泵蓄力器站 的英文怎麼說

中文拼音 [bèngzhàn]
泵蓄力器站 英文
pump accumulation
  • : 名詞(吸入和排出流體的機械) pump
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    開發生產大型抽水能機組、大型貫流式機組、大功率超臨界火電機組、大型空冷汽輪發電機、大型循環硫化床鍋爐、大功率核電汽輪機和發電機、核島設備壓殼、高壓蒸發和主等核電一級設備。
  2. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步電動機變頻調速技術的發展概況,在回顧電梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用的液壓電梯變頻節能控制系統研究」的基本原理,分析了動系統在電梯轎廂輕載上下行、重載上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液壓動的結構設計和參數設計,重點研究了液壓動的結構設計、液壓馬達可逆性問題及其選型設計計算、迴路泄漏油損失機理的研究及其補償裝置的設計、-馬達壓能量轉換裝置的設計、多功能集成控制閥組的設計等內容;最後簡單介紹了本課題矢量控制變頻控制櫃的外部附件電氣接線、計算機控制及數據採集系統的硬體設計等內容。
  3. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏抽水能電的水運行時,不同負荷工況下停機、導葉和轉輪間壓的變化,闡述了華東桐柏抽水能電1號機組發電機斷路開斷的最佳負荷值選定。
分享友人