混凝土船閘 的英文怎麼說

中文拼音 [húnníngchuánzhá]
混凝土船閘 英文
concrete lock
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : 名詞1. (水上的運輸工具, 船舶的通稱) boat; ship; vessels 2. (姓氏) a surname
  • : anchor gate
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝的地理位置和營運現狀,說明了在航道建設和水資源綜合利用中的作用及東溝改造的必要性;第二章東溝改造的主要技術因素確定其中包括東溝貨種和貨運量發展的預測,並確定東溝的設計代表型及營運組織;第三章東溝改造工程設計本章通過改造工程主要技術參數:規模、尺度、設計水位和高程等的確定,設計了二個改造方案,包括鋼筋整體塢式首結構、室和門的設計,並選定了啟閉機的主要技術參數和型式;第四章採用了工程項目經濟評估方法對東溝改造工程二個設計方案進行全面綜合比較后,確定了推薦方案。
  2. Concrete construction temperature control for water discharge culvert of tgp ' s shiplock in summer season

    三峽泄水箱涵夏季施工溫度控制
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. It is proved that polypropylene fiber concrete performs well in resisting impact, abrasion and crack, and thus well applicable in sandy flow region characterized in high speed and turbulence, such as the filling & emptying culvert of shiplock, etc

    表明聚丙烯纖維具有良好的抗沖耐磨性能和抗裂性能,可較好地應用於輸水廊道等處于高速、紊亂、含沙水流區。
  6. In combination with the application of lightweight aggregate concrete in construction of xinba lock hoist room, this paper discusses the technical features of lightweight aggregate and lightweight aggregate concrete, to promote the development of application technique of lightweight aggregate concrete, and broaden its application scope as well

    摘要結合新壩啟閉機房結構物工程中輕骨料應用,探討輕骨料及輕骨料的技術性質,以提高輕骨料砼的應用技術,拓寬輕骨料砼的應用范圍。
  7. The three gorges project is a world - famous water conservancy center project. the main parts of it are the body of concrete dam, permanent ship casket, electricity - produce department, etc. these are all large volume concrete which influence the ageing resistance of the project directly, and they also have much to do with ( he concrete of moderate heal portland cement armature and concrete aggregate, etc

    長江三峽工程,是舉世矚目的特大型水利樞紐工程,工程的主體:大壩壩體、永久,發電廠房等均為大體積,這些工程的耐久性既與施工質量有直接關系,也與組成壩體的小熱硅酸鹽水泥、骨料、鋼筋等原料有密切的關系。
分享友人