河岸集料 的英文怎麼說

中文拼音 [ànliào]
河岸集料 英文
bank-run aggregate
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
  • : gatherassemblecollect
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • 河岸 : river bank河岸沖刷 river bank scouring; 河岸防護林 river bank protection forest
  1. The bay model complements the first by using a very fine grid to resolve those geographic features such as bays and inlets at which storm surge observations are absent and where storm surge information is required as design parameters for coastal structures such as embankments

    而港灣風暴潮模式的覆蓋范圍較小,這模式利用一套非常密的網格點來計算出例如港灣和口等地理位置的風暴潮資以補開闊海模式的不足。
  2. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要中在潮汐頂托、口門逐漸加寬、口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對道淤積的影響進行了定量分析: (一扣根據實測資首次建立了贖流路泥沙沉積分配的回歸計算式,據此可以預估計算口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了口三角洲線動態平衡的概念,並建立了黃口來沙量與造陸面積的相關關系,得出了當口多年平均來沙量維持在3 . 45億t時其口三角洲線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  3. Improvement projects of province - administered rivers and secondary rivers, coastal protection and gatheringanalysis of hydrological data within the jurisdiction

    辦理轄區內之省管川、次要川臺理、海防護、水文資?分析
  4. Improvement projects of province - administered rivers and secondary rivers, coastal protection and gatheringanalysis of hydrological data within the jurisdiction. january, 1998

    辦理轄區內之省管川、次要川臺理、海防護、水文資?分析
  5. First river management bureau, taiwan provincial government improvement projects of province - administered rivers and secondary rivers, coastal protection and gatheringanalysis of hydrological data within the jurisdiction

    辦理轄區內之省管川、次要川臺理、海防護、水文資?分析
  6. The disadvantage is that small variations in coastlines such as bays and inlets cannot be resolved. the bay model complements the first by using a very fine grid to resolve those geographic features such as bays and inlets at which storm surge observations are absent and where storm surge information is required as design parameters for coastal structures such as embankments

    而港灣風暴潮模式的覆蓋范圍較小,這模式利用一套非常密的網格點來計算出例如港灣和口等地理位置的風暴潮資以補開闊海模式的不足。當建設沿工程如堤壩等需要參考港灣和口的風暴潮資而又沒有這些紀錄時,這套模式便派上用場。
  7. How to protect and conserve heritage architecture is very important to the city history and view, based on the long research, the article gives full information about heritage architecture clang suzhou river from three sides : architecture type, style and changing of function

    該文在全面收蘇州優秀歷史建築資的基礎上,從建築類型、建築風格和建築功能轉移三方面進行了詳細的探討。
分享友人