泄洪道 的英文怎麼說

中文拼音 [xièhóngdào]
泄洪道 英文
flood relief channel
  • : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  1. It is necessary and pressing to excavate and broaden the floodway to increase the capacity of flood discharge and enhance the standard of flood control

    因此,開辟淮河入海水,擴大水出路,增加能力,提高下游地區的防標準是十分必要和緊迫的。
  2. Aim at the characteristics that parts of oil wells of oil - field in jiangsu locate the hongze area floodway in the lake, which designed a kind of lake area oil extraction terrace

    摘要針對江蘇油田部分油井位於澤湖區泄洪道上的特點,設計了一種湖區採油平臺。
  3. Sir, there ' s someone coming down the spillway

    長官,有人進泄洪道
  4. All right, this is a topographic map of the dam. this is the spillway

    看,這是大壩的地形圖,這是泄洪道
  5. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河流域大清河北支及中下遊河水數值模擬的實際工作中,應用了一維河網模型進行水的模擬計算,並根據實際情況加入了蓄滯區調度、閘控制調度以及近年來北方河入滲的特點等條件,計算效果良好。
  6. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過系統整體水力學試驗,校核洞的流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管水擊壓力穿井系數以及洞弧形門處的水壓力。
  7. The deposition of sediment in channels decreases the channel capacity and the flood-carrying capacity.

    泥沙淤積在河內,減少了河槽容量和能力。
  8. Since boundary of the lower yellow river bed varies with the flow conditions, main channel of the stream continually shrank and flood control becomes rather difficult

    隨著黃河下游水沙條件的不斷變化,河的邊界條件也隨之發生變化,主槽嚴重萎縮,能力日臻下降,防問題日益突出。
  9. Analyses show that, when the ratio of the two branches ' discharge widths is coordinated with the resistance ratio of the two branches, the project reach has the least resistance, that the discharge capacity is the largest and that its influence on the project reach is less after the finishing of the project

    通過分析,當兩汊流寬度之比與汊兩汊阻力比相協調時,樞紐河段的阻力最小,其能力達最大,且樞紐建成后對樞紐河段的影響也較小。
  10. We have to go through the spillway

    我們必須穿過泄洪道
  11. - this is recent water activity. - if we go in, stryker could flood the spillway

    這是最近水流活動的記錄如果我們進去,史崔克會往泄洪道放水的
  12. This is recent water activity. - if we go in, stryker could flood the spillway

    這是最近水流活動的記錄.如果我們進去,史崔克會往泄洪道放水的
  13. The maximum capacity of wushantou s sluice gates is 1, 500 cubic meters of water per second. at maximum flow, a rainbow is created. the spectacular views from the nearby suspension bridge have earned it the name " rainbow bridge.

    烏山頭的溢,最大溢量為每秒一千五百立方公尺,時形成的彩虹,因跨越溢吊橋之上,形成特殊景象,而有跨虹吊橋之名。
  14. Various computational examples are presented in the paper for different cases, such as simultaneous routing of main and branch streams, routing of dam - break flood, computation of simultaneous outflow from dam, flood calculation in watercourse with multiple branch steams, and computation of the hydraulic grade line in the reservoir

    論文針對不同條件分析了干支流同時演進計算、潰壩水計算、干支流大壩對下游的影響、多支流河演算和庫區水面線的計算。
  15. Application of water damage and reinforcement for base plate of flood discharge trough in spillway of guanzhuang reservoir

    官莊水庫溢槽底板水毀原因分析與加固
  16. The unavoidable flooding of villages occurred when authorities opened sluice gates at a dam on guangdong ' s hanjiang river because water there was building up to too high a level, it said

    稱,由於廣東韓江水位過高,當地政府開啟了一座水壩的閘,從而不可避免地淹沒了這些村落。
  17. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山水電站溢進水渠流態、提高流能力,通過一系列試驗優化了溢引水渠左導墻頭部曲線型式。
  18. As one of the three main parts of the dujiangyan irrigation system, it controls the water that flows into the baopingkou water inlet and discharges flood and sand with its top graphical feature

    巧妙利用河地形的排沙工程,為控制內江進水量的關鍵所在,是都江堰渠首工程三大主體之一。
  19. Abstract : based on the results of hydraulic model test and remote - control ship model, the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed. the measures of raising navigation discharge level and improving navigation conditions are given

    文摘:根據水工模型試驗成果,分析了三峽工程時壩下游引航和兩壩間河段(三峽至葛洲壩)的非恆定波流運動特性,結合遙控自航船模試驗對兩壩間的通航水流條件進行了分析評價,並提出了提高通航流量標準、改善通航條件的相應措施。
  20. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,消能與防沖問題突出.經科學研究,採用「分散,削弱水流沖擊力,加固河床,增強河抗沖能力」的綜合治理措施,較好地解決消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
分享友人