict the change of this wandering river section, so that to adopt the suitable counter - measures in advance

    如何分析和預測小浪底水庫運用后游蕩性河段的河勢變化,及早預籌對策,就顯得十分緊迫和必要。
  12. Viewing the overall condition, this numerical value can reflect the fill condition of inner mongolia section since the longyangxia reservoir putting into operation in 1986

    總體看,這一數值可以反映1986年龍羊峽水庫運用以來內蒙古河道的淤積情況。
  13. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用沙變化這一主要矛盾,通過分析研究以往典型時期的沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  14. The main results of this paper are as follows : ( 1 ) the operation chart for individual and associated operation of new and old units, is plotted by using series of multiyears flows and the associated charts is advised to direct the reservoir operation. ( 2 ) on the basis of analysis on the characteristics of hydro - information observation system and flood forecasting system, some key problems in flood operation such as dispatching period of time, decision - making method and so on are studied. ( 3 ) the study and development of flood - dispatching simulation model

    論文取得的研究成果如下: ( 1 )採長系列徑流資料,繪制了新老機組單獨行和聯合行調度圖,通過對比分析,建議採聯合行調度圖來指導行; ( 2 )在對石泉情測報系統和洪預報系統的特點進行分析的基礎上,研究了洪調度中的幾個關鍵問題,如調度時段、決策方法等; ( 3 )洪調度模擬模型研究與開發。
  15. Based on the analyses of the flow and sediment characteristics and evolution trend of the river bed of the fuling reach in the yangtze river before and after the impoundment of the three gorges reservoir, the water level, velocity variation and influenced range in the fuling reach before and fifty years after the operation of the three gorges reservoir with the construction of the fuling dock and four discharge combinations are calculated by using a two - dimensional flow mathematic model

    摘要在分析長江涪陵段的沙特性和三峽前後該河段河床演變趨勢的基礎上,二維流數學模型,分析了4種流量組合情況下在三峽水庫運用前和50年,涪陵港區碼頭修建前後的位、流速變化及其影響范圍。
  16. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進平,該兩項成果已應於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾工程原型觀測數據與資料分析」咨詢項目為行與管理提供了有力保證。
  17. As a key parameter of multi - purpose reservoir operation, flood limit water level plays a critical role in achieving the balance between flood control and economic benefit such as hydropower generation and navigation improvement etc

    汛限位是綜合利行和調度的重要參數之一,它影響著防洪效益和防洪風險。
  18. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底利樞紐復雜的文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  19. Along with 21 centuries putting into effect step by step of strategy is developed greatly in our country the west, and this district will be the west possesses one of district of the development vigour, rapid development of society economy most, and ensures public security that the requirement put forward entirely is also more and more higher to preventing flood, therefore would rather quickening ningmeng course further, the river training is very necessary

    隨著21世紀我國西部大開發戰略的逐步實施,該地區將是西部最具發展活力的地區之一,社會經濟的迅速發展,對防洪保安全提出的要求也越來越高,因此,進一步加快寧蒙河段的治理是十分必要的。本文通過分析黃河寧蒙河段的文泥沙特點、河道特性、以及龍、劉水庫運用后對寧蒙河段的影響,闡述了寧蒙河段河道整治的重要性。
  20. The plane scale of model was 500, vertical scale was 60 and varied ratio was 8 : 33. the contrast trial. utilizing trial of long series and typical flood test have been conducted

    東莊利樞紐渭河下遊河道動床物理模型選定平面比尺為500 ,垂直比尺為60 ,變率為8 . 33 ,在此模型上進行了水庫運用對比試驗、長系列試驗以及典型洪試驗。
分享友人