河床形態 的英文怎麼說

中文拼音 [chuángxíngtài]
河床形態 英文
bed configuration
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : i 名1 (供人睡覺的傢具) bed; couch 2 (像床的器具、地面) something shaped like a bed Ⅱ量詞(用...
  • : 名詞1. (形狀; 狀態) form; condition; appearance 2. [物理學] (物質結構的狀態或階段) state 3. [語言學] (一種語法范疇) voice
  • 河床 : riverbed; bed; poised river; [英方] waterstead; cauce
  1. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    取水工程的布設要考慮工程所處段的地質水文等諸多因素。如該段上下游水庫的庫容,泄水流量、道沖刷、淤積、河床形態、水流、冰塞、段上游的支流匯入、洪峰、沙峰的大小、道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  2. So far as the alluvial fiver is concerned, the sediment - carrying capacity of flow and hydraulic geometry of river channel can be regulated by regulating the composition of flow rate, silt concentration and sediment ( water and sediment regulation ) during water and sediment discharge ; with which the relative balance for water and sediment discharge and the river channel evolution can be obtained

    摘要沖積性流的在輸水輸沙過程中,調節流量及含沙量和泥沙組成(調水調沙)可以調節水力幾何和水流挾沙力,追求水沙輸運和演變的相對平衡。
  3. The local current disturbance after bridge being built in qiantang estuary leads to correspond changes of riverbed near bridge. but there is not any impact on astronomical tide, runoff large - scaled river shape and riverbed after bridge being built. so it does n ' t change the formation of tidal bore at all after bridge being built, but there is some impact on the shape and intensity of tidal bore because of pier resistance

    在錢塘江口建橋將引起局部水流的擾動及近區的相應變化,但不會對天文潮、徑流及大范圍勢、產生影響,因而,建橋不會從根本上改變涌潮的產生,但橋墩阻力對涌潮和強度是有影響的。
  4. Based on the morphological characteristics of riverbed of tidal estuaries, a calculation formula for the widening rate of the estuarine regulation line is derived

    摘要根據潮汐河床形態關系,推導了口治導線放寬率的計算式。
  5. It can work under a variety of dredging conditions with good benefit. because of the complexity in underwater soil, river bed condition and dredging process of a real dredging project, dredging conditions are very often unsteady

    在實際的疏浚作業過程中,由於水下土質、河床形態和作業過程的復雜性,嚴格地講,疏浚工況是非恆定的。
  6. In practice, because of the differences in soil property and irregular riverbed, dredging processes are usually complicated. in addition, dredger operators are required to understand dredging processes and to be familiar with the basic characteristics of the dredging equipment through specific training in order to control the dredging equipment correctly

    生產實踐中,水下土質的差異及河床形態的多變,使得疏浚工況和疏浚作業比較復雜,再加上大型疏浚設備十分昂貴,從而客觀上要求船員事先應通過崗位培訓,了解疏浚過程,熟悉疏浚設備的基本特性,為正確操控疏浚設備,實現安全高效疏浚,提供技術保證。
  7. Impact of flood events from different source areas on channel transects adjustment at the wandering - braided reach of the lower yellow river

    不同來源區洪水對黃下游游蕩橫斷面調整過程的影響
  8. Hokutolite is a natural substance produced in the peitou creek about 90 meters downstream from the hot spring. as water from the spring flows into the stream it cools, and after a certain distance, when the temperature drops to around 80, the mineral - saturated water forms a crystalline deposit on the gravel bed of the stream

    北投石產于北投溪源頭下九十公尺處,當泉水與溪水混合流過一定距離后,在八十度左右的環境下,呈飽和狀的礦物質就沈澱在礫石表面,成結晶。
  9. By use of the morphological coefficients of estuarine riverbed and the relevant data of the north channel of the yangtze river estuary, the widening rate of the regulation line of the north deep - water channel of the yangtze river estuary is calculated, and the calculation result is in agreement with that of the fixed bed model test

    利用已有的河床形態系數及長江口北槽的有關數據,估算了長江口北槽深水航道治導線的放寬率,且與定物理模型試驗值基本相符。
  10. The formation of the scoured pits is related with such factors as the unstable flow velocity and the unstable flow state caused by the circumfluence in the cross direction, the upstream circumfluence and the circle flow around the embankment

    沖刷坑的成與橫向環流、上游迴流和繞流丁壩造成流速及流不均勻等因素有關;根石走失與根石在水中的穩定性和性質及壩腳附近沖坑有關。
分享友人