渠首工程 的英文怎麼說

中文拼音 [shǒugōngchéng]
渠首工程 英文
canal headwork
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  • : Ⅰ名詞1 (頭) head 2 (首領) leader; head; chief 3 (表示方位) aspect 4 (姓氏) a surname Ⅱ動...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. As a brand new supporting structure, the steeve - arch was firstly used in the design of tangyu aqueduct ( also used as a bridge ) lies on the eastern main ditch of shitou river, shaanxi province

    吊桿式拱架作為一種新型拱式支承結構在陜西省石頭河東乾湯峪渡槽(橋渡結合)設計中創應用。
  2. The ancient project consists of three major projects, namely the yuzui water - dividing dike, the feishayan spillway and the baopingkou water inlet as well as some sub - project baizhang dike, shunshui dike at erwang temple and renzi dike

    渠首工程由魚嘴分水堤、飛沙堰溢洪道、寶瓶口引水口三大主體和百丈堤,二王廟順水堤、人字堤等主要附屬組成。
  3. Study on automation for hydrologic monitor of headwork of xiaohe irrigation district

    山西省瀟河灌區樞紐水文監測自動化研究
  4. Hydraulics test research on diversion sluice for extension project of taocha canal headwork

    陶岔樞紐擴建引水閘水力學試驗研究
  5. This system had been applied to strobe engineering of tongjiyan and run well

    該系統已經在通濟堰取水閘門中投入使用,取得了良好的運行效果。
  6. As one of the three main parts of the dujiangyan irrigation system, it controls the water that flows into the baopingkou water inlet and discharges flood and sand with its top graphical feature

    巧妙利用河道地形的泄洪排沙,為控制內江進水量的關鍵所在,是都江堰渠首工程三大主體之一。
  7. Contractors who are confirmed in the list of approved contractors for public works for group c in the roads and drainage category or joint ventures with participation of local and or overseas contractors with the lead participant or the major shareholder who is confirmed in the list of approved contractors for public works for group c in the roads and drainage works category are invited to tender

    現邀請名列認可公共承建商名冊上獲準承投道路及的丙組承建商經確認者,或由本地和或海外承建商所組成的合營企業其席參與者或主要股東必須是名列認可公共承建商名冊上獲準承投道路及的丙組承建商經確認者,承投這次招標項目。
  8. And then this text made the countermeasures of building credit risk management system : the first, good credit culture should be formed to build the cultural foundation of risk management of credit ; secondly, the structure of risk management should be improved to block up the loopholes of current risk supervision mode ; besides, credit collection system should be built as the guarantee because credit measure models needing accurate reliable datum ; most important, to achieve the revolution of credit risk management, credit risk models should be set up ; finally, chinese commercial banks need took measures to manage credit risks, including the adoption of asset securitization and credit derivative securities

    最後是打造信用風險化管理體系的對策部分:先是要構建良好的信用文化,打造信用風險管理的文化基礎;其次要構建全面的風險管理模式,完善信用流監控漏洞;同時,度量模型需要準確可靠的數據來源,因此需要完善的徵信體系作為保障;最重要的,是建立先進的信用風險模型,實現信用風險量化管理的革命;最後還需要引入多樣的風險轉移手段,疏通信用風險緩釋道。
  9. The first tertiary sewage treatment plant in hong kong will be built in ngong ping, lantau with the award of a hk $ 233 million contract by the drainage services department

    務署批出一份價值二億三千三百萬元的合約,在大嶼山昂坪興建全港間三級污水處理廠。
  10. Through analysis and study, it is believed important and feasible that the implemented projects, the importing feng jia - shan reservoir into yang mao - wan reservoir and the water supply from shi tou river to xi ' an city ; form the synthetic analysis of the main factors - quantity, time, apace and user " character, it can be conferred that it is not necessary for the four projects in the western areas to join together at present ; adding gate at the 2 head of lin jiacun trench can only help to relax the problem of lack of water in bao jixia irrigation area, to solve the problem of short of water in the irrigation area needs to take project measures at the trunk and branches of wei he river from lin jia village to the upper stream ; the mode of supplying water of the four projects in the western areas are all by gravity, they can only be supplied one way and ca n ' t be supplied each other

    通過分析研究認為:已實施的引馮濟羊和石頭河西安供水,是十分必要的和可行的;從水資源配置的主要要素? ?數量、時間、空間和用戶性質的綜合分析研究來看,西部四大目前尚無整體聯網的必要;林家村加閘對解決寶雞峽塬上灌區缺水僅能起到緩解作用,從根本上解決塬上灌區的缺水問題,還必須從林家村以上渭河干支流上採取進一步的措施;西部四大均為重力供水,只能單補,而不能互補。
分享友人