洪模元 的英文怎麼說

中文拼音 [hóngyuán]
洪模元 英文
hong moo won
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  1. ( 2 ) for estimation of influences of hydraulic engineering ( control factors ) on floods, a reservoir regulation model is established based on calculation units controlled by each reservoir and reservoir system co - operations

    建立了以每個水庫控制面積為計算單的水庫(控制性因素)對水影響計算型。
  2. In this paper, dea model, which is constructed for appraising the advance of science & technology of hydraulic conservancy, chooses 30 provinces ( municipalities, autonomous regions ) as decision unit, capital construction investment as input index, flood control, irrigation, waterlogging prevention, alkali harnessing, water and soil conservation, water supply in cities, hydropower, drinking water for people and livestock as output index

    本文構建的水利科技進步評價的dea型,以全國30個省、市、自治區為決策單,以基本建設投資為輸入指標,以防、灌溉、除澇、治堿、水土保持、城市供水、水電、人畜飲水等為輸出指標。
  3. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄閘預應力閘墩這一工程實踐,採用國際上已成熟的有限方法,合理地建立了預應力閘墩的三維有限型,該型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  4. Combined with the existing problems of the national key project - linhuaigang flood - control project, this paper systematically studied the theories of sluice structures design foundation model modern calculation methods of both plane and spatial sluice structures ; at the same time, static and dynamic analysis of he spatial structure of the jiang tang lake ' s flood - entry sluice was studied using the finite element method

    本論文結合國家重點水利工程臨淮崗水控制工程中遇到的實際問題,系統地研究了水閘結構的設計理論、地基型、平面和空間水閘結構的現代計算方法;並對姜塘湖進閘空間結構進行了有限靜動力計算分析。
  5. In this paper the basic principle of the method of characteristics is described, and is constructed an explicit scheme for dam break simulation of one - dimensional dam instant all break waves flow of a low dam with rectangle section and a huge dam with trapezia section, and of two - dimensional dam instant part break waves flow with simplest space operator splitting

    本文擬了一維矩形斷面低壩和梯形斷面巨型壩瞬間全潰的水波演進過程,給出了與分析解的比較,並結合運算分裂的特徵線法對二維瞬間部分潰壩時水波的演進過程進行了數值擬。
  6. Establishing the synthetic evaluation model of city flood control system based on the matter - element theory and taking the city flood control system of fushun city of liaoning province as an example, this paper determines the index system and various indices ' classical domain, joint domain and weighing, and carries on the appraisal

    建立基於物理論的城市防綜合體系評價型,並以遼寧省撫順市為例,確定指標體系及各指標的經典域、節域和權重進行評價。
  7. The general basin flood model is deduced by analogy between the matter composing of atom and it composing of character objects. the character objects are follow : one dimension flow model, two dimension flow model, zero dimension flow model, linking flow model, engineering control flow model and so on. the different character objects make up of the different basin model

    通用性流域水演進型採用類比物質構成的分解,把流域分解成各種基本特徵素的擬:一維水流擬,二維水流擬,零維水流擬,連系水流擬以及工程運行控制擬等,由不同的特徵素的數量和種類的組合,構成不同的特定流域,使所建的流域型具有很好的包容性,能夠包容各種各樣的流動結構,適應不同的流域擬的需要。
  8. On one hand, the internal forces and displacement formulas of csbcs were deduced by using the matlab program, on the other hand, taking out of one wavelength of csbcs and soil from the actual project as the analysis object, simulation numeric calculation was carried out by using big - style fem ( finite element member ) software, ansys

    一方面,用matlab編程,推導了波紋鋼板橋涵的內力和位移公式,另一方面,取一個波紋長度的波紋鋼板橋涵和土作為分析對象,用大型有限軟體ansys對湖北沙線豐收渠橋涵工程的靜載試驗進行了擬數值計算。
  9. Chi - jie lu, du - ming tsai and hsu - nan yen, ( 2002 ) " automatic defect inspection for lcds using singular value decomposition, ” the fourth asia - pacific conference on industrial engineering and management systems, taipei, taiwan, december 18 - 22

    呂奇傑、蔡東升、陳乃魁、嘉佑、程希鈞( 2004 ) 「應用支援向量機于信用卡分類式之建構」第三屆資訊與管理應用研討會,培技術學院,新竹。
  10. By applying " none homogeneous multi - laminate element ", hong - kou rcc gravity dam ' s simulation computing of temperature field and stress field at construction period and operation period for all courses and many factors. e. some kinds of methods are discussed in detail for temperature field back analysis, and artificial neural network method for back analysis of thermal parameters of concrete is suggested

    應用「非均質層合單法」實現了口碾壓混凝土重力壩施工期、運行期全過程多因素的溫度場及徐變應力場的擬計算,進行多方案的比較分析,推薦出優選溫控防裂方案,取得了非常滿意的成果。
  11. The appraisal results are consistent with the fushun city ' s flood control reality, which indicates that the matter - element model could be able to solve the synthetic evaluation of city flood control system effectively

    評價結果與撫順市防現實較為一致,表明物型能有效解決城市防體系綜合評價問題。
分享友人