水線長度 的英文怎麼說

中文拼音 [shuǐxiànzhǎng]
水線長度 英文
length at waterline
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 水線 : waterline; shoreline水線標志牌 subaqueous cable marker; 水線面 water plane; 水線漆 topping paint;...
  • 長度 : length; longitude; size; extent; footage
  1. The effect of groyne length and layout on water surface is analyzed in the paper. based on the results of simulation and experiment, the local energy loss of the flow due to the groyne is studied. consequently the surface variation and height of damming are also analyzed

    論文分析了丁壩與布置對的影響,根據流場、紊動場模擬結果和實驗結果研abstract究丁壩造成的流局部能量損失,並對面變化和丁壩奎進行了分析。
  2. The welding technology of francis turbine runners is optimized from the view of subsection welding and local heating by numerical simulation. the result shows that welding residual tensile stress appears in the weld and its area nearby, and peak stress appears in the dangerous area of blades after practising quondam welding technology ; welding residual tensile peak stress in the dangerous area of blades can be decreased by welding both ends earlier and then welding middle section later during subsection welding, and decreasing effect on welding residual stress of the subsection welding is related to the weld length of blade outlets and welding direction of each subsection ; decreasing effect on residual stress of the local heating is direct proportional to heating time, heating temperature, heating area, and inversely proportional to cooling area, and welding residual tensile peak stress in the dangerous area is decreasing trend earlier, and then increasing trend later with heated location increased

    本文利用數值模擬手段對轉輪的焊接工藝從分段焊和局部加熱兩個方面進行了優化,結果表明:採用普通工藝焊接時,葉片焊后殘余拉應力出現在焊縫及其附近區域,並且在葉片出邊的熔合附近(危險區域)出現了峰值;在採用優化的分段焊時,先焊兩端后焊中間的方法可以降低葉片危險區域的焊接殘余拉應力峰值,降低效果與葉片出邊焊段、焊縫各段的焊接方向有關;局部加熱法降低轉輪危險區域殘余應力的效果主要與加熱時間、加熱溫以及加熱面積成正比,與冷卻面積成反比,並且危險區域的殘余應力隨加熱區域的增大呈先降低后升高的趨勢。
  3. But now it ' s urgent to adopt new methods for calculating the head loss of regional drainage due to some factors such as long length, large flow quantity and probable strong topographic change

    由於存在管、流量大以及區域地形變化幅可能較大等因素,建設區域排系統需要採用新的方法較為準確地計算頭損失。
  4. Function of compensation lead cable which used for thermocouple is to prolong cold end of thermocouple, and composing system for measuring temperature by connecting with temperature meter. adopting high - quality import teflon insulation and sheath advanced technologic production chain, makes products owning good performance of resistance to high low temperature acidproof anticorrosive antiaging long - term using in oil, etc. normal working temperature is - 40 275

    熱電偶用補償導電纜的作用是來延伸熱電偶的冷端,與測溫儀連接構成測溫系統,產品選用進口優質聚四氟乙烯絕緣和護套,並採用先進擠出設備新工藝流生產,具有耐高溫低溫,耐酸堿,防腐,耐老化等優異性能,可浸入油期使用,正常工作溫- 40 275 。
  5. Therefore we should choose length, width, height and interval of frames according to water height and demand of velocity. the results can be used for reference to the design of bank protection works

    隨著l h 、 b h 、 a h的增加,框架群后對應點垂平均流速的減速率也逐漸增加,保護區、寬也不斷增加,因此,應根據不同的深和減速率要求拋投相應、寬、高、間距的框架群。
  6. For a x - directed line current with lengh much smaller than a wave length, the e - field pattern on coordinate planes in 3 - d space in the region from much smaller than line length to one or two wave length, the synthesized pattern by summation of the field of many line segments of hertz dipoles is independent of the number of segments, i. e. same field as a single hertz dipole

    平面上三角形甚小於波電流為例,分割為若干小段之赫芝偶極所加總合成在三空間任意座標平面上距離從甚大於到一兩個波區域之電場場型與分割小段數量無關,即等同於一單一赫芝偶極之場型。
  7. This research concludes that technology resistance, market progression, and environment influence are the three major forces that affect the difusion of product appearance and dominate, respectively, the development of stylability curve in terms of altitude change, lateral extension, and overall performance and the starting point of an emerging curve

    本研究發現技術限制力、市場發展力和環境影響力,為影響造形擴散之三大主要影響作用力,分別影響造形力曲發展之垂直高變化、延伸,以及整體曲之起伏和新曲之起始位置。
  8. It shows that the method suggested in the paper is simple, applicable for engineering and has good precision. on the bases of the formulas deduced, and combining with relative test datas, it studies in the paper several factors influencing the bearing performance of the simple beams, such as shape of the external tendons, the equal moment segment length, span - to - depth ratio of the beam, valid initial prestress of the external tendons, area of the internal tension reinforcement, strength of the concrete, vertical distance between

    在公式推導的基礎上,結合相關試驗資料,研究了體外筋的形狀、等彎矩區、梁跨高比、有效張拉預應力、體內受拉筋配筋率、混凝土強、錨固點到樑上邊緣在垂直方向上的距離、體外預應力筋平段(雙折型體外筋的情況)以及荷載類型等對體外預應力混凝土簡支梁受力性能的影響。
  9. On the base of analysing the ordinary design methods, aiming to the minimum annual cost or investment, taking the pipe length and water pump lift as decision - making variables, the linear programming models are presented to optimize the diameters of main network and field network

