波速計 的英文怎麼說

中文拼音 []
波速計 英文
wave-velocity meter
  • : Ⅰ名詞1 (波浪) wave 2 [物理學] (振動傳播的過程) wave 3 (意外變化) an unexpected turn of even...
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. The program includes the infrasonic signal data acquisition of three channels, 3 - d dynamic spectrum analysis, correlation analysis of 3 channel infrasonic signals, the calculation of wave direction, the wave speed, the spectrum analysis at any length and a real - time infrasonic gravity wave pressure - time ( p - t ) curve

    本程序支持3路次聲傳感器信號的數據採集、動態譜分析及次聲信號的相關分析、能源的方位角、以及任意時間段的譜分析,並實時給出次聲重力的壓力?時間曲線(即p ? t曲線) 。
  2. With the correlation technique, direction and speed of the infrasound can be calculated by computing the time delay of each detector and by using geometric knowledge

    利用互相關技術,算信號在不同傳感器上的時間延遲,再由平面幾何原理,得到的方位和
  3. Tacholess order tracking filtering for run - up or coast down vibration signal of rotating machinery based on zero - phase distortion digital filtering

    無轉旋轉機械升降振動信號零相位階比跟蹤濾
  4. According to the calculation formula of the ratio of pile and soil of compound foundation bearing capacity, and base on the calculation formula of the ratio of pile and soil given in this thesis, the relation model of rayl eigh wave velocity and gravel pile compound foundation bearing capacity is deduced

    根據復合地基承載力應力比算公式,基於本文提出的應力比算模型的基礎上推導了瑞雷和碎石樁復合地基承載力之間的關系模型,建立了日本模型、武漢地區模型、下遼河平原模型三種模型的碎石樁復合地基承載力算公式。
  5. Evaluating wave speed in concrete by bispectrum based time delay estimation

    基於互雙譜的應力的研究
  6. ( 5 ) based on an empirical formula, in terms of soil shear velocity, to evaluate soil liquefaction, which is simple to handle and prospective in further application, the author presents, in the probabilistic and fuzzy way, the formulae for the evaluation of liquefaction probability and fuzzy probability at given depths and for a fuzzy evaluation of liquefaction hazard of the total soil layers

    討論了當剪切具有隨機性時液化的發生概率,進而給出了確定場地液化和危害程度的發生概率,在此基礎上,結合液化和液化危害程度(等級)的模糊性,利用模糊事件的概率分析方法,提出了可同時考慮隨機性和模糊性場地液化和液化危害性的發生概率的算方法。
  7. The fact that wave velocity in quasi - saturated soil is equal to that of fully saturated soil could not be calculated by effective fluid compressibility or explained by unwell - distributed saturation. we account for this in a new reasonable way which was based on kuster scattering effect analysis

    ( 8 )根據kuster散射理論,算了飽和度大於85的準飽和土體的彈性,其結果與試驗非常吻合;但是,通常所用的等效孔隙流體壓縮系數的方法所算的結果與實驗結果差別很大,對此,筆者給予了一定的解釋。
  8. Localization underground target algorithm base on the best automatic curve fitter can survey velocity of electromagnetic wave in underground medium, and locate underground target. it ’ s virtue is small number of operation times. it ’ s shortcoming is subject to clutter

    基於自動最佳擬合曲線的測定和目標定位方法可以比較準確地算出算出目標位置,優點是運算量小,缺點是容易受到雜干擾的影響。
  9. The localization of mobile object is accomplished by nonlinear kalman filter. based on the formulae of localization errors, the rules are analyzed, which describe the relationship between the localization precision and the constellation factors, such as constellation shape, the height of satellite. the method to design the constellation is presented with the help of these rules

    論文利用非線性kalman濾了三星時差定位星座對運動目標的定位定演算法;根據定位誤差的解析公式,利用模擬方法分析了三星時差定位星座的星座構型和衛星高度等因素對定位精度的影響規律,並依據定位精度影響規律,研究了三星時差定位星座的星座設問題。
  10. To study the changes of poisson ' s ratio and its anisotropy with confining pressure, we measured p - and s - wave velocities in three orthogonal directions in 19 rock samples under different confining pressures

    為了研究不同巖石中泊松比及其各向異性隨圍壓的變化,選取19塊典型的巖石樣品,在不同圍壓下沿相互正交的3個方向同時測量縱、橫度,並通過算得到了泊松比及其各向異性。
  11. Poisson ' s ratios calculated from v ( subscript p ) / v ( subscript s ) can provide much tighter constraints on the crustal composition than either the compressional or the shear velocity alone

    摘要由彈性縱橫算得到的泊松比,在利用地震反演地下結構和物質組成時,可以提供比單純地利用縱或者橫更強的約束。
  12. The quantification indexes that token weathered degree are primary velocity, borehole rqd ( rock quality designation ), joint space, joint number and so on, and the unloading ones are primary velocity, joint opening, borehole penetrability and so on. the compartmentalization of different weathered and load - off zones according to quantification indexes tallies with the slope geo - stress computed by finite element method

    其中研究風化分帶的定量指標有縱vp 、鉆孔rqd 、結構面間距與條數等,研究卸荷分帶的定量指標有縱度、節理開度與鉆孔巖體透水性,據此劃分的不同程度風化、卸荷巖體與有限元算的壩區河谷應力場具有良好對應性。
  13. Then, we use a simulation method to create a large number of radar measurement values, produce a quantity of random numbers using computer software and add them to the radar measurement values, we use kallman filtering method to calculate the location, velocity and trajectory coefficient of the target at the moment of the final tracking point, and use the numerical solving method of differential equation to calculate the trajectory, the location of the hostile artillery or the impact point of its own projectiles, finally, we calculate statistically the random error of the tracking system and analyze the location accuracy

