水文試驗站 的英文怎麼說

中文拼音 [shuǐwénshìyànzhàn]
水文試驗站 英文
hydraulic experimental station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 水文 : hydrology水文測驗 hydrologic survey; 水文成因分析 hydrologicall genetic analysis; 水文地理學 hydr...
  • 試驗 : trial; experiment; test
  1. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程輪機技術上的復雜性和挑戰性,在左岸電14臺機組國際招標件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標件進行分析和投標商對投標件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:輪機設計頭的確定,負傾角葉片輪機的應用,兩套力設計,舍棄初期轉輪,蝸殼進行等。
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    在搜集整理大量工程經的基礎上,結合蓮花在1995年及1996年導流渡汛工程措施設計及工模型,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  3. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv電網接地故障的形式、消弧線圈接地的應用范圍、兩種運行方式供電可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論就是針對以電纜為主的城區10kv電網中性點接地方式的選擇問題進行研究。論首先對10kv電網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變電10kv電網的實際參數來建立數值計算模型,在考慮了電網接地電容電流變化、中性點電阻取值大小、接地點接地電阻值變化等多種影響因素的情況下,對中性點經消弧線圈接地和經小電阻接地方式下電網的過電壓平和接地點短路電流大小進行了數值計算,其計算結果與電科院所作現場進行了比較。
  4. Analyses on the mean daily discharge test in glacial stage in jingle hydrological station

    靜樂冰期日平均流量分析
  5. In order to eliminate the hidden trouble caused by storm runoff erosion, the mechanism of the storm runoff erosion on the slope surface of the yellow river dykes has been studied in this thesis. through the simulation rainfall experiments and field observations, the formation mechanism of storm runoff scouring, rills and sockets have been opened up. meanwhile the possible control measures have been suggested

    為了防治黃河大堤由於暴雨徑流沖刷造成的不安全隱患,本針對黃河大堤上的暴雨徑流侵蝕進行了實地設觀測及室內模擬降雨侵蝕,通過揭示大堤暴雨沖刷過程機理,查清溝、穴(浪窩)等的成因,提出相應的防治對策。
  6. The optimum interpolation method is used to estimate radar measured rainfall which then be applied to topmodel to simulate discharge of shiguanhe catchment during the summer of 1998 in game hubex project. comparison of simulated discharges between radar and rain gauge implements over a 1500 - hour series

    運用雷達聯合少量雨量計方法估測流域面雨量,結合game hubex國際合作項目1998年加強觀測期在史灌河流域獲取的觀測資料和topmodel進行降徑流模擬,並與稠密雨量計網測量的面雨量進行流域出口流量模擬的對比
  7. In the paper, we firstly acknowledge the characteristic of rainfall kinetic energy and runoff energy, current state and the development of erosion dynamic process by consulting a large number of domestic and foreign literature datum. on the basic, we systemically coordinated the eroded datum of runoff plots of soil and water conservation stations at xifeng, tianshui, suide, and chunhua et al

    首先在查閱了大量國內外獻資料,全面了解降雨動能與徑流能量的特性及侵蝕動力過程等方面的研究現狀及最新進展的基礎上,系統整理了西峰、天、綏德及淳化泥河溝等土保持的徑流場侵蝕資料。
  8. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型,比較分析各防洪整治方案下潼南河段流條件的變化,及其對上游防洪、河道、大橋、電、航運、河勢的影響,提出合理可行的工程方案
  9. Based on the vibration test in yantan hydropower house, in this paper the author adopt les method which belong to three dimensions unsteady turbulent flow numerical analysis to simulate vibration resource characteristics of hydrogenerator set, a harmonic vibration model of powerhouse substructure is put forward to carry out firstly a precise modal analysis and dynamic response analysis for generator floor. the numerical calculation results agree well with the surveyed data in situ

    結合巖灘廠房振動的研究,採用非定常湍流數值分析的大渦模擬方法進行混流機組力振動振源模擬;提出一種廠房下部結構簡諧振動模型,首次進行了發電機層樓板結構的精確模態分析和力激振荷載下的動力響應分析,各項計算結果與實測數據吻合良好。
  10. In the topic 1, utilizing the natural lysimeters and drainage region in wudaogou station, based on expriment and imitation methods, frist the hydrology effect of drainage has been analyzed, and then the index of water logged farm drainage and suitable ground water level have been provided. on the theory of darcy rule and farm hydrodynamics, the standard and pattern and empirical formula of farm drainage system have been presented as well, and provide scientifically foundation for drainage planning

