注水井網調整 的英文怎麼說
中文拼音 [zhùshuǐjǐngwǎngdiàozhěng]
注水井網調整
英文
modification of injection pattern- 注 : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 井 : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
- 網 : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
- 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
- 整 : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
- 水井 : well
- 調整 : adjust; tune up; trim; trimming; variation; modulation; arrangement; debug; rectification; redres...
-
Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement
在對本區開發歷程和開采特徵分析的基礎上,從微構造、沉積微相、儲層非均質性、井網控制等方面深入地分析了油藏水淹特徵及剩餘油分佈規律,提出了以完善注采井網、調整注采結構為目的的綜合調整措施,已見到了明顯的效果:油田遞減由1997年的9 . 14降至目前的- 1 . 46 ,綜合含水上升率由原來的0 . 33降至目前的0 . 16 。The study gets the following conclusions : 1 ) inverted nine - spot pattern water flooding is used in the early stage of the development, while linear water flooding is used in the later stage ; 2 ) well array is parallel to the fracture trend ; 3 ) the well arrangement of barycentric position method is a suitable pattern adjustment method in the later period of the development in low permeable oil fields
研究認為,一是油田開發初期注采方式採用反九點法面積注水,開發後期調整為線狀注水方式;二是井排方向與裂縫走向平行;三是「重心位置」布井方式對低滲透油田開發後期是較為適合的井網調整方式。To solve some questions about oil production declining quickly, production and injection patterns are imperfect, the low degree of reserves control, and the injection water not enough in injection well, we have taken measures such as strengthen the geologic integrated research, drill extension well and adjustment well, strengthen water injection system, and optimize fracturing techniques, which has improved reservoir development effect
為了解決產量遞減快、注采井網不完善、儲量控製程度低、注水井欠注等問題,採取加強地質綜合研究、鉆擴邊井和調整井、強化注水系統和優化壓裂工藝等措施,有效地改善了油藏開發效果。One of the crucial issues in reservoir engineering study is how to choose pattern well spacing in order to reach the highest recovery and optimal economic efficiency by waterfooding process for field development project designing and well pattern infill or adjustment
摘要在油田注水開發方案設計和井網加密調整工作中,選用何種布井方式或井網密度,使油田水驅採收率獲得最高、油田開發經濟效益達到最優,這一直是油藏工程研究的主要問題之一。分享友人