混凝土防滲墻 的英文怎麼說

中文拼音 [húnníngfángshèn]
混凝土防滲墻 英文
impervious concrete diaphragm
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Blasting monitoring and safety control during the demolition blasting of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰混凝土防滲墻拆除爆破震動監測與安全控制
  2. Test and research on asphalt concrete core of rock fill dam

    瀝青混凝土防滲墻施工技術
  3. Construction of plastic concrete impervious core in chaole water complex

    綽勒水利樞紐塑性混凝土防滲墻的施工
  4. Concrete anti - seepage wall are penetrated through the alluvial layer with high water permeability and put in the relative impermeable layer

    混凝土防滲墻穿過透水性強的沖積層,置於相對隔水層內。
  5. This paper analyzes and explores stress strain model and principle of the project of concrete diaphragm wall after concluding other engineers and project practices and describing the seepage and deformation character of the plastic concrete used in the cofferdam of the second stage of the three gorges project. we analyze and forecast the change trend by using mathematics statistics regression, then we get the best regression equation. finished it, we used this way to the cofferdam of the second stage of the three gorges project. it proves that the method which i have introduce in this article is effective for the stability of concrete diaphragm wall and it is also a valid for supervising cofferdam security after using it in many projects

    本文在總結前人和其他工程實踐的基礎上,結合三峽二期石圍堰實例綜合分析塑性混凝土防滲墻透和變形特性,對三峽二期圍堰砼的應力應變模型、原理進行了分析、探討,在監測分析資料的基礎上進行數學統計回歸分析,並對變形進行預測,通過對砼及堰體的應力應變監測數據進行數學統計回歸分析,得出了最佳回歸方程,並對三峽二期圍堰變形進行預測,達到了對圍堰安全性監測評價的最佳效果。
  6. Constructing underground concrete impervious wall for facing dam of lianghuei reservoir

    梁輝水庫面板壩水下混凝土防滲墻施工
  7. Experimental research of blasting demolition of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰混凝土防滲墻拆除爆破試驗研究
  8. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續是一種歷史較短的施工方法,目前,砼的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定的參數,利用非線性e - b模型,結合黃河小浪底石壩設計剖面,採用thepd石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  9. A design example is introduced in this paper where the concrete watertight wall with low elasticity module is used to strengthen the earth - rock dam of qing shan reservoir, and it is a new type of concrete watertight walls whose elasticity module and crush strength of its wall material lie between normal and plastic concrete

    本文是關于用低彈模砼加固青山水庫石壩的設計實例,其體材料的彈性模量和抗壓強度界于普通和塑性之間,是一種新型的混凝土防滲墻
  10. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大壩基礎混凝土防滲墻深度達85m ,厚度僅為1 . 0m ,規模和工程難度為國內之最,體應力比較復雜,本文研究了大壩施工填築竣工期、水庫蓄水運行期的應力和變形隨體參數的變化而變化的規律,為大壩安全設計及體材料的選擇提供了理論依據。
  11. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心和壩基的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎設計、壩基混凝土防滲墻與壩體體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘和壩基垂直方案、瀝青和壩基垂直方案以及粘斜心和壩基水平鋪蓋方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎與壩體體的結合型式以及塑性區大小的確定提供了重要依據。
  12. Application of seepage control wall technology of plasticity concrete in strengthen engineering of xiangshan reservoir

    塑性混凝土防滲墻技術在象山水庫加固工程中的應用
  13. Application of thin concrete seepage control wall in xidalongkou reservoir

    薄壁混凝土防滲墻技術在西大龍口水庫的應用
  14. During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum

    本文通過對歷次塌坑的原因分析及歷次塌坑處理措施的提出和對歷次塌坑處理效果的分析,論證了塌坑處理後能安全施工和投入正常運用;完善了在復雜地質條件及強漏地層混凝土防滲墻的施工工藝和施工方法;提出了對病險水庫加固及在地質條件復雜地層中修建混凝土防滲墻的施工要點;同時提出了在強漏地層修建的關鍵是在施工前通過預注漿封閉強漏通道的重要論點;對塌坑一些處理措施中的不足之處亦進行了分析研究,供國內類似工程借鑒。
  15. To be the wall material of gtdw, comparing with the conventional concrete diaphragm wall, plastic concrete has a much lower elastomeric modulus that approaches to that of the around soil. as a result, the deformation of the plastic concrete diaphragm wall under pressure will be similar with that of the around stratums. the stress state of the iii diaphragm wall is greatly improved and thus improvement will make it easy for the diaphragm wall to fit the stress changes by the thinner of wall or the frequent changes of the water level

    塑性作為抓鬥薄體材料,相比于普通彈性模量顯著降低,使其更接近於圍材料的變形模量,所以塑性混凝土防滲墻在其受力后的變形能很好地于周圍地層相協調,因而能大大改善的應力狀況,更好地適應體變薄及長江水位頻繁變化而帶來的應力變化。
  16. Review on asphalt concrete impervious wall of rockfill dam

    堆石壩澆築式瀝青混凝土防滲墻概述
  17. Development and applications of impervious asphalt concrete for embankment dams

    梁輝水庫壩基混凝土防滲墻的施工設計
  18. Through the analysis of the status of huangbizhuang reservoir and other problems, such as its destruction caused by water seeping, and with the reference to the internal successful application, the project adopted the measure of constructing concrete cut - off wall on body and foundation of the auxiliary dam between stake no. 0 + 840 and stake no. 5 + 740

    通過分析黃壁莊水庫現狀及存在的透破壞等問題,類比國內成功的工程實例,本工程副壩在樁號0 + 840至5 + 700採用在壩體和壩基建混凝土防滲墻處理措施。
  19. The concrete watertight wall is a kind of water conservancy engineering structures which is widely used and very important, and it can be classified as normal concrete and plastic watertight wall

    混凝土防滲墻是一種廣泛應用和十分重要的水工建築物,分為普通混凝土防滲墻和塑性混凝土防滲墻兩種。
  20. Construction of asphalted concrete cutoff wall in jubao hydropower station

    聚寶電站瀝青混凝土防滲墻施工
分享友人