渠道設計流量 的英文怎麼說

中文拼音 [dàoshèliúliáng]
渠道設計流量 英文
design discharge of canal
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 渠道 : 1. (引水灌溉的水道) irrigation ditch; canal; channel 2. (途徑) medium of communication; channel
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. The yellow river water environment information management system is a computer network system covering the whole basin, the construction of which includes a computer network construction and software development. the software involves database, gis, and man - machine interface. the investment in the system is huge and the period of construction is long, thus, a good design is very important. the design schemes are summarized in this paper. according to the present computer technology, some new methods used in network design and software development are introduced, and it is suggested that expandability and opening of the system should be considered in system construction

    黃石?水電站輸水地處地質結構比較復雜的地方,由於建成投運的時間較早,且原的標準較低,糙率較大.在電站機組已更新改造的情況下,若不進行輸水挖潛改造,已難于滿足電站機組的要求.經反復比較,決定採取減小糙率的方案,對輸水進行三面光護面加固防滲,增加過,效果很好
  2. Based on optimization theories of genetic algorithms and the linear programming, a series of optimal design mathematics models and methods of water transmission conduits and water distribution networks have been presented, in the light of their characteristics. the results are as follows : 1 the linear programming models and calculations of the pressure gravity conduit, the gravity pressure conduit and channel, the pressure conduit with pump station and the pressure conduit in considering pump station flow variations are presented respectively

    本文針對不同類型的輸水管線和配水管網系統的特點,應用遺傳演算法和線性規劃等優化理論和方法,對其優化問題進行了較為系統的研究,成果如下: 1分別建立了重力輸水管系統、重力輸水管系統、泵站加壓輸水管系統以及考慮變化的泵站加壓輸水管系統優化的線性規劃數學模型,並提出了算方法。
  3. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾上段太平橋以上45m ~ 3 s , 1989年9月30日實測通水23 . 8m ~ 3 s時,東一乾郝灣渡槽出口漸變段末端水位已達到水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾上段目前僅能通過24m ~ 3 s左右,只有值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使經常處于小、高水位運行,延長了次通水時間,大大增加了工程的安全管理難度。
  4. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    縱橫斷面優化方面,本文在利用已經比較成熟的縱橫斷面優化理論的基礎上,提出以工程總費用最小為目標函數,以縱坡i為控制變,以不沖不淤速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分法工程土方,從而大大提高了土方的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程方法、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的優化方法及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  5. In any case, the channel can always be designed in a manner which allows the flow to be monitored and if necessary controlled to address any concerns

    而且,有關投資可以令資金受到監察,如有需要,甚至受到管制。
  6. Although the canal conduit capacity does not change very much than design discharge, the canal erosion due to many years scour already damaged the canal stability. therefore, taking efficient measures should protect the canal

    然而對于北部引嫩來說,盡管大部分下輸水能力並沒有什麼明顯的損失,但的橫向坍塌拓寬已危及堤岸的安全,應及時採取防治措施加以治理。
  7. In order to solve the conflict of supply and demand, firstly, this particle discusses the characters of the national budget investment the emission of stock, attracting foreign capital and invest direct, domestic banks " loan, international financial organizations and foreign governments " loan, and the emission of bond, the bot mode and other financing manners. also, the particle analyses the resources of each financing manner and characters concretely. then, it analyses the scale, cost, construction and manner of highways " raising project, and it emphasizes banks " loan domestic and overseas, the emission of stock and bond, the attornment of highway ' s charge rights, the capital cost of bot financing manner, and uses the model to calc ulate the compositive capital cost, then build the worst ( in the worst environment hypothetically ) and the best scheme ( in the best environment hypothetically ) accordingly, after the comparison, we can obtain the status of the project ' s net cash flux, the debt ' s endurance capability, income and a series of data in any possible state, so that to get the optimized scheme and prepare for the scientific decision

    為了解決資金的供需矛盾,本文首先論述了國家預算內投資、發行股票、吸收國外資本直接投資、國內銀行貸款、國際金融組織和外國政府貸款、發行債券、 bot方式等融資的特點,具體分析了各融資方式的資金來源及它們的特點;接著分析了公路項目籌資的規模、成本、結構和方式,重點分析國內外銀行貸款、發行股票和債券、轉讓公路收費權、 bot融資方式資金成本,用模型的方式具體算綜合資金成本,建立相應的最差方案(在假的最差條件下)和最佳方案(在假的最好條件下)與之進行比較,獲取在各種可能條件下的項目凈現金狀況、債務承受能力和收益情況等一系列數據,確定整體最優方案,為科學決策做準備。
分享友人