    論文首先分析了常規微灌系統規劃設計方法,在此基礎上,以年費用或投資最小為目標,用離散管徑方法,以管段泵揚程為決策變量,分別建立了泵加壓式和自壓式干管管網優化設計以及田間管網優化設計性規劃模型。
  10. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得出適合本段工程的最佳施工路,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、平旋噴、臺階及crd工法施工的c 、 d部相錯進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施工方案的三維有限元動態施工模擬,得出了較優的施工方案,並利用施工后的地表沉降槽曲,對sk3 + 355斷面處隧道上方的煤氣管的安全性進行了分析,得出了利用此施工方案施工不會造成此處煤氣管破壞的結論。
  11. Specification for netting yarns : determination of change in length after immersion in water

    結網規范:變化測定
  12. In the process of threshing, the significance of factors, which influence threshing performance, not only include some certain factors such as feed quantity, cylinder rotary speed, distance between cylinder and concave, thresher concave radian but also include some uncertain factors such as the crop ' s variety, water content and the proportion of cereal straw. for this reason, the seed - husking plant is system with a character of uncertain, multi - input - output and complex nonlinear

    脫粒裝置的工作過程極為復雜,影響脫粒性能的因素很多,除了喂入量、滾筒轉速、凹板與入口間隙等確定性因素外,還有作物品種、作物含率以及穀草比等一些不確定性因素,因此脫粒裝置是一個具有不確定性、多輸入多輸出的復雜非性系統。
  13. Finally, taking the panjiakou reservoir in the haihe river basin in china as an example, the paper analysis the reasonable adjustment scheme of the limited level of the reservoir during the flood season according to the design flood, the flood forecasting, the flood control operation under forecasting, the flood control standard of upstream and downstream of the reservoir, the immigrants range, and the benefits and the risk of the reservoir in a long period of the operation simulation

    最後以海河流域潘家口庫為分析實例,從設計洪、預報預泄、洪預報調方式、上下游防洪設計標準、上游移民淹沒及土地退賠期運行的風險和效益等多個方面分析論證了庫汛限位的合理調整方案。
  14. In addition, according to difference between the top - level materials and the low - level materials, the model of leveling the mat erial flow is set up separately. furthermore, the model of leveling the material flow with constrain of resource supplying limit. in the model of optimization on the workload, the mutual effect of line balancing and scheduling is analyzed by an instance ; the factors of line balancing, scheduling, and system parameters, such as workstation length, the launch rate are taken into considered

    在基於負荷的多目標協同優化模型中,通過實例分析了平衡設計與排產設計對系統目標的交互影響,綜合了流的平衡設計和排產設計與工作站、產品投放速率等系統參數對系統的影響來優化混合流生產系統設計,建立了在2種工作站類型與2種假設情形構成的4種組合下的優化模型,給出了一個優化實例。
  15. Owing to lack of auotmatic separation of led in our country, we borrow ideas from other countries and design a suit of equipment of automatic dection and separation of led. the equipment consists of several parts : led transportation setup ( disc libration setup, line libration setup ), equidistant receving setup, detecting system and automatic separation of led. the equipment achieve automatic separation of led and pipelining. the research lay stress on machanical structural design and order action control which achieve automation separation by using pc and plc

    可完成led波和亮的在檢測、自動處理和自動分選,實現了led在分譜檢測與自動分選的流作業。自動分選的機械結構設計、動作實現設計和順序動作控制是本論文的重點。自動分選的實現是通過pc與plc的結合完成對plc的順序控制。
  16. Narrowband watermarking information is spread into wideband pseudo - random code before being embedded by modifying the scale of the distance between vertexes in two - dimensional engineering graphics

    該方案先將待嵌入的窄頻帶的浮印信號擴頻為寬頻帶的偽隨機序列,然後再以偽隨機序列為依據對二維工程圖中直實體的作相應的修改。
  17. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  18. In the rotor design, it makes a detailed calculation for all the geometry feature parameters including geometry dimensions, contact line length, blowhole area and flow cross - section area and the thermodynamic feature parameters such as cooling capacity, shaft power and so on

    在轉子設計方面,對全部幾何特性參數,包括幾何尺寸、接觸、泄漏三角形面積和面積利用系數等以及包括製冷量、軸功率等冷機組熱力特性參數進行了詳細計算。
  19. The first part mainly introduces the gis concept and contents of gis, the comparison between the related software and gis, the present condition and development trend of gis etc, then introduced how to use the gis technique in a specific way such as using the method of " the half - automatic to follow " to turn the map into arithmetic figure, using the method of " the automatic calculates " gets the length of the line and area of field etc, at last got the length and width of every cross section of the fabiela river which is located downstream of xiangshan mountain. this method is superior and time - saving comparing with collecting data on the spot, having important and actual application worth

    第一部分主要介紹了gis的概念和研究內容, gis與相關軟體的比較以及gis的現狀、發展趨勢、當前gis研究的熱點等等,然後具體介紹了用gis的相關技術如:用「半自動跟蹤」方法對地圖進行數字化,用「自動量算」方法得到對象的、面對象的面積等,最終完成了象山庫下游法別拉河河道地形數據資料的提取工作,這種方法與人工實地採集工作相比,有較強的優越性和重要的實際應用價值。
  20. Fishing nets. method of determining the change of lenght of netting yarn in water

    魚網.網變化的測定方法
分享友人