    然後採用模擬模擬方法獲得大量的雷達測量值,由算機軟體產生大量的隨機數,加入雷達測量值中,用卡爾曼濾算出最後跟蹤點時刻的目標位置、度和彈道系數,再用微分方程數值解法算出整個彈道軌跡、算出敵方炮位的位置或己方炮彈的落點,最後統出跟蹤系統的隨機誤差,分析定位精度。
  14. According to the analyses of the research results about the feasibility of 4 - d seismic and the successful 4 - d seismic cases of foreign companies, the author put forward the suggestions for 4 - d seismic pilot area selection ; briefly analyzed the influential function of producing way on the seismic response ; utilized theory calculation, coring data analyses, and reservoir numerical simulation to define the fluid substitution effects on the p - wave velocity. through long time water driven to the reservoir, some of the properties and the log curves have changed, the author tried to find the variation rule of the reservoir and its effects on seismic velocity. the " blind point " in 4 - d seismic feasibility study both in china and overseas was found, that is the lack of consideration of the influence of physical property variation by long time water driven on the seismic response

    在深入分析國外四維地震可行性研究成果和成功實例的基礎上,提出了有利於水驅四維地震成功的工區優選條件;簡要剖析了各種開采方式及其對地震特性的影響;利用理論算、巖心分析、油藏數值模擬三種方法確定了流體替代對縱度的影響;通過對長期水驅造成的物性參數、測井曲線以及油藏溫度和壓力變化規律的總結,分析了這些變化對地震度的影響,指出了目前國內外水驅四維地震可行性研究中存在的盲區?沒有充分考慮長期注水造成的物性、溫度和壓力變化對地震響應的影響,完善了水驅四維地震可行性研究的內容;在考慮了這些變化因素后,高29斷塊水驅四維地震可行性研究結果表明:四維地震監測注水前沿可能要比監測油藏變化容易的多;以四維地震巖石物理可行性研究結果為基礎,提出了五個有助於突出四維地震造成的微小差異的途徑,為今後水驅四維地震研究指明了方向。
  15. With a purpose to provide basic data or figures for the feasible research of a project construction and its planning, taking the practical project of preselecting a factory location for an instance, using the principle and method of shallow seismic reflection, based on the area conditions, differences in physical features and disturbance, with experiments on typical sections of the construction area, one can draw reasonable measuring lines, choose right modes of producing and receiving waves, conduct primary and precise computer data processing, acquire a distinct reflected wave section from a shallow depth and explore the stratum structure in the preselected location and the distribution of longitudinal waves

    摘要結合某重大工程預選廠址項目的工程實例,利用淺層地震反射法的原理和方法,根據現場的場地條件、物性差異和干擾情況等,結合典型地段的試驗,合理布置測線,選擇恰當的激發和接收方式,進行初步和精細的算機資料處理,可以得到清晰的淺層反射剖面,準確地查明了預選廠址的地層結構和縱度分佈,為工程建設的可行性研究和規劃提供了基礎資料。
  16. This paper relates to some problems about the determination of design ground motion parameters, which include the choice of the attenuation relationship of rock horizontal acceleration response spectrum, the impact of focal depth to rock peak horizontal acceleration and rock response spectrum curves, the choice of intensity envelops function and random input phase, the choice of soil nonlinearity and shear wave velocity, scale of design ground motion response spectrum etc. in the researches of relative aspect, based on a typical section plane of the engineering site, influence of the change of some parameters on design ground motion parameters and the existing errors and corresponding rules are studied by using the method of one dimension model of equivalent linearization

    摘要研究了確定設地震動參數中涉及的若干問題,其中包括基巖水平加度反應譜衰減關系的選擇、震源深度對基巖水平加度峰值及基巖反應譜曲線的影響、強度包絡線函數及輸入隨機相位的選擇、土體非線性特性參數和土層剪切值的選擇、設地震動反應譜的標定等問題。
  17. Based above, a two - grade fuzzy comprehensive evaluation model is presented on the ground of the current seismic design code for building. it is that taking the membership of equivalent shear velocity as weight of the model not empirical weight in traditional one - grade model. it has been proved in site classification reasonable

    參照我國現行建築抗震設規范,改變過去以經驗系數為權重的一級模糊綜合評判模型,以等效剪切對各場地土的隸屬度為權重,建立了場地二級模糊綜合評判模型,對場地進行劃分。
  18. For the problems arising from the absence of exact dynamics models, the gauss - markov process is used to approximate the un - model acceleration term in the circling orbit dynamics

    利用高斯-馬爾科夫過程近似繞月探測器的無模型加度,並利用基於unscented卡爾曼濾了探測器的位置、度及無模型加度。
  19. The paper uses precise step to produce the continuity function of water hammer mathematic model, not only gains more precise water hammer pressure function and water hammer wave speed function but also founds correct water hammer mathematic model continuity equation movement equation after ignoring subordinate facts, function ( 1 ) and ( 2 ) translate into the current applied water hammer pressure function and water hammer wave speed function

    本論文對水擊數學模型中的連續性方程重新進行了嚴謹的推導,不僅得到了更加準確的水擊壓強和水擊算公式也建立了正確的水擊數學模型連續性方程運動方程當忽略次要因素以後,公式( 1 )和( 2 )即可轉化為當前應用的水擊壓強算公式和水擊波速計算公式。
  20. ( 6 ) a highway capacity calculating model for basic sections is set up by using the maximum wave velocity

    ( 6 )提出了用最大波速計算通行能力的公式。
分享友人