河流水力學 的英文怎麼說

中文拼音 [liúshuǐxué]
河流水力學 英文
river hydraulics
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (學習) study; learn 2 (模仿) imitate; mimic Ⅱ名詞1 (學問) learning; knowledge 2 (學...
  • 河流 : rivers; stream
  • 水力 : waterpower; hydraulic power水力剝離 [采礦工程] hydraulic stripping; strip with water; 水力采礦 hy...
  1. Some researchers have made study on this subject, such as the generation and evolution of frazil ice, shore ice, bottom ice, ice cover and ice jam, the resistance of freeze - up river, flow capacity and variation of water stage

    國內外一些者通過原型觀測,試驗和數值模擬的方法對內冰,岸冰,底冰,冰蓋和冰塞的生成和演變,封凍道的阻、過位變化等有關問題進行了研究。
  2. The improved scheme can ensure the south branch to be open to navigation and the flow here not to be broken in low water seasons, and it will have active effect on protecting the south branch and fuyuan town. this study is an attempt of applying three - dimensional mathematical model in analogue calculation and analysis of flow, sediment and riverbed movements in a long river reach. it is very important for the future thorough research, and has great significance for promoting the application of the three - dimensional model to resolve

    本研究是三維數模型對較長、泥沙、床運動模擬計算分析的一次嘗試,其對今後進一步深入研究和應用三維模型解決工程實際問題,完善模擬方法、提高模擬平,真正發揮數模型其省時、省、靈活方便和模擬細膩等在研究沙運動規律和床變形等方面研究中優勢具有重要的意義。
  3. In the past, more emphasis has been put on the flow pattern and the division ratio of water and sediment discharge. in order to study the division characteristics, a theoretic model is proposed in this thesis, which combines the plan configuration of channels with the minimum energy dissipation rate theory

    本文將地貌中的平面形態和最小能耗率理論相聯系,研究分汊道的分特性,並推導理論分模式;另一方面,通過建立二維模型,與理論分析結果進行比較。
  4. Analyze the yellow river estuary sediment transport and distributing affected factors, utilize the field measured data, based on the hydraulics, river hydrodynamic and statistics fundamental theory, analyze the estuary sediment transport and settling deposition regulation, yellow river estuary gate area sediment deposition mechanism and estuary delta coastline dynamic balance, and some important achievements acquired

    研究報告分析了黃口泥沙輸移和分佈的影響因素,利用實測資料,運用、統計等基本理論和原理,對口泥沙輸移及其分佈規律、黃口口門區域泥沙沉積機理以及口三角洲岸線的動態平衡問題進行了分析探討,並取得了部分重要認識和進展。
  5. Hydraulics and river dynamics

  6. For understanding the dynamic processes of the all scales cloud systems of mei yu, and the relationship between mei yu system and the summer monsoon of eastern asia, the hubex has been carried on by the cooperation of china and japan in summer since 1998. the data observed by hubex, the data observed by other monsoon experiments and the general data ( gts data ) were merged into the assimilation system of game and made into the game reanalysis data, so how the game reanalysis data

    為了更好地理解梅雨鋒區多尺度雲系的能量與分循環過程以及他們與地面文過程的相互作用,從而搞清梅雨區雲系的多尺度動及其與東亞季風的關系, 1998年夏季中日合作開展了淮域能量與分循環試驗( hubex ) ,該試驗和game其他試驗的探空加密觀測資料作為原始資料的一部分經過同化分析,得到了game再分析資料。
  7. A 2 - d hydrodynamic - numerical model was applied to typical rocky rapids called jiyutan by comparing different computational models. based on the comparison of different schemes, the change of the discharge and the flow current in a branch were analyzed, and the relationship between the flow condition and excavation area, scope as well as mode was discussed, the conclusions show : ( 1 ) in a branching rocky rapids, the velocity may be reduced and flow condition can be improved by excavating one channel partly

    本文在對各種數模型比較的基礎上,應用二維模型研究典型石質汊灘? ?廣西潯江鯽魚灘航道整治工程方案,通過各方案計算結果比較,分析了不同汊道的開挖及汊道內不同開挖面積、開挖范圍以及開挖方式所引起的分比及工程區域航道條件的變化規律,研究結果表明: ( 1 )對于石質汊灘來說,在某一汊道通過局部開挖槽,擴大過斷面面積,可以達到降低工程段速、改善局部條件的目的。
  8. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪組成、泥沙演變、道湖泊系分佈特點以及道湖泊疏浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維計算模型預測疏浚工程實施后的位、量、場變化,為道、航道港口整治、道疏浚清淤等工程決策與實施提供了可靠理論依據。
  9. Then establishing a dependable orientation water - sediment dynamics of river networks is the important part of the work

    則建立一套可靠適用的城市泥沙動模型就是數字利的重要部分。
  10. In order to develop and utilize the ocean, its hydrodynaraic conditions have to be studied first. in estuary and coastal seas, tidal flow is a basic hydrodynamic factor, which affects other substance transport remarkably