    在農田排技術研究中,利用五道溝實地中蒸滲儀和排區,採用法和動態模擬法,分析了排工程的效應,提出了農田排漬標準和作物適宜的地下位埋深,採用達西定律和農田動力學原理,提出了農田排系統的規格、布置方式及經公式,為排工程規劃提供依據。
  11. The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward

    中介紹了2個電口排沙底孔的泥沙模型情況,提出了一種新的「格柵式排沙廊道排沙底孔」的組合型式(簡稱格柵式排沙底孔) ,取得了理想的排沙效果,較好地解決了工程實際問題。
  12. The main question of the thesis is developed dqlon fieldbus control system with lonworks fieldbus technology the dqlon intellect module were used and carried successfully in xing 9 sewage treatment engineering

    所研製的dqlon智能模塊在採油四廠杏九污處理工程進行,並且運行投產成功。
  13. Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value

    對國內外眾多電機組增容改造資料進行了認真研究和實地考察;通過對力發電機組增容改造技術的研究,結合葛洲壩電實際情況提出了葛洲壩電機組增容改造的基本途徑;針對葛洲壩電機組改造方案,進行了大量的,認真分析了數據,用結果充分證明了葛洲壩電機組增容改造的必要性和可行性;本還就該工程項目管理的必要性、組織結構、管理方法進行了闡述,並對該項目進行了項目評估。
  14. It can be used in the larger scale calculation in next research. the main achievements of this project were concluded as follows : 1. substantiation of complementary relationship for area evapotranspiration based on nearly 30 years data from 432 weather stations and 512 hydrological stations in china, using means of water balance, the secular annual mean actual evapotranspiration was established

    為今後進行大范圍實際蒸散發研究提供了有益的嘗,本主要完成以下幾個方面工作: 1區域蒸散互補關系的證利用432個氣象和512個全國共計944個氣象、近30年的氣象、資料,採用量平衡法,計算流域多年平均實際蒸散發量。
  15. The field experiment study for cotton and corn was conducted in xiaobakou irrigation experiment station in minqin country, gansu province. the main results are as follows : ( 1 ) applying the theory of soil - water flow system in ground water, the mechanism of water - saving and product - enhancing for drip irrigation under mulch were analysised

    以棉花和玉米為研究對象,在甘肅民勤小壩口灌溉對此進行了系統的田間研究,得出以下主要結論: ( 1 )應用地下土壤流動系統理論,分析了膜下滴灌節增產的機理。
  16. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化研究;大壩基礎深層抗滑穩定研究;三峽電口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  17. A series of hydraulic model experiments of water flow, head losses and flow state in reservoir under various conditions are carried out for the design of the dashuzi pumped - storage plant

    摘要本結合大樹子抽蓄能下庫進出任務,對側式短進出口在不同工況下的流速分佈、頭損失、庫區流態等流特性進行了力模型研究。
  18. The method was applied to measure the hydraulic losses of inlet and outlet conduit of bulb tubular pump system of the pumping station respectively

    採用本的方法對某泵前置燈泡和後置燈泡貫流泵的進、出流道分別進行了模型,測了流道力損失。
  19. To serve the optimum hydraulic design for a large pumping station, a new method to separate inlet and outlet conduit from tubular pump system was put forward for measuring their hydraulic baa, by the way to design a special measuring system

    摘要為了配合某大型泵貫流泵裝置的優化力設計研究工作,本提出了設計專用模型裝置,將貫流泵裝置進流道和出流道從泵裝置模型中分離出來分別進行模型力損失測的方法。
  20. Based on the hydraulic model test of zhaojiabang pumping station in shanghai, a much more thorough study was made on the hydraulic and sediment deposition characteristics in this paper

    結合上海市肇嘉浜雨污合建式泵力模型研究課題,對大型多機組泵圓形集池的力特性和泥沙淤積特性進行了較全面的研究。
分享友人