沉陷差異 的英文怎麼說

中文拼音 [chénxiànchā]
沉陷差異 英文
difference of settlement
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : Ⅰ名詞1 (陷阱) pitfall; trap2 (缺點) defect; deficiency Ⅱ動詞1 (掉進) get stuck or bogged do...
  • : 差Ⅰ名詞1 (不相同; 不相合) difference; dissimilarity 2 (差錯) mistake 3 [數學] (差數) differ...
  • : 形容詞1 (有分別; 不相同) different 2 (奇異; 特別) strange; unusual; extraordinary 3 (另外的;...
  • 沉陷 : 1. (下陷) sink; cave in 2. (沉降) sinkage; downpunching; depression; subsidence; [建築] settlement
  1. The settlement isoline map, based on subsidence prediction in mining area, is difficult to be directly applied to land planning in mining area and mgis analysis due to its different data structure from digital terrain map

    摘要基於開采預計的採煤區下等值線圖不便於直觀地反映礦區地形的動態變化,其圖形數據結構與數字地形圖存在,難以直接用於規劃設計和礦區gis分析。
  2. Depositional cycles on basin scale have been interpreted as the result of depositional response to tectonism such as episodic rifting, polyphasic compressive flexural subsidence and reversion, and differential subsidence of fault blocks ; while the formation of high frequency sequences was attributed to variation in lake level and sediment supply

    盆地規模的積旋迴多是盆地幕式裂、多幕擠壓撓曲降、多期構造反轉、斷塊降等構造作用的積回應;高頻層序單元的發育則主要與湖平面和積物供給量的變化有關。
  3. For all long, however, they have been divided up in routine design that is taken at large by engineers, i. e., the rigidity relation and deformation correspond thereof are not considered so that the deformation and displacement from foundation are neglected, which will result in errors neglecting the restrained function to the warp of foundation due to the rigidity of the upper structure and the secondary stress of the upper structure because of different settlement from the foundation

    而長期以來,工程界普遍採用的方法是將上部結構、基礎以及土體分割開來,不考慮各部分之間的剛度聯系和變形協調,忽略了基礎的變形和位移,從而忽略了上部結構剛度對基礎翹曲的限製作用,以及基礎的降對上部結構引起的次生應力,因而在安全性和經濟性方面都存在缺
  4. According to many aspects, such as topography and geomorphology, types and distribution of soils or rocks, geotechnical composition pattern and the features of each geomorphic unit zone, geotechnical properties and so on, zhengzhou urban zone is classified into four geotechnical engineering zones. that ' s hilly country whose disrupted ground surface has damp and caving loess, vitruvian plain country whose vitruvian field of ground surface is easy to be leveled, oblique plain country which has leveler topography and good bearing layer, and overflowing plain features and differences of geotechnical engineering properties of foundation soil, each geotechnical engineering zone is also classified into different sub - zones of geotechnical engineering. and evaluation is given to geotechnical engineering condition, the suitable ability to buildings and the scheme of foundation in each zone

    各巖土工程區又根據其微地貌特徵及表層土工程地質性質的分為不同的巖土工程亞區(即區分為表層具濕性的巖土工程亞區( _ 1區)和表層不具濕性的巖土工程亞區( _ 2區) ;區分為局部易發生濕的巖土工程亞區( _ 1 )和不具濕性的巖土工程亞區( _ 2 ) ;區分為上部有厚層填土的巖土工程亞區( _ 1 )和上部有軟土分佈且有過大的降的巖土工程亞區( _ 2 ) 。
分享友人