水流變形 的英文怎麼說

中文拼音 [shuǐliúbiànxíng]
水流變形 英文
flow distortion
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 水流 : 1. (江河) rivers; streams; waters2. (流動的水) current; water flow; fluent; flow; [水文] stream current
  1. Groyne is a common measure used in channel improvement. it will give rise to serious consequence if the design of groyne is improper. to go deep into study of the variation of flow feature in river due to building groyne is extremely necessary

    丁壩是航道整治中常見的工程措施之一,但若設計失當,可能帶來許多嚴重後果,對丁壩所成的許多條件化開展深入研究是十分必要的。
  2. By infrared spectrum study, the limonite ( feooh nh2o ) can be considered the main colorating mineral in the yellow and red jadeite, and the hematite is another colorating mineral in the red jadeite. the difference of color tone is due to the n value in the molecular formula feooh nh2o and the content of crystal water and adsorbent water. the iron ion came from the effloresced and eroded rocks, and formed fe ( oh ) 3 colloid reacted with the surface water

    周圍礦床的風化蝕為表生提供了鐵質,成弱酸性的含fe ( oh ) _ 3膠體的溶液,表生經翡翠礦石時, fe ( oh ) _ 3膠體附著在巖石的表面,經過脫結晶和吸附,成褐鐵礦膠體,褐鐵礦膠體沿裂隙或鬆散的礦物顆粒進入翡翠巖石中,逐漸累積沉澱,成次生色層。
  3. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游洪幅較大等環境條件下,貫電站副廠房設置自然通風採光天井的空間條件及其技術性和經濟性,討論了天井布置原則和空間尺度與態處理,給出設計實例並初步評價了天井通風採光的效果。
  4. Black paradise fish inhabits in sluggish, swampy of water bodies, with elliptical and laterally compressed body, black to grayish body ; during spawning season, males exhibit a dark colour ; males have a maximum size about 12cm while females about 8cm

    它主要生長在緩慢的沼澤域,身體呈橢圓,側端扁平,體色偏黑,在繁殖時體色會得深黑成熟的公魚可長至12公分左右,母魚則長8公分左右。
  5. The characteristics of high pressure gyratory sprayed pumping discusses is presented, which is applicable in wide range of scope and ground layers, convenient for construction, long durability, wide source of materials. mechanism for subgrade strengthening : complex foundation of cement solid and earth between piles was formed by pulsant load of flowing pressure and spraying flow, water wallop, cavitation phenomenon, water wedge effect, extrusion force and air flow agitation etc so as to enhance foundation bearing force and reduce settlement and deformation

    高壓旋噴注漿技術具有適用范圍、適用地層較廣,施工方便,耐久性好,材料廣闊等特點;其加固地基機理主要是通過動壓、噴射的脈動負荷、塊的沖擊力、空穴現象、楔效應、擠壓力、氣攪動等效應泥固結體與樁間土的復合地基,從而提高地基承載力,減少沉降
  6. The improved scheme can ensure the south branch to be open to navigation and the flow here not to be broken in low water seasons, and it will have active effect on protecting the south branch and fuyuan town. this study is an attempt of applying three - dimensional mathematical model in analogue calculation and analysis of flow, sediment and riverbed movements in a long river reach. it is very important for the future thorough research, and has great significance for promoting the application of the three - dimensional model to resolve

    本研究是三維數學模型對較長河段、泥沙、河床運動模擬計算分析的一次嘗試,其對今後進一步深入研究和應用三維模型解決工程實際問題,完善模擬方法、提高模擬平,真正發揮數學模型其省時、省力、靈活方便和模擬細膩等在研究沙運動規律和河床等方面研究中優勢具有重要的意義。
  7. Woven wire mesh series : stainless steel wire mesh, brass wire mesh, copper wire mesh, phosphor bronze wire mesh, barbecue grill mesh, crimped wire mesh, low carbon steel wire mesh, mild steel wire mesh, black wire cloth, window screening netting, vibrating sieving mesh, filter for gas and liquid, conveyer belt, chain link fence, galvanized square wire mesh, hexagonal wire mesh

    此網帶由雙股右螺旋或由雙股左螺旋盤條與一根串條連接而成,網帶拼接方便,網眼一般小於單股加強編織的網眼,編織牢固,不易,維修方便。能用於高溫的自動線,輸送重物,機械工業上零件的熱處理,各種較大物品的烘乾。
  8. The hydrauli c model of gradual dike - break simulates numerically the 2 - d flow of gradual dike - break waves. it shows the variation of flow field on breach, and the complicated flow characteristic of the propagation, diffraction, reflection and deformation of the dike - break waves. the hydraulic model can realistically simulate the burst process of dike, and computational accuracy is satisfied with the engineering demands

