海島工程 的英文怎麼說
中文拼音 [hǎidǎogōngchéng]
海島工程
英文
engineering on an island-
In consideration of studying island coast hydrodynamic factors is in order to build breakwater engineering, design waves, astronomic - tide and storm - tide which increases water level are computed to offer design parameters, discuss and analyze the influence of engineering safety aroused by those factors
考慮到研究海島周圍海岸動力因素的目的是為了建設海島工程,還進行了設計波浪以及天文潮、風暴潮增水的計算,分析了這些因素對工程安全性的影響。The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )
海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people
隨著國內高層建築的發展,深基坑支護工程越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護工程越來越引起了各方面的重視。Construction of sewers and the north - east river wall and site formation work at tai o, the road improvement works for cheung chau old town, and the reclamation, road and drainage works at yung shue wan, lamma island are in progress
大澳污水渠與東北河堤建造工程及地盤平整工程、長洲舊墟道路改善工程,以及南丫島榕樹灣的填海、道路及渠務工程,均在進行中。Zhejiang sea side of engineering limited located in the headquarters known as “ overseas seazan ” good name of the islands of the only state - level scenic spots - zhejiang shengsi
浙江海一方生物工程有限公司總部坐落於素有「海外仙山」美稱的唯一國家級列島風景名勝區? ?浙江嵊泗。On the western side, belcher bay reclamation and the construction of belcher bay link on it were completed in february 1997 to tie in with the opening of the western harbour crossing
在港島西面,卑路乍灣填海工程及在該填海區興建的卑路乍灣連接路,已在一九九七年二月竣工,配合西區海底隧道的啟用。So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing
本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。Report on sanitary assessment on finished water from seawater desalination plant in dachangshan island of changhai county
長海縣大長山島海水淡化廠工程衛生學評價報告Review of the proposed operation of marine sand winning at the identified marine borrow area east lamma prior to commencement of reclamation
在填土工程展開前,檢討在南丫島東部海洋借沙區採集海沙的建議In particular, a pair was found at pa tau kwu and their habitat would likely be affected by the disney theme park project so they may migrate to this nearby island. it is also the type locality for the endemic legless lizard
曾發現一對白腹海雕在大嶼山扒頭鼓巢居,迪士尼主題公園的興建工程展開后,其生境可能受影響,迫使它們遷徙至鄰近的周公島。Whether they are stable or not has an important influence on off shore construction and the safty of the buildings. based on the tests of silt in marine area of chengdao, silt ' s dynamic stress - strain relationship, dynamic strength and their influencial. factors are initial researched. liquefaction of silt, including mechanism, speciality and pattern, is also discussed
隨著海洋油氣開發的迅速發展,發現海上構築物的失穩與工程地基特性有著密切關系,而國內外幾大油氣開采區地基土中均有大量粉土分佈,本文的研究區? ?黃河水下三角州埕島海域也是如此。Sea bottom sediment characteristics and engineering geologic properties in the chengdao oil field sea area
埕島油田海域海底沉積特徵與工程地質特性The wdii will provide land to build a sound road network comprising the central - wan chai bypass, the island eastern corridor link, the mtr north hong kong island line, a fourth cross - harbour rail tunnel and other roads
灣仔發展計劃第二期工程將提供土地用作建設道路網,包括中環灣仔繞道東區走廊連接路地下鐵路北港島線第四條海底鐵路隧道和其他道路。The sea water supply system in tseung kwan o was completed in september 1998 while the major renovation work of the sea water supply system for central kowloon, central and western areas on hong kong island continued
將軍澳的海水供應系統於一九九八年九月建成,而九龍中部及港島中西區海水供應系統的大規模翻新工程則仍在進行。The construction of the methanol plant by our joint venture with cnooc s chemical division in hainan province is on schedule with trial production target in the third quarter of 2006
集團與中國海洋石油總公司旗下的化工部門在海南島合資興建的甲醇廠,工程現正如期進行,試產將訂於二零零六年第三季實行。Stiuated on the coast of picturesque xiangshan peninsul a and adjoining shipu, one of the four famousfishing ports in china, ningbo yongquan pharmaceutical equipmeent co., ltd. holds thememebership both of the association of chinese pharmaceutical equipment trade and of the association of chinese pharmaceutical equipment project. owner of elevn patents and winner of asilver medal for national invention, we specialize designing and manufacturing pharmaceuticalequipment
寧波永泉制藥設備有限公司座落在素有「東方不老島,海山仙子國」之稱的東海之濱象山半島,毗鄰石浦港(中國四大漁港之一) ,系中國制藥裝備行業協會成員單位、中國醫藥設備工程協會成員單位,專業從事制藥設備的設計與製造,產品已獲十一項國家專利和一項全國發明銀獎。Reclamation, road and drainage works at yung shue wan on lamma island are also in progress. construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o is scheduled for completion in early 2002
南丫島榕樹灣的填海、道路及渠務工程也在進行。大澳龍田?毗鄰的東北河堤建造工程及地盤平整工程,預定在二零零二年年初完成。Anti - scouring engineering for submarine pipeline in marine chengdao oil field
埕島油田海底管道沖刷及工程治理Pressing ahead with the implementation of the kowloon southern link ; commencing detailed design of shatin to central link ; beginning construction of the shenzhen western corridor deep bay link and assessing the viability and timing of the island line extensions and south hong kong island line
全速進行九南環線的工程展開沙田至中環線的詳細設計工作手籌建深港西部通道后海灣干線以及評估港島線延線和南港島線的財務可行性和施工時間表。The new shipyard will put into production in 2007, aiming to be a ship and ocean engineering repair base of the first class in the world
?洲島項目已於2004年12月16日開工,將於2007年建成投產,並逐漸建設成為世界一流的各類遠洋船舶和海洋工程的超大型修理基地。分享友人