河岸外坡 的英文怎麼說

中文拼音 [ànwài]
河岸外坡 英文
outside bank slope
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
  • : Ⅰ名詞1 (外面) outside; external side 2 (外國) foreign country 3 (以外) besides; beyond; in ...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 河岸 : river bank河岸沖刷 river bank scouring; 河岸防護林 river bank protection forest
  1. It is a rather well - known fact that bank - slope deformation and failure result from the coupling of earth ' s endogenic and exogenic geological processes, in which different dynamic - force factor has a different correlation to the evolution of bank - slope

    摘要的變形與破壞是地球內動力耦合作用的結果,並且每一種動力地質作用對于變形失穩的貢獻程度不同,造成變形破壞頻率和規模的空間差異。
  2. ( 2 ) according to the forming model of the deep pull cracks, they can be divided into three classes pulled cracks -, pressed cracks and sheared cracks. ( 3 ) based on the two - dimensional and three - dimensional finite element methods. the following results can be affirmed : in the slope excavating process, the base surface will rebound in the direction of the excavating surface ' s excerior normal. the maximal displacements of the left and right bank are + 3. 6cm and + 2. 4cm ; the arch abutment will rebound in the direction of the river valley, the maximal displacements of the two bank are + 3. 5cm and + 2. 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction. the maximal displacements are + 2. 1cm and + 1. 7cm. ( 4 ) the natural slope is stable

    ( 3 )通過二維及三維有限元分析得知,左右拱肩槽邊在開挖過程中,開挖底面主要表現為朝開挖面法線方向發生回彈,左右最大位移量分別為+ 3 . 6cm 、 + 2 . 4cm ;拱端面主要表現為向谷方向發生側向回彈,左右最大位移量分別為+ 3 . 5cm 、 + 2 . 2cm ;上下游面主要表現為向臨空方向的回彈,左右最大位移量分別為+ 2 . 1cm 、 + 1 . 7cm ;開挖使巖體產生由卸荷回彈導致的傾倒拉裂現象。
  3. For the purpose of assisting, within the scope of the first paragraph, existing enterprises that have already developed hot spring utilization in hot spring areas to comply with the provisions of the law concerning building use, the municipal or county ( city ) government with due jurisdiction shall, giving consideration to the development characteristics of the hot spring area as well as public safety, stipulate in the assistance program appropriate provisions concerning the setback distance of their building ( s ) from the foot of a retaining wall, the distance between the outer wall of their building ( s ) and retaining wall facilities, and the setback distance of their building ( s ) from a river bank, and submit these together with the program to the executive yuan for approval

    為輔導第一項?圍內,現有已開發供溫泉使用事業使用之建築物符合相關法令,直轄市、縣(市)政府應考量溫泉區發展特性併兼顧公共安全,就其建築物至擋土墻腳間之退縮距離、建築物墻與擋土墻設施間之距離及建築物座落之退縮距離,于輔導方案中訂定適用規定,併案報請行政院核定。
  4. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下谷巖體力學環境分析及右古滑體的穩定問題分析得出:建壩后谷的巖體應力量值明顯增高,同時左的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑體下滑推力的作用下產生破壞;建壩后水平推力對右古滑體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
分享友人