    本文建立逐漸潰堤的力模型首次對二維逐漸潰堤波的動問題進行了數值研究,揭示了逐漸潰堤過程中潰口處場的化情況,以及潰堤波的傳播、繞射、反射及的復雜運動特徵,能較好地模擬實際工程中的潰堤失事,模擬比較逼近於真實潰決過程,計算精度可滿足工程要求。
  9. The computer speed is speeded up. the numerical results of the present models are in agreement with the theoretical solution and those of physical models. systematical numerical tests show that the present models can reasonably simulate the wave transformation, such as shoaling, refraction, diffraction, reflection, effect of currents and so on

    比較詳細的模型驗證與應用表明,模型的數值模擬結果與解析解、物模實驗值吻合良好;可以較好地模擬波浪傳播過程中的淺、折射、繞射和反射等多種現象;能正確合理地反映對波浪傳播的影響。
  10. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發電引隧洞運行的各種工況進行了工模型試驗研究,指明要獲得良好的態,過建築物各部位結構輪廓的造型應適應線的收縮、速及壓強的化;為使引隧洞在各級引量下能安全可靠地運行,需慎重確定洞內消能工的體和尺寸。
  11. The dispersibility as well as seepage distortion and salt transference under long - term seepage condition of soil samples obtained from the clay core wall in xijiao and sanping reservoirs were studied by physical and chemical properties of soil and composition of clay mineral and the tests for identification of dispersive clay soils which included double - hydrometer test, pinhole test, crumb test, tests to defermine salt content of pore water and percentage of exchangeable sodium

    摘要應用碎塊、針孔、雙比重計、孔隙可溶鹽和交換性鈉百分比等五種試驗方法,結合物理化學性質和礦物成分分析,對西郊、三坪兩庫大壩心墻土樣進行了多種方案的分散性試驗及長期滲條件下的滲透試驗和鹽分運移試驗。
  12. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期澆築面板、分期蓄布埡高面板堆石壩,選用合適的模型正確模擬堆石體的特性,以便採用合適的施工程序減小面板應力具有重要意義。
  13. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv電網接地故障的式、消弧線圈接地的應用范圍、兩種運行方式供電可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以電纜為主的城區10kv電網中性點接地方式的選擇問題進行研究。論文首先對10kv電網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門電站10kv電網的實際參數來建立數值計算模型,在考慮了電網接地電容電化、中性點電阻取值大小、接地點接地電阻值化等多種影響因素的情況下,對中性點經消弧線圈接地和經小電阻接地方式下電網的過電壓平和接地點短路電大小進行了數值計算,其計算結果與電科院所作現場試驗進行了比較。
  14. Notice the hydraulic jump that forms, and see how it changes as you vary the jet velocity, flux, and dish depth ( horizontal dish )

    注意躍的成,當你改噴射的速度,量以及盤的深度(平的盤)的時候,看看它是怎麼化的。
  15. In addition, the microcosmic stream, especially suspended load ( mainly suspended soils and sands ) reflected on the characteristic of transported sands " streams, and always silt up and form shoal in the place where the stream velocity is lower and river steam return easy

    河道的微觀,特別是懸浮物(主要是懸浮泥沙)反映輸沙淤積特性,總是在速緩慢、易迴的地方淤積、成新生沙洲,為正在發生及將來發生的河道淤積和演打下基礎。
  16. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪組成、泥沙演、河道湖泊系分佈特點以及河道湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地化,採用有限體積法建立了湖泊二維力學計算模型預測疏浚工程實施后的位、量、化,為河道、航道港口整治、河道疏浚清淤等工程決策與實施提供了可靠理論依據。
  17. The velocity of flood propagation was great and flood deformation was slightly when flood peak increase to bank full discharge. as the discharge increased to 2 - 2. 5 times of bank full discharge the velocity reduced to the lowest value and the greatest flood deformation occurred

    當洪峰量接近平灘量時洪傳播速度最快,洪峰最小,當洪峰量約是平灘量的2 2 . 5倍時,洪傳播速度最慢,洪最大。
  18. The formula of calculating flood peak at downstream stations according to upstream flood peak at hydrometer station was proposed in this research. in the formula river boundary and flood type factors etc. were main factors and the formula can reflect the impacting factors of flood deformation

    報告給出了由上游文站洪峰量計算下游站洪峰量的計算公式,公式包含有河道條件和洪峰峰型因子,較全面地反映了影響洪的因素。
  19. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河、地特點,利用塊體粒徑與起動速的關系,提出塊體穩定重量與起動速高次方成正比的概念,速50的增長可能導致塊體穩定重量接近40倍的化;通過二維槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  20. By lowering blood fat, blood thickness and softening vessels, improving rheological flow forms, the function of impaired organ will be improved and the blood pressure will be also maintained at a permanent normal level, to achieve ultimate permanent hypertension treatment

    通過降低血脂、血粘和軟化血管,改善血態,使受損的器官功能得到改善,血壓也就會永久性的維持在正常平,最終實現徹底根治高血壓的目的。
分享友人