    ,是海岸帶、海灣、海峽和潮汐口地區的主要條件之一,是這些地區最基本的物質運動,其他物質諸如泥沙、鹽分、各類污染物質及熱量的輸運過程,均伴隨著潮而運動。
  11. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿原理,導得了考慮各種因素的泥漿液在預填骨料中的動影響半徑和上升高度;結合南省洛陽伊大橋、黨灣澗大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大推廣應用空心樁新技術提供了可靠的技術資料。
  12. Firstly the present situation of hydraulic fracturing of rock mass was talked about, then, the hydraulic fracturing of rock mass test was carried out with cement mortar ( analogue material of rock mass ) thick tube hollow cylinder through seepage - stress coupling apparatus that was developed by the laboratory of seepage control in hohai. through the analysis of data, the thesis discussed the mechanism of the hydraulic fracturing of rock mass

    首先對巖體劈裂研究的現狀作了較為詳細的綜述,然後應用海大實驗室的滲?應耦合試驗儀對以泥砂漿為巖石相似材料的厚壁圓筒試件進行了劈裂試驗,並對試驗結果進行詳細分析,對試件劈裂破壞機理進行了深入的探討。
  13. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩海大博士論文的存在抬高了面線的位置,其中在閘墩頭部尤其明顯;墩型對量系數和壩面壓影響較大, 3a型閘墩相對於2型閘墩具有更大的量系數和更小的壩面壓:不同的墩厚閘寬比t / b對泄也將產生顯著的影響,隨著墩厚閘寬比的增加,壩面壓降低,而當t / b二0 . 2時溢壩具有更大的量系數。
  14. This thesis concludes the flood control situation, engineering measures and the situation of optimal dispatch method. it studies flood control engineering system, which is composed of flood prevention reservoir, river course dyke and natural detention basin, and the relationship between various flood engineering measures according to the composition and characteristics of the flood control engineering of the middle - lower reaches of beijiang. it suggests the objective function based on the least flood loss and the optimal dispatch strategy structure of the middle - lower reaches of beijiang bound with the requirements of the flood gradual progress equation combined with hydrology and hydraulics

    本論文總結了我國防洪情勢、防洪工程措施及其優化調度方法研究的現狀;針對珠江域北江中下游防洪體系的組成及其防洪工程的特性,研究由防洪庫、道堤防和天然滯洪區共同組成的防洪工程體系中各防洪工程措施之間的關系;提出了以洪災損失最小為目標函數、以相結合的洪演進方程等要求為約束條件的北江中下游防洪體系優化調度策略框架。
  15. Taking ningxia - inner mongolia reach of yellow river as a study case, a ice regime forecast data warehouse is established for the datamining concerned on the basis of the analysis on the ice regime changing law and its influencing factor of the reach, and then the conceptual mathematic model and artificial neural network model for the parameter calibration of ice regime forecast are built up with gis in combination of the relevant empirical forecast models based on the principles of the hydrological flow muting, thermodynamics and ice hydraulics etc., with which the design and development of the decision support system for the ice regime forecast with the integrated functions of information inquiry, model parameter calibration, temperature forecast and ice regime forecast are preliminarily discussed

    摘要以黃寧蒙段為例,在對段歷史冰情變化規律及其影響因素分析的基礎上,建立冰情預報數據庫,進行數據挖掘,並以地理信息系統( gis )為平臺,以量演算、熱、冰等原理為基礎,結合相關經驗預報模型,建立用實測資料進行參數率定的冰情預報概念性數模型和人工神經網路模型,初步探討了集信息查詢、模型參數率定、氣溫預報、冰情預報等功能為一體的冰情預報決策支持系統的設計與開發。
  16. The results indicate that those soil factors, which are selected by the blending method of dynamical and statistical approaches, are useful for forecasting monthly summer precipitation and can expressly discover their dynamical relationships

    結果表明對淮域夏季降趨勢的預測有很好的效果,且更加明確了土壤溫、濕因子與降異常之間的動聯系。
  17. Zhangxianming, male, was born in shandong on may 27, 1965, majors in the study of channel engineering, river dynamics, sediment engineering and hydrodynamic ; meanwhile, he has been teaching several related courses

    張賢明,男, 1965年5月出生,主要研究方向為航道工程、、泥沙工程及,承擔了多門相關課程的教工作。
  18. Studying on river shoal evolution is a fundamental work in the science of water conservancy, water conservancy projects and waterways planning, designing, management and engineering feasibility

    道淺灘演變研究是的重要組成部分,是科的基礎性課題,也是進行利、運工程規劃、設計、管理和工程可行性研究的基礎工作。
  19. Based on the unascertainty of river water environmental system, the unascertained mathematics theory was used to research the issue of water environmental carrying capacity, and to assess the risk that corresponds to different discharge levels

    摘要從環境系統的未確知出發,運用未確知數理論對體納污能及其風險問題進行研究。
  20. Using flood progress model and the different discharge of feilaixia reservoir, we can calculate in time the water level and discharge of middle - lower reaches of beijiang, thus increase the accuracy of flood forecast and provide the important technical support for the further research on the optimal dispatch method of f lood control system

    其中依據相結合的洪演進模型,可根據飛來峽庫不同的下泄量,及時計算北江中下遊道的面線和下泄量,提高了洪預報的精度,為進一步研究防洪體系優化調度方法提供極其重要的技術支撐。
分享友人