流入淤泥 的英文怎麼說

中文拼音 [liú]
流入淤泥 英文
flowed-in mud
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • 流入 : inflow; influx; indraught流入角 fluid inlet angle; influx angle; 流入量 influx; inflow
  • 淤泥 : sludge; ooze; slush; mire淤泥層 mud; 淤泥沉積 siltation; 淤泥沉積物 mud deposit
  1. The paper starts with the reservoir sedimentation, operation mode and catchment runoff characteristics. the study comprises of distributing of runoff and sediment in the catchment, the influence and trend of sedimentation and water storage under different operation mode

    課題研究主要從水庫積狀況、運用方式和域徑特徵分析手,闡述了域徑沙時段分佈,研究了不同運用方式下水庫沖的主要影響因素及變化趨勢,分析了不同運用方式時水庫積情況和攔蓄水量。
  2. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽水庫手,分析水庫積特性和庫區圍墾堤開發利用積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄庫容、造成同級量下水庫水位抬升水庫回水上延、對沿岸及過河建築構成影響、因水位抬升致使庫區周邊灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水庫庫區大量積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出庫區圍墾堤是水庫水位抬升的重要原因。
  3. The incoming water brings silt with it into the pond. this silt settles onto the pond floor and needs to be removed or else the pond will dry up. as a result, the reserve s dredger is now busy clearing the silt from the channels around the perimeter of

    沿岸濕地會被堵塞,逐漸變為乾地,這是自然現象,米埔亦難以避免:當基圍換水時,的水沖進塘內,並積聚塘底,若不清理,水塘終會乾涸。
  4. An integrated 1 - d and 2 - d sediment transport model is used herein to study the response of the revolution of yellow river mouth on its trail channel

    摘要利用適合於黃河下遊河道和黃河口水域的一、二維連接沙數學模型,計算研究了黃河口演變、路的積延伸對下游尾閭河道的反饋影響。
  5. The plant is now treating 1. 4 million cubic metres of sewage and effectively stopping 600 tonnes of sludge from entering the harbour every day

    公噸的污水,使其中的污染物不致海港。該廠採用最先進的技術和設備,並應用節省空間的雙層沉澱池設計。
  6. In the research on jingtang harbour the co - action of wave and current with movable trubid water model was firstly considerd

    京唐港海航道回問題試驗研究,蘇州工業園區華能發電廠冷卻水試驗研究,曹妃甸潮汐水沙問題數模和物模研究。
  7. With ecotype watershed construction for target, make good eco - environment, production development and life wealthy come true, lie the economy and environment foundation for building a well - off society ; controlling effectively the sediment entering into the yellow river to meet the country ’ s demand, ensure yellow river safe ; making the watershed as a unit, the administrative region divisions and the watershed region divisions combine together ; with comprehensive management for center, various measures can be taken ; taking water - sediment balance theory as foundation, build up the relatively constant dam system ; taking science and technology as support, plan and design check - dams scientifically, and rightly evaluate the comprehensive benefits of check - dam ; on the basis of small watershed integrated management model, carry on managements, demonstration and extension in the large demonstration area

    以生態型域建設為目標,實現生態良好、生產發展、生活富裕,為建設小康社會奠定經濟和環境基礎;以有效控制沙為國家需求,確保黃河安瀾;以域為單元,行政分區和域分區相結合;以綜合整治為中心,多種措施並舉;以水沙平衡理論為基礎,建立相對穩定的壩系;以科技為支撐,科學規劃和建設地壩,正確評價地壩的綜合效益;在小域綜合治理模式的基礎上,開展大示範區成片治理、示範及推廣。
  8. Chinese scientists say that as the dam blocks silt heading downstream, the yangtze river estuary region, which includes shanghai, is shrinking and salt water from the ocean is flowing further inland

    中國的科學家稱,大壩阻擋了向下游,使包括上海地區在內的長江海口收縮,海洋的鹹水正在倒灌內陸。
  9. The paper will be based on a 2d tide current numerical model to analyze the change of tide current field and the influence of sand silt before and after engineering

    本文從計算潮手,建立一個潮數學模型來計算潮場,分析工程建設前後潮場的變化,並分析了工程前後沙回情況。
  10. Basing on analysis of the situation of water resources in loess plateau areas, this paper propounded the engineering and agricultural technology and the method with direct and indirect, which draw rainwater on road surface into " soil reservoir " of farmland or water cellar with free atmospheric pressure using silt delve of eliminate energy

    摘要通過對黃土高原水資源現狀分析,提出了採用消能坑,通過直接、間接將路面雨水引農田「土壤水庫」或時空可調節的自壓式集水窖等貯水設備中,並採用一定的耕作農藝措施將路面雨水利用到農田中的方法和技術。
  11. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深水航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河口海岸波浪、潮沙運動的動力機制,以及整治工程建築物對其影響的研究,對海航道沖和河勢演變的監測分析,對施工進展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的深有效結合。
分享友人